Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

VALVE ASSEMBLY

Active
N0010426QFF57Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract pertains to the procurement of a specialized valve assembly designated as SPECIAL EMPHASIS material (Level I) due to its critical role in a shipboard system, where failure could result in catastrophic consequences including loss of life or vessel. The contract mandates strict compliance with technical specifications, traceability requirements, and quality assurance protocols, including full chemical and mechanical certification of materials such as ASTM-B369, QQ-N-281, QQ-N-286, and SAE-AMS-QQ-S-763. Every component must be traceable from raw material to finished assembly through unique heat, lot, or batch numbers permanently marked on the item or affixed via durable tags; this traceability must be retained through all manufacturing, subcontracting, and assembly steps. The contractor must operate under a certified ISO-9001 quality system with calibration standards aligned to ISO-10012 or ANSI-Z540.3 and must permit Government inspection at source at any time during production. All materials supplied must be free from mercury, and welding, brazing, and heat treatment must adhere to Navy-specific procedures outlined in S9074-AQ-GIB-010/248 and S9074-AR-GIB-010A/278, with submission of qualified procedures and personnel certifications prior to execution. Radiographic testing, ultrasonic inspection, liquid penetrant testing, and pressure testing are required on specific components and must conform to Navy-approved standards with all results documented and submitted for review. Production radiography requires submission of shooting sketches, films, reader sheets, and traceable documentation at least 45 working days prior to shipment, with final Navy acceptance mandatory before delivery. Fasteners must be meticulously marked with material symbols, manufacturer IDs, traceability codes, and, in the case of self-locking screws, six distinct dots—each marking must remain legible after any coating. Each final assembly must include a nonferrous metal tag stamped with CID 884375122 and be accompanied by a signed Certificate of Compliance verifying full conformance with all specifications, drawings, and test requirements. The contract includes a 365-day delivery schedule from contract effective date and is issued under Emergency Acquisition Flexibilities with a DO rating under the Defense Priorities and Allocations System, requiring priority handling. All subcontractors must be vetted for capability, and their work must comply with the same traceability and certification mandates as the prime

General Info

Procurement of critical Level I valve with strict traceability, alloy specs, testing, and Navy approval per DO-rated defense priority.

Agency

Department Of Defense → Navsup Weapon Systems Support MechView Agency

NAICS

332919 - Other Metal Valve and Pipe Fitting ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support Mech
View Agency Profile
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more

CONTACT INFORMATION|4|N743.49|WVC|771-229-0573|benjamin.t.spangler.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A |N/A|SEE DD FORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL BENJAMIN.T.SPANGLER.CIV@US.NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference toN00102 within this order should be updated to N50286. 3. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. RADIOGRAPHIC SHOOTING SKETCHES (RSS) 45 DAYS ADC SD APPROVAL OF RADIO RSS 30 DAYS AFTER RECEIPT PRODUCTION RADIOGRAPHY (PR) 135 DAYS AFTER APPROVAL OF RSS SD APPROVAL OF PR 30 DAYS AFTER RECEIPT PNSY review/acceptance of Certification CDRLs 6 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract. 4. Any contract awarded as a result of this solicitation will be "DO" rated order; "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 5. NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers in accordance with DFARS 252.204-7024. 6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contracts Opportunities on the Government's SAM.gov website. After requesting access, send an email to the Primary POC listed on the solicitation. 7. This requirement requires access to classified drawings. These drawings are not required to submit a quote, however, in the event of an award, a facility clearance may be required in accordance with FAR 52.204-2. 8. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254). The classified documents and security level are: ;4456141 - CONFIDENTIAL; 2.3 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.3.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.3.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.3.3 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. DRAWING DATA=PY-56440 |53711| -|LR |D|0001 | -|49998|0130001 DRAWING DATA=PY-69464 |53711| -|LR |D|0001 | -|49998|0145978 DRAWING DATA=PYR-11077 |53711| -|LR |D|0001 | -|49998|0357083 DRAWING DATA=PYR-12964 |53711| -|LR |D|0001 | -|49998|0061123 DRAWING DATA=PYR-16976 |53711| -|LR |D|0001 | -|00026|0000000 DRAWING DATA=PYR-17002 |53711| -|LR |D|0001 | -|00026|0000000 DRAWING DATA=PYR-17853 |53711| -|LR |D|0001 | -|00026|0000000 DRAWING DATA=PYR-19328 |53711| -|LR |D|0001 | -|49998|2737322 DRAWING DATA=255584 |43689| J| |D|0001 | J|00026|0000000 DRAWING DATA=255588 |43689| M| |D|0001 | M|49998|0402200 DRAWING DATA=4384678 |80064| C| |D|0001 | C|49998|1136401 DRAWING DATA=4456141 |80064| A| |X|0001 | A|00026|0000000 DRAWING DATA=4637511 |53711| M| |D|0001 | M|49998|0129887 DRAWING DATA=4637512 |53711| R| |D|0001 | N|49998|0699735 DRAWING DATA=4638011 |53711| K| |D|0001 | K|49998|0764964 DRAWING DATA=4638328 |80064| J| |D|0001 | J|49998|0204180 DRAWING DATA=632D-M-1739 |80064| B|LR |D|0001 | B|00026|0000000 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=FF-S-86 | | |G |210127|A| | | DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B150 | | | |190401|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A| 2| | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=ASTM-B367 | | | |220401|A| | | DOCUMENT REF DATA=ASTM-B369 | | | |200401|A| | | DOCUMENT REF DATA=ASTM-A574 | | | |211201|A| | | DOCUMENT REF DATA=ASTM-F606 | | | |191115|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| |01| DOCUMENT REF DATA=SAE AMS 2631 | | |E |171201|A| | | DOCUMENT REF DATA=SAE AMS 6931 | | |D |171201|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-18240 | | |F |000313|A| 1| | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=SAE AMS-QQ-S-763 | | |D |150301|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markings to each unit throughout refurbishment. 3.1.2 IDENTIFYING MARKINGS - Part must have a MIC (Material Identification a and Control) code, heat/heat lot code, or unique Contractor traceability number/code that is visible on the part. See Material Traceability in paragraph 3 (Quality Assurance Provisions) of this contract for traceability requirements. The MIC code can consist of a 2, 3, or 4 letter material identifier, 4 or 5 digit Julian date, 3 digit lot serial number, and Certifying Activity Designator (CAD) which will be 1 or 2 letters; the 4 parts are normally separated by hyphens; examples: TIA-3089-30-QQ and ST-06262-506-A. 3.1.3 RE-USEABLE PARTS - - Any parts of the original assembly that are useable (replacement is not necessary), that are properly marked as identified above, and that have material certifications available may be utilized as initially supplied. Certifications are not required to be resubmitted by the contractor. - Any parts of the original assembly that are useable (replacement is not necessary), are properly marked as identified above, but material certifications are not available at the contractor's facility, a waiver must be submitted in accordance with Waiver/Deviation (Configuration Control) requirements specified elsewhere in the Contract. 3.1.4 NON-USEABLE PARTS - -Any parts of the original assembly that are not properly marked as identified above must be replaced and the required certifications must be submitted. - Any parts of the original assembly that are not usable (replacement is necessary) must be replaced and the required certifications must be submitted. 3.1.5 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;Newport News Drawing 4637511 Assembly 99, liabilities PYR-11077, PYR-16976, PYR-17002, PY-56440, PY-69464, PYR-17853, PYR-19328, PYR-12964, 632D-M-1739B, and Maintenance Standard No. 5850-081-034 REV J CHG-14 (CSD440); , except as amplified or modified herein. This applies to all "Parts Requiring Certification" as identified elsewhere in this Contract/Purchase Order. 3.1.6 ADDITIONAL SOW REQUIREMENTS - ;N/A; 3.2 ;The angular tolerance for the 30 degree seat angle of the ball check fitting, Item 11 of drawing 4637512, is +/- 0.5 degrees.; 3.3 ;Tolerance for drawing 4637511 Pieces 81, 82, 86, and 87 are +/- .005 inches.; 3.4 ;The pellet item 20 of drawing 4637512 must have a depth of 0.25 +0.03125/-0.0 inches.; 3.5 ;Drawing 214091 does not apply.; 3.6 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body, item 41 on drawing 4638011; Material - ;ASTM-B369, UNS C96400; Part - ;Hex Plug, item 80 on drawing 4637511; Material - ;SAE-AMS-QQ-S-763, Class 304 or QQ-N-281, Class B, Cold Drawn; Part - ;Self-Locking Socket Head Cap Screw, Items 75 and 78 on drawing 4637511; Material - ;QQ-N-286, Annealed (hot finished or cold drawn), and age hardened to be in accordance with FF-S-86, Type VI with Self-locking element to be in accordance with MIL-DTL-18240; Part - ;Seal housing, item 1 on drawing 4637512; Material - ;QQ-N-281, class A, form 1, hot finished; Part - ;Stem, item 9 on drawing 4637512; Material - ;ASTM-B150, alloy C63200, temper TQ50; Part - ;Ball Check Fitting (Q3), item 11 on drawing 4637512; Material - ;QQ-N-281, Class A, Form 1, Cold drawn (stress relieved); Part - ;Static Seal Stem, item 2 on drawing 4637512; Material - ;QQ-N-281, class A, form 1, hot finished; Part - ;Actuator Piston, item 42 on drawing 4638328; Material - ;ASTM-B150, Alloy C63200, Temper TQ50; Part - ;Knife, item 4701 on Drawing 4638328; Material - ;QQ-N-286, Form 2, Hot finished, Annealed and Age hardened; Part - ;Spherical Ball, item 12 on drawing 4637512; Material - ;QQ-N-286, Annealed (Hot Finished or Cold Drawn) and Unaged or QQ-N-286, Annealed (Hot Finished or Cold Drawn) and Age Hardened; Part - ;Back-up Ball, item 7 on drawing 4637512; Material - SAE-AMS-6931 OR Centrifugally cast 6AL-4V, ASTM-B367, Grade C-5, with mechanical properties as listed in supplementary Requirement S6. Note: Mechanical properties for bars, forgings and forging stock over 10" must be as specified in the applicable drawing. If the mechanical properties are not provided in the drawing, the mechanical properties specified in SAE-AMS-6931 Table 2 for material 6" to 10", must be applied. Part - ;Seats (Q3), piece 17 on drawing 255584; Material - MD71-GG Mearthane (Graphite Filled Urethane). Material must be manufactured by Mearthane Products Inc. Cranston, RI. (Properties Specified Below Only) ITEM PROPERTY ASTM TEST METHOD VALUE (A) Hardness D2240 70 +/- 5 Shore D (B) Specific Gravity D792 1.18 +/- 0.02 (C) Tensile Strength D412 (DIEC) 5000 PSI MIN (D) Compression-Defl D575 700 PSI MIN @ 2% DEF. (E) Tensile Impact D1822 300 FT-LB/SQ IN (Note 1) (TYPE L SPECIMEN) (F) Water Absorption D570 1.5% MAX (1 Week at R.T.) Note 1: These values are minimum averages. Separate specimen values may not vary more than 25% under the specified minimum. 3.7 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Attribute - Annealing and Age Hardening Item - ;Self-Locking Socket Head Cap Screw, item 75 on drawing 4637511; Self-Locking Socket Head Cap Screw, item 78 on drawing 4637511; Spherical Ball, item 12 on drawing 4637512; Knife, item 4701 on drawing 4638328; Performance - QQ-N-286 Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 Test - Intergranular Corrosion Test (Only for SAE-AMS-QQ-S-763, Classes 304-condition A, 304L, 316-condition A, 316L, 317-condition A, 321 and 347 material. Test must be performed prior to fabrication/machining) Item - ;Hex Plug, item 80 on drawing 4637511; Performance - SAE-AMS-QQ-S-763 Acceptance - SAE-AMS-QQ-S-763 Test - ;Liquid Penetrant Inspection; Item - ;Self-Locking Socket Head Cap Screws, items 75 and 78 on drawing 4637511; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - Weldability Test of ASTM-B369 material Item - ;Body, item 41 on drawing 4638011; Performance - ASTM-B369 Acceptance - ASTM-B369 Test - ;Pressure and performance tests; Item - ;Each valve assembly; Performance - ;CSD440 steps 1.aa through 1.ab; Acceptance - ;CSD440 steps 1.aa through 1.ab; 3.8 Radiography is required on ;Body, item 41 on drawing 4638011; . 3.9 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;Drawing 845-4456141 Rev A; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the working pressure on the item does not apply and is strictly prohibited. 3.10 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.11 Wedge Tensile Test Specimens (Headed fasteners) - A wedge tensile test must be conducted on a Full Size Fastener for each production lot and reported aspart of the Mechanical Properties. The required specimens for the Wedge Tensile Test must be separate fasteners from those required for the Yield Test. 3.11.1 Testing for Socket Head Cap Screws must be in accordance MIL-DTL-1222, paragraphs 4.5.2.3 and 4.5.2.3.1. 3.11.2 Testing for all other Headed Fasteners with a nominal diameter greater than 1/4-inch must be in accordance with ASTM-F606 for grades 5, 8, B7, and B16.For all other grades, the following wedge angles must be used. a. Except as specified in item c below, fasteners with a nominal diameter of 1/4-inch through 1-inch (inclusive) must be tested with a ten degree wedge. b. Except as specified in item c below, fasteners with a nominal diameter over 1-inch must be tested with a six degree wedge. c. Fasteners that are of grades 8, B7, B16, 410, 416, 416Se, 431, and 630 and are threaded within one diameter to the underside of the head must be tested as follows: Sizes 1/4 inch through 3/4 inch (inclusive) Use a six degree wedgeSizes over 3/4 inch Use a four degree wedge d. Fasteners which have passed testing with wedge angles greater than those specified should be considered acceptable. 3.11.3 For fasteners having a length less than the minimum specified in Table 1 of ASTM-F606, one "test specimen fastener" must be manufactured from each lot of fasteners and tested to represent that lot. The length of these test specimen fasteners must meet the minimum specified in table 1 of ASTM-F606 but must not exceed it by more than 1/4 inch. Test specimen fasteners must be the same type, style, and diameter as the production lot and must be manufactured from the same starting material, using the same manufacturing techniques as the production lot, and must be heat treated (if required) along with the production lot. 3.12 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.13 FF-S-86 mechanical property and metallographic testing sample sizes must use ASQ Z1.4 Inspection Level S-1 with AQL = 1.0.NOTE: The sample size values must conform to FF-S-86E and earlier revisions. 3.14 A visual inspection shall be performed on the finished seat with acceptance criteria on critical surfaces per CSD167 in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/. 3.15 Seat Stack Height Measurement - To ensure that each seat is within tolerance, check each seat singularly by measuring the seat height over the ball. This measurement is calculated by adding one-half ball diameter to the half stack height dimension on the drawing. Limits are determined by the ball diameter tolerance and the half stack height tolerance. Check dimensions by measuring from the seat back face to top of ball. Manufacturers of seats that do not have a ball of the required size available will be required to manufacture a dummy ball or segment of a ball with sufficient spherical surface to check the above dimension. 3.16 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.16.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.16.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.16.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.17 Chemours Company (formerly DuPont) Teflon Coating 850G-204 and 852G-201. Use of Chemours Company (formerly DuPont) Teflon Coating 851N-204 and 852N-201 is acceptable until exhausted - Teflon coating of ball(s) must be in accordance with general note ;4.F.; of drawing ;4384678; . 3.17.1 Naval Ordnance Systems Command OD 10362 First Revision dated 15 Aug 1961 is provided by Contract Support Library Reference Number CSD018 in ECDS at https://register.nslc.navy.mil/ 3.17.2 CSD099 provides guidance for acceptance/rejection of teflon-coated valve balls after valve assembly production testing. 3.18 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD099 and CSD440; in ECDS at https://register.nslc.navy.mil/ 3.19 Ball Spherical Surface Waviness - Unless otherwise specified on drawing, all sealing area surfaces must have a spherical surface waviness which does not exceed 0.0005 inches of height per inch of spherical surface. Roughness and waviness ratings must apply in a direction which yields the maximum rating, normally perpendicular to the lay. 3.20 ;Surface waviness must be verified prior to Teflon coating.; 3.21 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories: Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: (304) 526-5889 FAX: (304) 526-5973 Metallurgical Consultants, Inc. Attn: W. M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: (713) 526-6351 FAX: (713) 526-2964 Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500 Macarthur Blvd West Bethesda, MD 20817-5700 Phone: (301) 227-5032 FAX: (301) 227-5576 Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave. Monroe, NC 28110 Phone: (704) 289-4511 FAX: (704) 289-4269 Westmoreland Mechanical Testing and Research Inc. Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388 Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI) Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194 FAX: 011-49-0203-9994415 ThyssenKrupp VDM USA, Inc. Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939 Phone: (281) 955-6683 3.22 Specification Change - For QQ-N-281, Class B material: 1 - Footnote 9 to Table II of QQ-N-281 does not apply. 2 - When starting material is Round Bar greater than 3" dia, the mechanical properties of Hex Bar apply. 3.23 K-MONEL Fasteners - Material must be heat treated per QQ-N-286. 3.23.1 Fasteners that have been hot or cold headed or roll threaded must be solution annealed followed by age hardening subsequent to all heading and thread rolling operations. The mechanical properties on certifications must be actual properties of the annealed and age hardened material and must meet the requirements of QQ-N-286. 3.23.2 QQ-N-286 fasteners that have been headed and/or roll threaded must not beage hardened unless the material has been solution annealed subsequent to the heading and threading operations. Threads formed after the final age hardening heat treatment must be cut or ground only. 3.24 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.25 Component Identification Description (CID) - A nonferrous metal tag stamped with the CID number ( ;CID 884375122; ) must be securely attached to each assembly with nonferrous wire. No assembly must be shipped without the CID number attached. 3.26 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing, personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Repair welding is not permitted on ;QQ-N-286 material; . Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.27 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.27.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.27.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.27.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.28 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.29 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.29.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.30 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.31 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.32 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.32.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/non-acceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.32.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.32.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.32.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.32.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.33 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.33.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.33.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.34 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.35 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.35.1 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.35.2 The prime contractor must ensure that the purchased product conforms to specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.35.3 The prime contractor must evaluate the requirements of the contract and select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.35.4 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.36 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.36.1 Visual examination upon receipt to detect damage during transit. 3.36.2 Inspection for completeness and proper type. 3.36.3 Verification of material quality received. 3.36.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.36.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.36.6 Identification and protection from improper use or disposition. 3.36.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.36.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.36.9 Material returned to the contractor must be handled as GFM. 3.37 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.37.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein. 3.38 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number for metallic material or batch of non-metallic material, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.38.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.38.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.38.3 Permanent marking must be legible and must be located so as to not affect the form, fit, and function of the material. ;Ball to be marked in the waterway and Seats are to be marked on the outer cylindrical surface.; 3.38.4 Seat Marking - Each seat must be permanently marked in accordance with MIL-STD-792, type I and as stated below, except for Teflon seats, which must only be tagged. Type IX marking may be substituted for type I, provided the minimum character size scribed by the marking tool must be approximately 3/32 inch high to insure legibility. Permanent marking is not permitted on Teflon seats. Seat marking requirements must maintain complete traceability to certification OQE. Seat marking must be either heat/lot or batch number, a vendor traceability number/code, or a combination thereof and must be unique to the material certification. 3.38.5 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the item identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.39 See CDRL-DI-MISC-81020 (Chemical and Mechanical) and CDRL DI-MISC-80678 (SEAT MATERIAL) - Material Certifications - The following material certification requirements apply: 3.39.1 Metallic Material - Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.39.2 Non-Metallic Material - The Contractor must furnish the applicable test reports for each heat/lot/batch of seat material. Material certification test reports must include, in addition to the specification, the class, form, grade, type, process, and/or composition, as applicable, of the material supplied. 3.39.3 Re-identification and re-certification of metallic material is required when the material is subjected to a process which alters its properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability marking used with the altered material and at a minimum contain the information below. TRACEABILITY MARKING________________________________________________ (marking on finished item) IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO HEAT/LOT NUMBER _______________ AND HEAT TREAT NUMBER ______________________ (when applicable) _________________________________________ DATE _____________________ (name and signature of auth. co. rep.) 3.39.4 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.39.5 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.39.6 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.40 Material Handling - The written material control process must include the following: 3.40.1 All raw materials must have traceability markings (except as specified below). 3.40.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.40.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.40.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. 3.40.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.40.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.41 Receiving Inspection 3.41.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.41.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.42 Discrepancy Reporting 3.42.1 Nonconforming products must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records will be maintained and available for review by the government Quality Assurance Representative (QAR). 3.43 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.43.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.43.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.43.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.43.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible. 3.43.5 Sampling for certification of non-metallic material must be on the basis of one set of test specimens from each heat/lot or batch. 3.44 Additional Marking for Fasteners - Fasteners must be marked in accordance with ;MIL-DTL-1222; . The method of marking must be types I, II, III, V, VIII or IX of MIL-STD-792 except for grades 410, 416 and 431 in the H condition and grades 8, 630, A574, and 4340 which must be marked by method II when marking is applied after the final heat treatment. Markings on fasteners that are to be coated must be marked prior to coating and have a minimum depth of 4 mils. Traceability marking must be legible after the application of protective compounds. 3.44.1 Marking is required for all fasteners regardless of size and must include the material symbol, the manufacturer's identification symbol, and the traceability marking. Marking must be applied on the head of headed fastener (top preferred, side location if necessary). Self-Locking screws must also be marked with six dots. Where no contract invoked specification requirement exists for this marking, self-locking fasteners must be marked with six dots approximately .032" diameter, raised or depressed by approximately .010" located on the top perimeter of the head of the fastener in an arc or circular pattern. The six dots must be distinguishable from all other required markings. 3.45 Radiography (RT) - Radiography must be performed in accordance with T9074-AS-GIB-010/271. RT acceptable criteria for castings to be criticality level I per the applicable table of S9074-AR-GIB-010A/278. RT acceptance criteria for weldments to be per the applicable table of S9074-AR-GIB-010A/278 (P-1 piping) or MIL-STD-2035, class 1, as applicable. 3.45.1 See CDRL DI-MISC-80678 (RSS) - The Contractor or activity performing the radiography must be responsible for preparing the radiographic shooting sketches (RSS) in accordance with T9074-AS-GIB-010/271. Shooting sketch approval is not required for radiography of weldments. The radiographic standard shooting sketches (RSSS) referenced on the applicable drawing may be used, however, since T9074-AS-GIB-010/271 permits a variety of processes, the RSSS may not be applicable as they will not necessarily depend only on the coverage requirements, but also on the equipment and procedures of the particular radiographic facility. Approval of these shooting sketches or radiographic standard shooting sketches is required per S9074-AR-GIB-010A/278. If this data has been previously approved by a Navy activity, the original approval letter must be submitted at the same time as RT film and reader sheet submittal. 3.45.2 All pieces radiographed must be permanently marked with "RT" and a unique RT serial number. (The unique RT serial number must be directly traceable to the RT film.) 3.45.3 See CDRL DI-MISC-80678 (Production Radiography) - Production Radiography requires final acceptance by the Navy. The items listed below must be submitted for final acceptance, cataloging, file, and retention. They must be submitted and approved prior to shipment of the applicable hardware. However, when the source certification clause is invoked, they must be submitted a minimum of forty-five (45) working days prior to the date of source certification inspection. (a) Film (b) RSS/RSSS (c) RS (Reader Sheets) (d) Documentation record listing the part number, heat/lot traceability, and theunique RT serial number (which is traceable to the RT film and reader sheet) 3.46 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds when the conditions of Section 4.2.1.1 of S9074-AR-GIB-010A/278 are met. 3.46.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.46.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'') 3.46.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.46.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.46.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.46.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.46.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.46.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.46.9 When production or repair welding is required on titanium materials, the applicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.46.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.46.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified thateach LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.46.12 When production welds or repair welds are performed by a subcontractor,the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.47 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address and date. 2. The contract/purchase order number (for example: N00104-11-P-FA12) 3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable). 5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily. 9. Contractor's or authorized personnel's signature. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCM

Similar Contracts

Same NAICS industry code

NAICS: 332919
New
DIBBS
STEM, NEEDLE VALVE
Solicitation # SPE7M4-26-U-0404
The contract solicitation SPE7M4-26-U-0404 seeks the supply of 2,445 units of a STEM, NEEDLE VALVE with NSN 4820014730651 under a Firm-Fixed-Price arrangement, with delivery required within 126 days after award and FOB Origin terms. The item is subject to stringent packaging requirements under MIL-STD-2073-1E, including clean/dry preservation without chemical treatments, unit packaging in fiberboard boxes, intermediate containment of 100 units per box, and outer packaging marked in accordance with MIL-STD-129, which mandates 2D Data Matrix barcodes and excludes any special marking. Palletization must comply with DLA Packaging Requirements for Procurement (RP001) and hazardous materials handling standards, requiring labeling per 29 CFR 1910.1200 and submission of material safety data prior to award if applicable. Inspection and acceptance occur at the destination, with full government responsibility for verifying compliance with technical, packaging, and marking standards, including adherence to the DLA Master List of Technical and Quality Requirements. The contract operates as an Indefinite-Delivery Contract with a maximum ceiling value of $350,000, containing a guaranteed minimum of 366 units after binding, and imposes ordering limits of 611 EA minimum and $350,000 maximum per order, with a seven-day aggregation cap for orders from the same office. Contractual obligations are not triggered until the first delivery order is accepted, and all shipments via ocean transport must use U.S.-flag vessels unless a formal waiver is granted at least 45 days in advance. Compliance with a wide array of Federal Acquisition Regulation and Defense Federal Acquisition Regulation Supplement clauses is mandatory, including requirements for cybersecurity safeguarding, trafficking in persons prevention, employment eligibility verification, sustainable product procurement, prohibition of hexavalent chromium, export control, electronic payment via WAWF, and safeguarding of covered defense information. Offerors must provide their Unique Entity ID and CAGE code, disclose size and socioeconomic status (including WOSB, SDVOSB, HUBZone, or SDB certifications), and affirm compliance with restrictions on procurement from Communist Chinese military companies and prohibited telecommunications equipment. All proposals must be submitted electronically via the DLA-BSM Internet Bid Board System by the July 31, 2
FLUID HANDLING DIVISION

POSTED

about 14 hours ago

DEADLINE

in 4 days
View Details
NAICS: 332919
New
Federal
TEE ASSEMBLY
Solicitation # N0010426QFG04
This contract, issued under solicitation N0010426QFG04 by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania, governs the supply of a specialized Tee Assembly designated as SPECIAL EMPHASIS material (Level I) for critical shipboard systems, where failure could result in catastrophic loss of life, vessel damage, or system failure. The product must strictly conform to Naval Sea Systems Command Drawing 845-2445109, with detailed requirements for material composition, including MIL-C-24679 Alloy C71500 for the Tee and QQ-N-281 Class A for the Plug, and mandates quantitative chemical and mechanical analysis for traceability. All components must be manufactured and inspected in accordance with a comprehensive set of military and international standards including MIL-STD-2035, MIL-STD-792, ISO-9001, and FED-STD-H28, with thread inspection requiring System 21 unless otherwise specified and no use of molybdenum disulfide lubricants permitted. The assembly requires a 1050 PSI hydrostatic test for three minutes with zero leakage or deformation, and all welding and brazing must follow approved procedures from S9074-AQ-GIB-010/248 or S9074-AR-GIB-010A/278, with procedures and qualification data submitted for prior government approval. Electronic signatures are accepted for certification documents under strict controls, and all material must be permanently marked with traceable identifiers linked to certified test reports, with tags required for small or machined surfaces. Quality assurance is stringent and continuous, requiring full compliance with ISO-9001 and ISO-10012 or MIL-I-45208 and MIL-STD-45662 for quality and calibration systems, subject to government audit at any time. The contractor must maintain traceability from raw material through all manufacturing and subcontracted processes, with certification documentation submitted via Wide Area Work Flow (WAWF) to Portsmouth Naval Shipyard prior to shipment, using designated codes N50286 for ship-to, N39040 for inspect and accept, and email notification to PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL. No material may be shipped without prior acceptance. All certifications must include a signed statement of full compliance without disclaimers
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
VALVE, NEEDLE
Solicitation # N0010426QFG30
This contract pertains to the procurement of a needle valve designated as special emphasis material (Level I/SUBSAFE) for use in a critical shipboard system, where failure could lead to catastrophic consequences including loss of life or the vessel itself. The item must strictly conform to Naval Ship System Command drawing 7067139 and associated specifications, including ASTM-B150 Alloy UNS C63200 in Temper TQ50 or TQ55, with mandatory quantitative chemical and mechanical analysis and full traceability from raw material through final assembly. All materials require permanent, legible traceability markings tied directly to certified test reports, and any processing altering material properties necessitates re-certification with updated documentation. Welding and brazing operations must adhere to S9074-AQ-GIB-010/248 or 0900-LP-001-7000 standards, with all procedures and personnel qualifications submitted for prior Navy approval, and a certificate of compliance is required for every weld filler metal lot. Thread inspection must follow FED-STD-H28 System 21 unless otherwise prescribed, and O-ring sealing surfaces must be inspected using the General Acceptance Criteria (GAC) unless specific drawing criteria override it. The contractor must maintain an ISO-9001 quality system with ISO-10012 and ISO/IEC 17025 calibration compliance, subject to government oversight and audit at the source. All certification data, including non-destructive testing and material analyses, must be submitted electronically via ECDS at least 20 days prior to delivery and reviewed and accepted by Portsmouth Naval Shipyard before shipment, with final delivery due within 365 days of contract effectiveness. The contract is a DO-rated national defense priority order issued under Emergency Acquisition Flexibilities and is a total small business set-aside with mandatory compliance with Buy American provisions and prohibition of mercury contamination. Subcontractors are subject to stringent oversight, including requirement for similar quality controls and traceability, and all documentation must be submitted in electronic format using Adobe PDF. Any deviations or waivers require formal review and approval by the Contracting Officer and must be classified as critical, major, or minor based on safety and performance impact. Final inspection requires 100% verification of traceability, certification completeness, and material conformity, with lot acceptance based on zero defects.
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in 24 days
View Details
NAICS: 332919
New
Federal
48--VALVE, CONTROL
Solicitation # N0010426RBT44
This contract is a firm fixed-price solicitation issued by the Naval Supply Systems Command Weapon Systems Support (NAVSUP WSS-MECH) under solicitation number N0010426RBT44 for the procurement of a control valve, with a closing date of July 30, 2026. The contract mandates strict compliance with a comprehensive suite of military and technical specifications, including First Article Testing requirements for the valve body casting (BPR300-625 Item 16), which must be conducted on one unit and submitted for government approval prior to any manufacturing. All technical documentation such as drawings, Individual Repair Part Ordering Data (IRPOD), and Standard Technical Requirements (STRs) must be sourced exclusively from the secured BPMI e-Commerce website, requiring pre-registration and password access; no hard copies will be mailed. The contractor is required to maintain a government-acceptable inspection system and retain complete records of all inspection activities throughout performance and beyond. Packaging must adhere to MIL-PRF-23199 and related cleanliness control standards, excluding fire-retardant materials, and mercury or mercury-containing compounds are strictly prohibited from contact with the hardware. The contract enforces a strict order of precedence among documents, with contract amendments and schedules superseding all others, and requires full implementation of cited document revisions without partial use unless formally approved. Contractor waiver or deviation requests must include full justification, technical data supporting the alternate item, and must be reviewed by the Government Quality Assurance Representative before submission to the post-award contracting officer. Data deliverables must follow the DD Form 1423 format, with specific submission timelines such as 45 days after contract award for procedure packages and at end-of-contract for test and inspection reports, each tied to unique DI-QCIC sequence numbers and submitted in separate packages per unique contract item. Pricing is valid for 90 days post-closing, and submissions must be complete, signed, and received by the deadline; no exceptions are permitted. The solicitation further requires compliance with cybersecurity maturity model certification, equity provisions for veterans and workers with disabilities, small business representation, limitation of liability for high-value items, and adherence to security prohibitions and transportation protocols. All contractual documents are deemed issued upon electronic transmission, and the Point of Contact is Adele Lamb, with all communications required to be directed through official Navy channels.
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in 7 days
View Details
NAICS: 332919
New
Federal
VALVE,CHECK
Solicitation # SPRMM126QKG80
This contract is issued under solicitation SPRMM126QKG80 by the Department of Defense through DLA Mechanicsburg for the procurement of a CHECK VALVE with the CAGE code 54497 and reference number 1213C2817. The contract mandates strict adherence to military and industry quality standards including MIL-STD-130 Rev N for marking, IPC J-STD-001 Class 3 for soldering, and MIL-STD-2073 for packaging. Inspection and acceptance of the material must occur at the source as defined by DLA Procurement Note E06, with final acceptance of packaging also to be conducted at a designated location to be specified. All deliveries require electronic submission of invoices and receiving reports via PIEE-WAWF, and contractors must be registered in the Procurement Integrated Enterprise Environment and comply with mandatory use of Workflow Pro. Compliance with higher-level quality requirements is enforced through ISO 9001, and the evaluation for award is strictly based on Lowest Price Technically Acceptable criteria. The contractor must be an authorized distributor of the original equipment manufacturer, subject to providing documentation on company letterhead signed by an authorized official. Any change to design, material, part number, or production facility requires prior written approval from the Contracting Officer, with specific codes indicating the nature of the change and a mandatory $250 administrative cost reduction for facility changes. Records of all inspections must be maintained for 365 days after final delivery, and non-compliant or defective materials are not acceptable even under sampling protocols. Technical documentation and specifications referenced in the contract must be obtained from authorized sources, with additional controls on distribution and access due to official use and NOFORN designations. The solicitation response deadline is August 31, 2026, and communication must be routed through the designated point of contact. Contractors are also encouraged to register with NAVSUP WSS to receive automated notifications regarding contract issuance and updates.
SPRMM1 DLA Mechanicsburg

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
ACTUATOR,ELECTRO-ME
Solicitation # N0010426QYADZ
This contract pertains to the repair of the ACTUATOR,ELECTRO-ME under solicitation N0010426QYADZ, with a response deadline of August 31, 2026. All repairs must adhere strictly to the contractor’s internal standards and approved technical documentation, including manufacturer drawings and military specifications, and must comply with MIL-STD-130 Rev N for item marking. The repair turnaround time is measured from the physical receipt of the F-condition asset at the contractor’s facility, as recorded in the Commercial Asset Visibility system, and completion must occur within the specified timeframe with final government inspection and acceptance. The contract requires full compliance with the Buy American Act and related certification provisions, Mercury Free standards prohibiting contamination from metallic mercury or mercury compounds during manufacturing or testing, and mandatory cybersecurity maturity model certification. All submissions must include unit price, total price, repair turnaround time, and an informal cost breakdown if applicable. The contractor must be an authorized distributor of the original manufacturer and provide proof of authorization with the response, and all work must be performed at a facility with a documented CAGE code. Inspection and acceptance are the contractor’s responsibility, though the government reserves full rights to conduct audits and inspections. Records of all quality assurance activities must be maintained for 365 days post-delivery. Freight is FOB Origin, and the award will be bilateral, requiring written contractor acceptance. Government Source Inspection is mandatory, and any design, material, or part number changes require prior written approval from the NAVICP-MECH Contracting Officer using specified code designations. Packaging must meet MIL-STD-2073 requirements, and all subcontractors are bound by identical mercury and quality compliance obligations. The contract is governed by the terms of Basic Ordering Agreement N0010424GZ901, and all referenced documents must be obtained from designated government sources.
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
REPAIR MODULE,STRAI
Solicitation # SPRMM126QMH22
This solicitation seeks the manufacture and delivery of the REPAIR MODULE,STRAI under a fixed-price contract issued by the Defense Logistics Agency (DLA) Mechanicsburg, with the solicitation number SPRMM126QMH22. The requirement mandates strict adherence to military standards including MIL-STD-130 REV N for marking and MIL-STD-2073 for packaging, with all work performed at the approved production facility unless a formal, cost-justified change is approved in writing by the Contracting Officer. The contract incorporates mandatory inspection protocols at source, requiring the contractor to manage and document all quality assurance activities, maintain inspection records for 365 days post-delivery, and ensure full compliance with specifications even when explicit inspection clauses are absent. Submission of quotes must be electronic via EDI, with any deviations clearly stated; failure to do so will result in award based solely on solicitation terms. Contractors must disclose their status as OEMs or authorized distributors, providing CAGE codes and part numbers, and must register for the PIEE-WAWF system to electronically submit invoices and receiving reports post-award. The contract operates under the Lowest Price Technically Acceptable (LPTA) evaluation method and requires full compliance with security and export control regulations, including handling of NOFORN and Official Use Only documents through designated DLA channels. All technical data and drawings must be safeguarded according to designated distribution statement codes, and contractors are subject to prohibitions against unauthorized production facility changes, substitutions, or alterations without prior written approval and a $250 administrative cost reduction. The offer must be submitted by August 14, 2026, and is governed by mandatory clauses such as the Warranty of Title, Inspection of Supplies, and Mandatory Use of Wide Area Workflow, along with current government-wide policy deviations on representations and security exclusions. Vendors are strongly encouraged to register with NAVSUP Weapon System Support for automated notifications via NECO and the PIEE Electronic Data Access tool to track contract issuance and modifications. All contractual documents are deemed issued upon electronic transmittal, and failure to provide contact information or proof of authorized distribution will disqualify the offer.
SPRMM1 DLA Mechanicsburg

POSTED

about 19 hours ago

DEADLINE

in 14 days
View Details
NAICS: 332919
New
Federal
PARTS KIT,BALL VALV
Solicitation # N0010426QZB63
This contract covers the supply of a specialized ball valve parts kit designated as SPECIAL EMPHASIS material (Level I), critical to shipboard systems where failure could result in catastrophic consequences including loss of life or vessel. The kit includes a spherical ball and two mating seats manufactured to exacting standards outlined in specific NAVSEA drawings and referenced technical documents such as SAE AMS 6931, ASTM B367, MIL-STD-792, MIL-STD-2035, and ISO standards. The ball must be fabricated from centrifugally cast 6AL-4V titanium or equivalent, with strict chemical and mechanical specifications, while the seats are to be made from Delrin with precisely defined physical properties including specific gravity, tensile strength, wear resistance, and Teflon fiber content. The ball’s surface finish must meet rigorous roughness and waviness tolerances, with a final polish requiring proprietary Supfina paste and wool pad techniques to achieve a matte finish between RHR 12 and 16. All components require stringent traceability from raw material through final assembly, with unique heat/lot/batch markings permanently applied or tagged as per MIL-STD-792, ensuring full correlation to certified test data. The contract mandates comprehensive quality assurance protocols including ISO-9001 with ISO-10012 or ANSI Z540.3 calibration standards, or MIL-I-45208 with MIL-STD-45662 as an alternate. All welding and brazing procedures must be pre-approved under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, with full documentation of procedures, qualifications, and filler metal certifications submitted electronically. Each ball must undergo hydrostatic testing at 1050 PSI for 30 minutes or an approved dye penetrant inspection, while non-destructive testing and material certifications must be 100% verified and traceable. The contractor must submit formal Certificates of Compliance for each shipment, fully identifying traceability numbers, test results, and confirming compliance with all specifications. All certification data must be submitted via WAWF to Portsmouth Naval Shipyard prior to shipment, with “Inspect by” and “Accept by” codes designated and email notifications sent. Quality control extends to sub-tier suppliers, requiring the prime contractor to audit and ensure compliance with all requirements. Material handling, storage, and packaging must
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
VALVE,LINEAR,DIRECT
Solicitation # N0010426QYADY
This contract solicitation, identified by N0010426QYADY, seeks qualified contractors to repair the VALVE, LINEAR, DIRECT under a fixed-price arrangement, with performance governed by the terms of the Basic Ordering Agreement N0010424GZ901. All repairs must comply with MIL-STD-130 Rev N for marking and adhere to the manufacturer’s technical specifications and approved repair procedures, using the designated CAGE code 78062 and reference number 20193-008. The contractor is responsible for all inspection, testing, and quality assurance activities, including maintaining detailed records for 365 days after final delivery, and must ensure the final product meets all functional and operational requirements without unauthorized substitutions or design changes, which require formal written approval. Any modifications must be clearly identified by one of six defined code classifications, and no mercury or mercury-containing compounds may be introduced during the repair process. The Government retains the right to conduct inspections at any point, and rejection will occur for noncompliance with any requirement. Delivery is FOB Origin, and the repair turnaround time is measured from the physical receipt of the as-found asset at the contractor’s facility as logged in the Commercial Asset Visibility system, with the contractor required to report all transactions within five business days. The response must include a detailed quote with unit and total pricing, repair turnaround time in days, and an informal cost breakdown if applicable. A valid Return Material Authorization number must be provided if used, and the awardee's CAGE code along with inspection and shipping facility details must be clearly stated. The contract mandates compliance with Buy American provisions and other federal requirements, including cybersecurity maturity model certification, small business subcontracting, and security prohibitions. Only authorized distributors of the original manufacturer may respond, and proof of authorization must be submitted on official company letterhead. All documentation provided by the Navy carries distribution restrictions, and any request for controlled documents must follow specific Navy channels. The deadline for submission is August 31, 2026, and the winning contract will require bilateral acceptance before execution.
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
PARTS KIT,SOLENOID
Solicitation # SPRMM126QKG59
This contract pertains to the procurement of the PARTS KIT, SOLENOID under solicitation SPRMM126QKG59, issued by the Defense Logistics Agency (DLA) Mechanicsburg under emergency acquisition authority. The requirement specifies strict adherence to military standards including MIL-STD-130 Rev N for part marking, with production restricted to the designated CAGE code 04845 and reference number 226590. The contractor must ensure the parts are free from metallic mercury and any mercury contamination, and any proposed use of mercury requires prior written approval with detailed documentation and warning labels. All materials must be new, with refurbished items explicitly prohibited, and distributors must prove authorization from the original equipment manufacturer with documentation signed by an official. The contract mandates compliance with traceability requirements, electronic submission of invoices and receiving reports via WAWF, and registration with PIEE’s EDA portal for order visibility. Inspection and acceptance are to occur at source, with the contractor bearing full responsibility for quality assurance, recordkeeping for 365 days post-delivery, and compliance with all referenced specifications without exception unless approved in writing. Changes to design, material, or part number are tightly controlled, requiring coded notifications and formal approval from the Contracting Officer before implementation. The evaluation for award will follow the Lowest Price Technically Acceptable (LPTA) method, emphasizing compliance over cost reduction. Technical data and drawings are not provided, placing full responsibility on the offeror to interpret and meet stated requirements. The contract incorporates mandatory cybersecurity requirements under CMMC Level 1 self-assessment, along with federal supply chain security prohibitions and security exclusions effective through 2026. All contractual documents are deemed issued upon electronic transmission, and communications must be directed to the designated point of contact. Vendors are strongly encouraged to register with NAVSUP WSS to receive automated notifications regarding contract issuance and updates via NECO and PIEE. Packaging must comply with MIL-STD-2073, and any change to production facility locations requires formal approval with a $250 administrative fee and confirmation that labor surplus or small business commitments remain unchanged. Failure to comply with any requirement, including mercury restrictions, traceability, or electronic documentation, may lead to rejection of the proposal or contract non-acceptance.
SPRMM1 DLA Mechanicsburg

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
VALVE FIRING ASSY
Solicitation # N0010426QFG31
This contract pertains to the refurbishment and repair of a Valve Firing Assembly under a Level I Special Emphasis qualification, meaning the component is critical to shipboard systems where failure could result in catastrophic consequences including loss of life or vessel. The work must be performed to a firm fixed price, encompassing complete teardown, inspection, and restoration to “like new” or “A” condition, with separate pricing required for beyond repair or beyond economic repair scenarios. All materials and processes must strictly comply with referenced naval specifications including MIL-DTL-1222, MIL-C-24707, ASTM standards, and S9074-series welding and brazing procedures. Traceability is mandatory from raw material through final assembly, requiring permanent marking of every component with unique heat/lot identifiers linked to certified test reports detailing chemical composition, mechanical properties, and non-destructive testing results. Certifications, radiography, liquid penetrant, hydrostatic testing, and wedge tensile testing are specifically mandated for key components such as valve bodies, caps, and screws, with all test data submitted as part of the Objective Quality Evidence package. The contractor must operate under a certified ISO-9001 or MIL-I-45208 quality system, subject to government audit, and must ensure all subcontractors adhere to identical traceability and certification controls. Delivery is tied to a strict schedule requiring submission of certification data no later than 20 days before delivery, with final delivery due within 218 days of contract effective date. The order is designated as a DO-rated priority under the Defense Priorities and Allocations System, utilizing Commercial Asset Visibility, and issued under Emergency Acquisition Flexibilities. All submissions must be processed through ECDS and WAWF systems, and strict prohibition exists against molybdenum disulfide lubricants, mercury-containing materials, and unauthorized modifications. Final acceptance requires full compliance with 100% inspection of traceability, certifications, and NDT records under zero-defect lot acceptance criteria.
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in 24 days
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 336612
New
Federal
CONNECTOR,THRU-HULL
Solicitation # N0010426QFG24
This contract pertains to the procurement of a thru-hull connector assembly designated as special emphasis material (Level I) for use in critical shipboard systems, where failure could result in severe consequences including loss of life or vessel. The item must strictly comply with specification CPG 1025 and associated drawings, with rigorous controls over material composition, welding, inspection, and traceability. All certified components—such as the penetrator body, cover, nut, and washers—must meet QQ-N-286 or QQ-N-281 specifications with mandatory chemical and mechanical testing, and each unit must be traceable via unique markings tied to certification data. First article testing is required, with one unit to be delivered to Portsmouth Naval Shipyard for government evaluation, and no production welding may proceed without prior approval of qualified procedures and qualification records. Material must be sourced, processed, and handled under a documented quality system conforming to ISO-9001, ISO-10012, or MIL-I-45208, with all nonconformances, waivers, and deviations requiring explicit written approval from the Contracting Officer. Certification documentation, including test reports and weld records, must be submitted electronically via WAWF with specific routing to N50286, N39040, and PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL, and no material may be shipped until formal acceptance is granted. The contract mandates complete traceability from raw material through final assembly, with electronic signatures accepted for certifications, stringent prohibitions against molybdenum disulfide lubricants, and a ban on mercury-containing materials. All subcontractors must be vetted, audited, and bound by the same stringent quality and documentation standards as the prime contractor. The contract was issued under Emergency Acquisition Flexibilities and carries a DO priority rating under the Defense Priorities and Allocations System, with final delivery required within 365 days of contract effective date, and all certification submissions due no later than 20 days before scheduled delivery.
Boat Building

POSTED

about 19 hours ago

DEADLINE

in 24 days
View Details
NAICS: 336612
New
Federal
BOX ASSEMBLY,OIL DI
Solicitation # N0010426QTB89
This contract pertains to the repair of the BOX ASSEMBLY, OIL DI under a fixed-price arrangement with a required Repair Turnaround Time of 650 days, subject to penalties for delays not caused by the Government, with pricing reductions applied per unit per month until a specified maximum is reached. All repairs must adhere to MIL-STD-130 marking requirements and be certified by the American Bureau of Shipping, with original signed certificates delivered alongside each item and electronic reports submitted in PDF format to the MSC in Norfolk. The contractor must operate under a validated quality assurance system, maintain complete inspection records for 365 days post-delivery, and comply with all technical directives, drawings, and approved repair standards. No substitutions or design changes are permitted without prior written approval from the NAVICP-MECH Contracting Officer, classified under specific Code designations for part changes. The contract is issued under Emergency Acquisition Flexibilities, encouraging accelerated delivery, with all freight FOB Origin and handled by the Navy per the Commercial Asset Visibility Statement of Work. The contractor must report all asset transactions in CAV within five business days of physical receipt, reflecting actual dates in the system. The offer must include unit and total pricing, test-and-evaluation fees for beyond-repair assets, and comparative new unit pricing and delivery timelines. The Government reserves the right to exercise an option to increase quantities at the original unit price. The contractor must be an authorized distributor of the original manufacturer, and all documentation provided by the Navy carries distribution restrictions outlined in OPNAVINST 5510.1. Compliance with Buy American provisions, cybersecurity maturity model requirements, small business subcontracting goals, veteran and disabled worker equity, and the mandatory use of Workflow Pro Assist Module are all binding conditions. The solicitation number is N0010426QTB89 with a response deadline of August 31, 2026, and the primary point of contact is Alison E. Harper at the Mechanicsburg, PA office.
Boat Building

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332722
New
Federal
SCREW,CAP,HEXAGON H
Solicitation # N0010426QEC21
The contract pertains to the procurement of a hexagon cap screw under solicitation N0010426QEC21, issued by NAVSUP Weapon Systems Support Mech, with a response deadline of August 31, 2026. It incorporates a comprehensive set of technical, quality, and administrative requirements governed by a hierarchy of documents led by the Individual Repair Part Ordering Data (IRPOD), followed by the contract schedule, terms and conditions, and referenced military specifications. The contractor must comply strictly with specified revisions of drawings, standards, and technical data obtained through the secure logistics website, and any deviation from requirements requires prior written approval from the Contracting Officer with full technical justification, including evaluations demonstrating no adverse impact on form, fit, or function. Quality assurance is dictated by the IRPOD, requiring the contractor to maintain inspection records accessible to the government throughout and beyond contract performance. Packaging must adhere to MIL-PRF-23199 and related cleanliness standards, with mandatory use of heat-sealed envelopes for parts subject to cleaning controls, and the prohibition of mercury or mercury-containing compounds in any component. All shipments require government authorization prior to dispatch, and delivery documentation including certified test and inspection reports must be submitted in separate packages for each unique contract line item. The contract mandates submission of pre-manufacturing procedure packages within 45 days of award and final inspection reports by the end of contract performance, using specific DD Form 1423 sequences and following exact formatting and distribution guidelines. The contract enforces strict cybersecurity, small business set-aside, and national defense prioritization compliance, with additional requirements for Workflow Pro (WFP) Mod Assist module usage and electronic invoice submission via Wide Area Workflow. Transportation is governed by sea freight protocols, and all contractual documents are deemed issued upon electronic transmission, with bid validity periods to be specified by the offeror. The place of performance is not explicitly defined, but all technical documentation must be sourced through official channels, and distribution of sensitive material is restricted per DoD distribution statement codes. The contractor must provide item identification and valuation data as specified, with pricing structured according to data groups defined in the DD Form 1423, and all technical submissions must align with the latest revisions of cited documents. No charge may be applied where data is commercially developed and requires minimal adaptation. The contract explicitly prioritizes compliance with delivery schedules and technical standards for critical repair parts, and non-conforming submissions without proper justification will be returned without review.
Bolt, Nut, Screw, Rivet, and Washer Manufacturing

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 333998
New
Federal
70--DISPLAY,LIQUID CRYS, IN REPAIR/MODIFICATION OF
Solicitation # N0010426QLC23
This contract pertains to the repair and modification of a liquid crystal display component under a firm-fixed-price structure, issued through an urgent procurement action leveraging Emergency Acquisition Flexibilities. The work is governed by strict compliance with technical standards, including MIL-STD-130 for marking, adherence to the manufacturer’s original specifications, and mandatory use of the Commercial Asset Visibility (CAV) system to track asset receipt, repair progress, and delivery timelines. The contractor must meet a defined Repair Turnaround Time (RTAT), with penalties applied per unit per month for delays, and all repairs must be inspected and accepted by the Defense Contract Management Agency before shipment. Payment is contingent upon successful Government inspection and CAV reporting, and all transportation is managed by the Navy through CAV or Proxy CAV channels. The contract requires full documentation of repair processes, records retention for 365 days post-delivery, and strict configuration control for any design or part substitutions, which require prior written approval. The contractor must be an authorized distributor of the original manufacturer, with proof provided during bidding, and must comply with Buy American provisions, cybersecurity maturity level requirements, and small business subcontracting obligations. Any asset determined beyond repair (BR) triggers a negotiated fee not to exceed a specified amount, contingent on DCMA Quality Assurance verification and proper disposition procedures per DFARS. The repair must be performed at the contractor’s facility, with final acceptance tied to CAV system timestamps and physical receipt. All communications and modifications must go through the designated Procurement Contracting Officer, with DCMA acting as the administrative oversight body. The solicitation enforces zero-cost acceleration of delivery, mandates CAV reporting, and requires detailed pricing, RTAT, and new unit cost comparisons in the response. The contract is issued under a Basic Ordering Agreement framework, with BOA terms prevailing in case of conflict. The contract data identifies the issuing agency as NAVSUP Weapon Systems Support in Mechanicsburg, PA, with a response deadline of August 31, 2026.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334412
New
Federal
CARD CAGE ASSY
Solicitation # N0010426QTB86
The solicitation seeks repair services for the CARD CAGE ASSY under a firm-fixed-price contract with a required Repair Turnaround Time of 229 days, though accelerated delivery is encouraged. The Government requires full compliance with MIL-STD-129 for marking and MIL-STD-2073 for packaging, and mandates strict adherence to approved technical procedures, drawings, and manufacturer directives. All repair work must meet operational and functional specifications tied to the CAGE code 04804 and reference number 6D29167G01. Any design, material, or part number changes require written approval and classification under specific Code designations, with Code 1 exceptions permitted for identical part substitutions. Mercury contamination is strictly prohibited; the contractor must ensure no metallic mercury or mercury compounds are used in manufacturing or testing, and any intentional use requires prior written approval, detailed justification, and inclusion of a warning plate. The contractor is responsible for all inspection and testing in accordance with original manufacturer specifications and must maintain complete records for 365 days after final delivery. Government Source Inspection is mandatory, and all freight is FOB Origin, with the Navy handling logistics. The contract includes a mandatory option to increase quantities at the original unit price, exercisable by the Contracting Officer within FAR-specified timeframes. Compliance with Buy American, small business subcontracting, cybersecurity maturity certification, and the mandatory use of Workflow Pro (WFP) Mod Assist Module are required. The contractor must submit a quote detailing unit and total price, RTAT, and comparison to new unit price and lead time. Non-compliance with the required RTAT must be explicitly explained. The awardee must provide CAGE codes for the facility performing the repair and for inspection, with the Government retaining rights to audit quality records and inspect work. The contractor must also ensure subcontractors adhere to all terms, including mercury safety and inspection obligations. All documentation and compliance must be submitted via the designated Navy point of contact, Rebecca A. Rainey, and the contract is governed by a range of applicable Department of Defense directives, deviation notices, and procedural standards issued through 2026.
Bare Printed Circuit Board Manufacturing

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335312
New
Federal
61--MOTOR,ALTERNATING C, IN REPAIR/MODIFICATION OF
Solicitation # N0010426QLC22
This contract pertains to the repair and modification of the MOTOR, ALTERNATING C, issued under Emergency Acquisition Flexibilities with a firm-fixed-price structure. The procurement is conducted through a Basic Ordering Agreement (BOA), incorporating its terms unless superseded by this order. The contractor must adhere to strict repair turnaround time (RTAT) requirements, with performance measured from physical receipt of the asset at their facility, as recorded in the Commercial Asset Visibility (CAV) system. Failure to meet the RTAT results in a monthly price reduction per unit and may trigger termination for default. Government Source Inspection (GSI) by DCMA is mandatory before shipment, and payment is contingent upon proper inspection and CAV reporting. All transportation is handled by the Navy, and contractors must coordinate pick-up via ATAC. The item must be repaired in compliance with manufacturer specifications, MIL-STD-130 marking standards, and approved technical documentation, with no substitutions allowed without prior written approval. Any asset deemed beyond repair requires formal documentation and triggers a negotiated non-to-exceed fee for evaluation costs. The contract requires full compliance with Buy American provisions, cybersecurity maturity certification, small business subcontracting, and other federal acquisition flow-down clauses. Contractors must submit a detailed quote including unit price, total price, and RTAT, along with a comparison to the cost and lead time of purchasing a new unit. Records of all inspections and repairs must be maintained for at least one year post-delivery, and all documentation must account for distribution restrictions, especially those involving NOFORN or export-controlled data. The awardee’s CAGE code and performance location must be accurately provided, with inspection and acceptance occurring at the designated facility. The Contracting Officer retains authority to definitize estimated prices through modification, and all modifications must be issued only by authorized entities with proper notification to all parties. Failure to respond within 30 days of contract issuance requires immediate contact with the designated point of contact. Contractors must be authorized distributors of the original manufacturer and provide proof of authorization. The solicitation remains open through August 31, 2026, with delivery and performance obligations tied directly to timely, compliant execution under Navy-specific logistics and quality protocols.
Motor and Generator Manufacturing

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 333998
New
Federal
WASHER,SPHERICAL SE
Solicitation # N0010426QAC92
This contract pertains to the manufacture of a WASHER, SPHERICAL SE with part number CL-7-SW and CAGE code 99862, issued under solicitation N0010426QAC92 by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania. The offer deadline is August 17, 2026, and the contract is set aside for small business participation, with full compliance required under applicable small business programs and cybersecurity maturity certification standards effective November 2025. Delivery must be completed within 90 days, and the item must adhere to strict military standards including MIL-STD-130 for marking, MIL-STD-973 for configuration control, and MIL-STD-2073 for packaging. Government source inspection per FAR 52.246-2 is mandatory, and the contractor bears full responsibility for ensuring quality and compliance, even in the absence of specific inspection clauses. Records of all inspection activities must be retained for 365 days after final delivery. The contract prohibits substitution of the specified item unless prior testing and formal approval are obtained from NAVICP-MECH, as it is governed by a Source Control Drawing that only authorizes the listed vendor. Proposals for alternate items require full technical documentation for government review. All contractual documents are deemed issued upon electronic transmission, and payments will be processed through the Wide Area Workflow system with inspection and acceptance occurring at the source. The contractor must also comply with national defense priority ratings, security prohibitions, and cybersecurity requirements, and must submit any engineering changes, deviations, or waivers in strict accordance with MIL-STD-973. Commercial brand name specifications apply, and any proposed substitute must meet all performance and technical criteria without exception.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 19 hours ago

DEADLINE

in 17 days
View Details
NAICS: 335311
New
Federal
CABLE ASSY,MAI
Solicitation # N0010426QXB46
This contract solicitation, identified as N0010426QXB46, is for the procurement of a CABLE ASSY,MAI under a Firm-Fixed Price arrangement, with all quotations required to be submitted electronically to russell.w.kreider.civ@us.navy.mil by the deadline of August 14, 2026. The award is contingent upon the vendor being an authorized distributor of the original equipment manufacturer, requiring official documentation confirming authorization, and strict adherence to Item Unique Identification (IUID) requirements per DFARS 252.211-7003 and MIL-STD-130 Rev N for physical marking. The contract specifies FOB Origin delivery, mandatory compliance with MIL-STD-2073 packaging standards, and Government Source Inspection, with all supplies subject to inspection and acceptance in accordance with the terms outlined. The contractor must provide a detailed cost breakdown including unit price, total price, lead time, CAGE codes for award and inspection, and a quotation expiration date valid for at least 90 days, and must not make any design, material, or part number changes without prior written approval from the contracting officer, using designated change codes to categorize modifications. The contract imposes comprehensive quality assurance obligations, requiring the contractor to maintain complete and accessible inspection records for 365 days after final delivery and to ensure full compliance with all technical specifications without reliance on sampling to justify defective material submission. Alterations to the part must be flagged using specific design change codes ranging from simple part number updates to non-interchangeable redesigns, with supporting drawings and explanations required for evaluation. All referenced documents must be obtained through authorized DoD sources, with special procedures outlined for restricted documents such as NOFORN or classified materials, which require formal request processes. The solicitation emphasizes that only authorized distributors will be considered for award, and failure to submit proof of authorization disqualifies the offer. The contracting office is located in Mechanicsburg, Pennsylvania, under the Naval Supply Systems Command Weapon Systems Support, with all communications and submissions directed to the designated point of contact.
Power, Distribution, and Specialty Transformer Manufacturing

POSTED

about 19 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMB
Solicitation # N0010426QYAE5
This contract pertains to the manufacture and delivery of a CIRCUIT CARD ASSEMBLY under emergency acquisition flexibilities, with immediate bilateral execution upon contractor acceptance. The item must conform to stringent military standards including MIL-STD-973 for configuration control, MIL-STD-130 for item marking, and ANSI/ESD S20.20 for electrostatic discharge protection. All components must be mercury-free and free from contamination, with explicit prohibitions on mercury use unless prior written approval is obtained through detailed documentation. The contractor is responsible for ensuring quality through an inspection system compliant with MIL-I-45208 and must maintain complete inspection records for four years after final delivery. Configuration changes require explicit Government approval, and only approved drawing revisions may be used, with notification required for any prior authorizations carried over from previous contracts. The item must be produced under a DPAS-rated order and delivered with proper packaging per MIL-STD-2073. The contractor must be the Original Equipment Manufacturer or provide a signed letter of authorization from the OEM if acting as a distributor. All materials must be labeled with the specified CAGE code 96169 and reference number 263501706-001CE. Shipping and receiving must follow Wide Area Workflow payment instructions and require a standalone receiving report. Warranty is one year from delivery date. Compliance with security prohibitions, annual certifications, and mandatory use of Workflow Pro’s Assist Module is required. The contract is administered by NAVICP-MECH in Mechanicsburg, PA, with sole point of contact at the provided Navy email address. Solicitation responses are due by September 9, 2026, under NAICS code 334412, and all contractual documents are deemed issued upon electronic transmission.
Bare Printed Circuit Board Manufacturing

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334290
New
Federal
TRANSMITTER,INFRARE
Solicitation # N0010426QXB63
This contract pertains to the procurement of the TRANSMITTER, INFRARED for the 5"/54-Caliber Gun Mount MK45, with requirements strictly defined by multiple drawings, primarily drawing 5181698 and associated technical documentation. The supplier must comply with comprehensive quality and manufacturing standards, including ISO 9001, MIL-STD-130 for marking, MIL-STD-973 for configuration control with specific tailoring, and adherence to numerous military and industry specifications such as MIL-STD-202, MIL-STD-883, MIL-PRF-39003, and others. The item must be sourced from a Government Qualified Products List (QPL) supplier, and 100% production testing is mandatory, with results subject to approval by the DCMC-QAR before shipment. All deliverables must be shipped FOB Origin, packaged per MIL-STD-2073, and accompanied by approved test procedures and reports. The solicitation mandates a Firm-Fixed Price quotation with minimum 90-day expiration, requiring detailed cost breakdowns, lead times, CAGE codes, and proof of authorized distributor status if not the manufacturer, confirmed via official OEM correspondence. Electronic submissions must be sent to stephanie.r.perez7.civ@us.navy.mil, and the evaluation will prioritize price, past performance, and supplier risk under DFARS 252.204-7024. All offerors must comply with Buy American provisions, Small Business Subcontracting Plan mandates, Security Prohibitions, and mandatory use of Workflow Pro (WFP) Assist Module. The Government retains inspection rights, requires records retention for 365 days after delivery, and enforces strict configuration control with prior authorization for any engineering changes. Only authorized distributors may be considered, and all technical inquiries must follow prescribed submission formats and channels. The response deadline is July 24, 2026, and award is contingent on bilateral acceptance.
Other Communications Equipment Manufacturing

POSTED

about 19 hours ago

DEADLINE

in 21 days
View Details