Van Buren Blvd. Resurfacing Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Van Buren Blvd. Resurfacing Project, identified by Work Order D10060C and Task Code Z1530, is a transportation improvement initiative managed by the County of Riverside Transportation Department. The project focuses on resurfacing approximately one mile of Van Buren Blvd. in the Woodcrest Community, specifically between Capella Street and Washington Street. The scope of work involves cold planing existing asphalt to a depth of 0.30 feet and paving 0.40 feet of Hot Mix Asphalt. Extensive infrastructure improvements are included, such as the reconstruction of concrete curbs, gutters, ADA curb ramps, bus pads, and sidewalks totaling approximately 4,000 square feet. Additionally, the project entails upgrading traffic signals at King Ave to camera detection systems, adjusting utility covers, restriping the roadway, reconstructing drainage facilities, and performing necessary vegetation or tree removal. All improvements will remain within the existing roadway footprint, requiring no additional right-of-way. Environmental compliance is a critical component of the project, which has received a Notice of Exemption under the California Environmental Quality Act because it involves resurfacing existing facilities without expanding roadway use. The project must adhere to Best Management Practices outlined in the WRMSHCP. Furthermore, if any tree or vegetation removal occurs during the migratory bird breeding season between February 1 and August 31, a preconstruction nesting survey must be conducted to comply with the Migratory Bird Treaty Act. Project administration and environmental oversight are managed by Senior Transportation Planner Don Copeland and Environmental Project Manager Jan Bulinski. While specific contract values and award factors are not provided, the project is categorized under NAICS code 237310 for heavy and civil engineering construction.

General Info

Riverside County will resurface one mile of Van Buren Blvd with infrastructure improvements.

Agency

California → Riverside County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Van Buren Blvd Resurfacing Project Notice of Exemption WO D10060C

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts
Jan BulinskiEnvironmental Project Manager

Full Description

Show more
The County of Riverside Transportation Department (County) proposes to resurface a portion of Van Buren Blvd. between Capella Street and Washington Street, which is approximately 1 mile, in the Woodcrest Community in Riverside County. Van Buren Blvd is classified as an urban arterial highway in the County of Riverside's General Plan. Van Buren Blvd is currently between 63 and 88 feet wide with curb and gutter or asphalt concrete dike on both sides. The proposed project will include cold planing of the existing asphalt concrete to a depth of 0.30' and paving 0.40' of Hot Mix Asphalt (HMA). The proposed project will also include: • Reconstruction of concrete curb/gutter, cross gutter, spandrel, and ADA curb ramps • Reconstruction of Concrete Bus Pads with sidewalks • Utility Covers adjustments and relocations • Salvage/removal and installation of new signs • Restriping of roadway, including pavement markers and reflectors • Reconstruction of existing overside drainage facilities and catch basins • Reconstruction driveways • Upgrading existing traffic signals at King Ave to camera detection systems • Vegetation and/or tree removal • New sidewalk construction, about 4,000 square feet No additional right-of-way will be required to construct the proposed improvements. The project improvements will remain within the existing footprint of the roadway.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS