This Solicitation opportunity from Washington was posted on July 24, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Vancouver Waterfront Stone Repair

Closed
24 Quote 14State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The contract involves sourcing, furnishing, and installing a specific basalt stone measuring 4 inches by 23.5 inches to replace a missing piece at the Vancouver Waterfront Park's utility building. Additionally, the work includes removing and realigning an existing channel drain and installing a new 6 inch by 9 inch Unilock paver stone provided by the owner. The contractor is responsible for measuring and verifying the actual sizes of materials and making necessary modifications to ensure proper fit, all in accordance with the project site map and images. The project is located at 695 Waterfront Way in Vancouver, Washington, and must be completed within 30 working days from the Notice to Proceed. The engineer's estimate for the work is $1,500, and the solicitation was posted on July 24, 2024, with a response deadline of July 29, 2024. The project is managed by the City of Vancouver under NAICS code 237990, focusing on specialized construction services.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Vancouver
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Scope of Work - Work shall consist of sourcing, furnishing and installing 1 basalt stone (4 inches x 23.5 inches) that is missing from the utility building, removing and realigning channel drain and installing new owner-provided 6 inch x 9 inch Unilock paver stone. The contractor shall measure and confirm actual sizes and modify the stone or paver to fit. and other work, all in accordance with the attached project site map and images. Project site is at the Vancouver Waterfront Park, located at 695 Waterfront Way, Vancouver, WA 98660. Work shall be Physically Complete within 30 Working Days from the Notice to Proceed. Engineer's Estimate - $1,500

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS