Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Various Sign Replacements and Improvements by Marriott Marquis

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → San Diego Unified Port District

NAICS

238290 - Other Building Equipment ContractorsView NAICS

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

(1)

2025-106 Sign Change Marriott Marquis Notice of Exemption Filing

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Vanessa CabreraProject Manager
Kelly CunninghamPlanner I

Full Description

Show more
The proposed Project would include replacement of signage at various locations of the Marriott Marquis by Marriott Marquis Hotel (applicant) in the city of San Diego, California. Work to specifically complete the proposed Project would involve the fabrication and installation of one (1) high rise illuminated channel letter set sign mounted to a spider frame, three (3) sets of illuminated channel letters at ground level, flat cut-out lettering on ground-level monument sign faces, and installation of new ground sign cabinets. The high rise illuminated channel letter set sign is located at the top of the north-facing Marriott Marquis tower and would replace the existing illuminated channel letter set sign. The sign change would reflect improved branding for the Hotel and would be secured to structural mounting points by a spider frame. Work for this portion of the proposed Project would include dismantling and removing existing sign components, disconnecting and securing all electrical feeds, removal of current anchors and bracketing, installation of additional framing required to support the improved signage, and reconnecting the new signage to electrical service. The spider frame and channel letters would be delivered to the installation elevation by a crane and/or swing stage. Crane use to lift product to the roof would be limited to one (1) day and would be placed in the rear area of the property, away from pedestrian walkways and public access points. The swing stage would be utilized for the duration of the high-rise sign installation, and no walkways or pedestrian areas would be affected. A staging area as well as a pedestrian and vehicular safety zone would be established with barricades, delineations, rerouting, and signage. Construction of this component of the proposed Project is anticipated to take approximately three (3) weeks to complete. The proposed Project also consists of various ground-level sign improvements. These sign changes would reflect improved branding for the Hotel and would consist of illuminated and non-illuminated components. The illuminated wall/façade signage replacements, at various designated locations, would require disconnecting the current electrical feed, removing the existing cabinets, mounting systems, and lettering, repairing and patching anchor points as needed, and installing the new lettering. Electrical connection would be restored following installation. The non-illuminated signage improvements would consist of the replacement of flat cut-out lettering on ground-level monument sign faces, replacement and installation of ground sign cabinets, and necessary improvements to directional monument signage. Work would include cleaning the monument surfaces to secure optimal adhesion, preparation of foundations for new sign cabinets, securing fastening of new signage, anchoring ground sign cabinets to the prepared foundations, and reconnection to power. All the improved ground-level signage would be installed using hand tools and precision alignment equipment and would take approximately one (1) week to complete. All materials required for the proposed Project would be stored on the roof of the Hotel or within the Hotel leasehold in locations away from guests and public right-of-way. All equipment used during the proposed Project would be positioned away from public areas and delineated for safety by cones, taping, or barricades. Construction of the proposed project is anticipated to occur in late 2025. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the Applicant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

NAICS: 238290
New
International
Elevator Modernization and Preventative Maintenance Services for Multiple Sites
Solicitation # 25-248
The Metro Vancouver Housing Corporation has issued Request for Proposal 25-248 for elevator modernization and global preventative maintenance services across nine specific sites, including Ozada Village, Somerset Gardens, Strathearn Court, Alderwood Place, Guildford Glen, Evergreen Downs, Cedarwood Place, Kelly Court, and Le Chateau. The scope of work is divided into two primary components: elevator modernization, which includes electrical work and a subsequent four-year post-warranty maintenance term following a one-year warranty, and preventative maintenance services, which consist of a three-year initial term with two optional three-year extensions for a maximum of nine years. Proponents may bid on either service or both, with submissions required electronically via the Bidding System by 2:00 p.m. local time on October 20, 2026. The award will be based on the overall best value, utilizing both quantitative and qualitative tools. Proposals must meet a minimum technical threshold of 50 percent to proceed to the financial evaluation, which considers total cost, financial terms, product quality, and innovativeness. Selected providers must adhere to WorkSafeBC guidelines and various British Columbia and Canadian legislative requirements. Contract administration involves monthly itemized invoicing with a 30-day payment term. The Corporation maintains the right to award the contract in whole, in part by location, or in any combination of services to one or more proponents.
Metro Vancouver

POSTED

3 days ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS