Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Vasco Road Safety Improvement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Vasco Road Safety Improvement Project involves widening a 1.5-mile segment of Vasco Road between Brentwood and Livermore to install a median barrier while preserving existing travel lanes, along with associated upgrades to drainage systems, bridge expansions, wildlife crossings, and other roadway enhancements. The East Contra Costa County Habitat Conservancy serves as the lead CEQA responsible agency for the project and is obtaining take coverage under the ECCC Habitat Conservation Plan/Natural Community Conservation Plan to authorize incidental take of protected species resulting from construction activities. The project relies on the Initial Study/Mitigated Negative Declaration and Mitigation Monitoring and Reporting Plan previously prepared by the Contra Costa County Department of Conservation and Development, with no additional environmental review required from the Conservancy, who formally adopts the existing environmental documentation as its own for CEQA compliance. The project is linked to State Route 4 Bypass Authority under Project No. 0662-6R254/4255, CP#09-55, Phase 2, and is intended to enhance traffic safety and reduce collisions along this corridor. Environmental mitigation strategies are outlined in the approved Mitigation Monitoring and Reporting Plan, ensuring compliance with habitat conservation objectives. The Conservancy’s responsibilities include oversight of mitigation measures and environmental monitoring throughout project implementation. Point of contact for environmental and planning inquiries includes Claudia Gemberling of Environmental Services and Joanne Chiu, Principal Planner, with all project records accessible through the CEQAnet registry under SCH#2009062094, and the project’s anticipated posting date is June 26, 2026.

General Info

Widen Vasco Road, install median barrier, enhance drainage and wildlife crossings, comply with CEQA via existing environmental docs.

Agency

California → East Contra Costa County Habitat Conservancy

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Brentwood, CA, 92514

Set-Aside

NONE

Documents

(1)

NOD 2026 Vasco Road Safety Improvements Project Phase 2

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → East Contra Costa County Habitat Conservancy
Contacts2 people available
OfficeN/A
Organization / Agency
California → East Contra Costa County Habitat Conservancy
Office AddressN/A
Contacts
Joanne ChiuPrincipal Planner
Claudia GemberlingEnvironmental Services

Full Description

Show more
As a part of the Vasco Road Safety Improvements Project, Project No. 0662-6R254/4255, CP#09-55, Phase 2 (Project), State Route 4 Bypass Authority is seeking take coverage from the East Contra Costa County Habitat Conservancy (Conservancy) under the ECCC Habitat Conservation Plan/Natural Community Conservation Plan (HCP/NCCP) to widen a 1.5 mile stretch of Vasco Road roadway to install a median barrier while maintaining existing travel lanes, with associated drainage, bridge expansion, wildlife crossings, and roadway improvements between the cities of Brentwood and Livermore (see attached map). For purposes of the Project, the Conservancy is the CEQA responsible agency. Contra Costa County Department of Conservation and Development prepared an Initial Study/Mitigated Negative Declaration (IS/MND) and Mitigation Monitoring and Reporting Plan (MMRP) for the Project, the Vasco Road Safety Improvement Project SCH#2009062094 dated August 25, 2009 and an Addendum dated April 25, 2012. The Conservancy is a CEQA responsible agency for purposes of the Project and, as such, will rely on the approved IS/MND, the MMRP and environmental record prepared by Contra Costa County Department of Conservation and Development for purposes of fulfilling its responsibilities under CEQA.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract entails the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water supplies. The project requires integrated engineering solutions to meet regulatory standards for drinking water safety, with scope covering all phases from site preparation to system commissioning, ensuring seamless integration with existing infrastructure. All work must comply with industry best practices and performance benchmarks for PFAS mitigation. Interested parties must submit responses by September 3, 2026, under solicitation number lacsd-surface-water-pfas-removal-project-no-251-ca, with the project designated for Disadvantaged Business Enterprise participation under Department of Transportation guidelines. The North American Industry Classification System code is 237310, reflecting wastewater and sewage system construction. The contracting entity is Pyramid Building & Engineering, Inc., and inquiries should be directed to John Garrison at estimating@pyramidbuilding.net or 760-949-9005. Performance is limited to California locations, with no specified city or zip details provided for the worksite.
Pyramid Building & Engineering, Inc.

POSTED

about 3 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
Federal
FY26 Multiple Location BEQ Parking Lot Repairs
Solicitation # N4008526R9066
This solicitation, identified as N40085-26-R-9066, seeks proposals for FY26 Multiple Location BEQ Parking Lot Repairs at Marine Corps Base Camp Lejeune, North Carolina, with a response deadline of August 19, 2026. Only civil/paving contractors listed on the General Requirements cover page are eligible to submit, and the procurement is set aside exclusively for Historically Underutilized Business (HUBZone) concerns under FAR 19.13. The NAICS code 237310 applies, and the contracting office is NAVFAC Mid-Atlantic based in Norfolk, Virginia, with primary point of contact Jessica Huebner and secondary contact Lauren Loconto. Work includes construction, grading, paving, and related site improvements under a performance-based scope that demands strict adherence to technical specifications, quality control, and environmental compliance. All proposals must be submitted electronically via email to the designated addresses, accompanied by a complete submittal package on two labeled CD/DVDs, including PDFs of all technical documents, GIS deliverables, and submittal registers. The contract mandates the use of WAWF for invoicing, and all contractors must comply with hazardous material handling regulations under 40 CFR 261–263 and maintain proper labeling and documentation, particularly for ordnance scrap with MDAS certifications. Contractors are required to submit a detailed Construction Schedule within 15 days of award and an Equipment Delivery Schedule within 30 days of schedule approval. Key personnel, including the Superintendent, Project Manager, QC Manager, and Site Safety and Health Officer, must meet stringent qualifications including a minimum of 10 years of construction experience and five years as a superintendent on comparable projects, with fluency in English and familiarity with EM 385-1-1 safety standards. All personnel must undergo security vetting to access the electronic Construction Management System (eCMS), where only Unclassified or Controlled Unclassified Information may be uploaded—PII is strictly prohibited. Testing must be performed by NVLAP, AASHTO, or A2LA accredited laboratories, following ASTM standards for concrete, aggregates, and asphalt, with results clearly marked as conforming or non-conforming. The government retains full authority to inspect, audit, and reject work at any stage, and final acceptance rests solely with the Contracting Officer. Environmental compliance is enforced through specific Marine Corps Installations East forms for spill reporting,
Navfacsyscom Mid-Atlantic

POSTED

about 7 hours ago

DEADLINE

in 8 days
View Details