Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Vasco Road Safety Improvement

Forecast
2026-00224State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Vasco Road Safety Improvement Project involves widening a 1.5-mile segment of Vasco Road between Brentwood and Livermore to install a median barrier while preserving existing travel lanes, along with associated upgrades to drainage systems, bridge expansions, wildlife crossings, and other roadway enhancements. The East Contra Costa County Habitat Conservancy serves as the lead CEQA responsible agency for the project and is obtaining take coverage under the ECCC Habitat Conservation Plan/Natural Community Conservation Plan to authorize incidental take of protected species resulting from construction activities. The project relies on the Initial Study/Mitigated Negative Declaration and Mitigation Monitoring and Reporting Plan previously prepared by the Contra Costa County Department of Conservation and Development, with no additional environmental review required from the Conservancy, who formally adopts the existing environmental documentation as its own for CEQA compliance. The project is linked to State Route 4 Bypass Authority under Project No. 0662-6R254/4255, CP#09-55, Phase 2, and is intended to enhance traffic safety and reduce collisions along this corridor. Environmental mitigation strategies are outlined in the approved Mitigation Monitoring and Reporting Plan, ensuring compliance with habitat conservation objectives. The Conservancy’s responsibilities include oversight of mitigation measures and environmental monitoring throughout project implementation. Point of contact for environmental and planning inquiries includes Claudia Gemberling of Environmental Services and Joanne Chiu, Principal Planner, with all project records accessible through the CEQAnet registry under SCH#2009062094, and the project’s anticipated posting date is June 26, 2026.

General Info

Widen Vasco Road, install median barrier, enhance drainage and wildlife crossings, comply with CEQA via existing environmental docs.

Agency

California → East Contra Costa County Habitat Conservancy

Place of Performance

Brentwood, CA, 92514

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → East Contra Costa County Habitat Conservancy
Contacts2 people available
OfficeN/A
Organization / Agency
California → East Contra Costa County Habitat Conservancy
Office AddressN/A
Contacts
Joanne ChiuPrincipal Planner
Claudia GemberlingEnvironmental Services

Full Description

Show more
As a part of the Vasco Road Safety Improvements Project, Project No. 0662-6R254/4255, CP#09-55, Phase 2 (Project), State Route 4 Bypass Authority is seeking take coverage from the East Contra Costa County Habitat Conservancy (Conservancy) under the ECCC Habitat Conservation Plan/Natural Community Conservation Plan (HCP/NCCP) to widen a 1.5 mile stretch of Vasco Road roadway to install a median barrier while maintaining existing travel lanes, with associated drainage, bridge expansion, wildlife crossings, and roadway improvements between the cities of Brentwood and Livermore (see attached map). For purposes of the Project, the Conservancy is the CEQA responsible agency. Contra Costa County Department of Conservation and Development prepared an Initial Study/Mitigated Negative Declaration (IS/MND) and Mitigation Monitoring and Reporting Plan (MMRP) for the Project, the Vasco Road Safety Improvement Project SCH#2009062094 dated August 25, 2009 and an Addendum dated April 25, 2012. The Conservancy is a CEQA responsible agency for purposes of the Project and, as such, will rely on the approved IS/MND, the MMRP and environmental record prepared by Contra Costa County Department of Conservation and Development for purposes of fulfilling its responsibilities under CEQA.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil and infrastructure works, including underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation, shoring, asphalt paving, and the installation of utilities, manholes, and traffic signals. Additional requirements include land surveying, site security, traffic control, and storm water pollution prevention. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to various collective bargaining agreements. Interested parties must submit their quotes by November 18, 2025, via the Building Connected electronic system.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
Augusta — Please visit the City of Augusta's website for bid documents.
Solicitation # 027478.00
The Maine Department of Transportation and the City of Augusta are soliciting bids for the Eastern Avenue Pedestrian Crossings project, a Locally Administered Project focused on pedestrian improvements. The scope of work includes the removal of existing sidewalks and shoulders, the construction of concrete bump outs with ADA-approved ramps and landings, sidewalk reconstruction, the installation of Rectangular Rapid Flashing Beacons, and surface milling, shimming, and paving to manage surface water. The project is governed by the MaineDOT Standard Specifications and Standard Details dated March 2026 and the City of Augusta's Technical Standards, with the former taking precedence in the event of a conflict. The contract will be awarded to a responsible qualified bidder based on an evaluation of the total unit price base bid, a construction narrative, and a proposed project schedule. To be eligible, the lowest responsive bidder must have successfully completed a similar project. Proposals must be submitted in sealed form by 2:00 PM on December 9, 2026. The assumed award date is December 18, 2026, with a projected completion date of August 27, 2027, unless otherwise specified in the bidder's schedule. For bids exceeding $50,000, a 5% bid bond and a 100% performance and surety bond are required.
Maine Department of Transportation

POSTED

about 14 hours ago

DEADLINE

in 28 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS