Vaughn Lakebed Encroachment Permit PL-25-417

Forecast
PL-25-417State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Lake County

Place of Performance

Esplanade St; E St, Lakeport, CA, 95453

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Lake County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Lake County
Office AddressN/A
Contacts
Michelle IraceSenior Planner
Everado ChavezContractor

Full Description

Show more
The project proposes the demolition and replacement of an existing 10-foot by 20-foot wooden deck supported by six (6) 6x6-foot pressure-treated wood posts, all of which will be removed. A new 10-foot by 20-foot steel-frame deck will be constructed, supported by two (2) new 8-inch steel piles with a steel header beam. The new deck will be installed lakeward of the existing seawall, which was previously permitted and constructed under a separate project. Additionally, two (2) 4-inch steel piles will be installed to support and lift the gangway when not in use. This system is designed to prevent damage to the gangway ramp during periods of rough wave action. The proposed work is a like-for-like rebuild, maintaining the same footprint, dimensions, and function as the existing deck. No vegetation removal is proposed. Construction activities will include pile installation (as the only lakebed disturbance), while framing and decking work will occur above water and will not cause additional disturbance. All work will be performed from land using standard marine construction/ pile driving equipment. All other existing structures will remain. The floating docks are not part of this project, but a gangway will connect all structures together upon completion. A CDFW Lake and Streambed Alteration Agreement (LSAA) application has been submitted, and other required permits with the City of Lakeport are being coordinated. Best management practices (BMPs) will be implemented throughout construction to prevent debris, sediment, or materials from entering Clear Lake.

Similar Contracts

Same NAICS industry code

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS