Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Vehicle Assembly Building (VAB) High Bay 4 modifications (Demolition Phase) is support of Exploration Upper Stage (EUS) offline processing.

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the demolition phase of modifications to High Bay 4 of the Vehicle Assembly Building at NASA’s Kennedy Space Center to support offline processing of the Exploration Upper Stage. The scope includes the complete removal of the western Solid Rocket Booster build-up stand and its associated floor foundations, along with structural remediation of the eastern SRB build-up stand to prepare the facility for new operational requirements. This work is critical to modernizing the facility’s infrastructure and aligning it with future launch vehicle processing needs. The contract is set aside entirely for small businesses under the SBA’s Total Small Business Set-Aside provision as defined by FAR 19.5, with the NAICS code 238910 indicating specialized construction services. The forecast was posted on May 25, 2026, and the point of contact for inquiries is Jose O. Perez Morales. All work will be performed at the Kennedy Space Center, though specific location details are not provided in the available data.

General Info

Modifications and demolition in VAB High Bay 4 to support Exploration Upper Stage offline processing.

Agency

National Aeronautics And Space Administration → Kennedy Space CenterView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

Not specified

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNational Aeronautics And Space Administration → Kennedy Space Center
Contacts1 person available
OfficeN/A
Organization / Agency
National Aeronautics And Space Administration → Kennedy Space Center
View Agency Profile
Office AddressN/A
Contacts
Perez Morales Jose O

Full Description

Show more
Vehicle Assembly Building (VAB) High Bay 4 modifications (Demolition Phase) in support of Exploration Upper Stage (EUS) Offline Processing. This includes the removal of the western Solid Rocket Booster (SRB) build-up stand and associated floor foundations, as well as structural remediation of the eastern SRB build-up stand.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Mesa College Design Center Buildings Z100 – Z600 Renovation Project
Solicitation # 20260908048
The San Diego Community College District has issued solicitation number 20260908048 for the Mesa College Design Center Buildings Z100 through Z600 Renovation Project located at 7250 Mesa College Drive in San Diego, California. This comprehensive renovation involves extensive site and interior improvements, including demolition, carpentry, roofing, plumbing, HVAC, electrical, and landscape enhancements. The project scope specifically addresses mechanical air distribution, lighting systems, and civil engineering requirements such as storm drain and erosion control. A critical component of the work involves technical hazardous building material abatement to manage asbestos, lead-related construction, PCBs, and universal waste within the impacted buildings and walkway canopies. Bidders must adhere to rigorous administrative and contractual requirements, including the Statewide Educational Wrap Up Program (SEWUP) Owner Controlled Insurance Program (OCIP) and the San Diego Community College District Community Benefits Agreement. The latter mandates compliance with specific labor rules, union recognition, and wage standards. The solicitation package includes detailed site logistics and phasing plans to manage construction impacts on campus parking, ADA access, and worker travel paths. Interested parties must submit bids by the deadline of October 8, 2026, ensuring all required certifications, bid security forms, and subcontractor designations are included in accordance with the project manual and Division 00 procurement instructions.
San Diego Community College District

POSTED

about 13 hours ago

DEADLINE

in 29 days
View Details

More opportunities from National Aeronautics And Space Administration → Kennedy Space Center

Same awarding agency

NAICS: 236220
Federal
Modify Pump House (OPF) and Distribution System, Bldg K6-0895The project aims to replace the aging pump house at Building K6-0895 at Kennedy Space Center with a new decentralized fire protection system designed to ensure uninterrupted support for critical launch facilities. The new system will operate independently from existing infrastructure to prevent any disruption to ongoing operations during construction and implementation. This approach eliminates reliance on outdated components and ensures continuous fire protection capability without compromising mission-critical functions. The scope includes demolishing the current pump house and overhauling or replacing all associated fire protection equipment and distribution components to meet current safety and operational standards. This initiative is classified under NAICS code 236220, indicating it falls within the industrial and commercial construction sector. The project is forecasted by NASA’s Kennedy Space Center and is part of the agency’s efforts to modernize essential facilities supporting space launch operations. While no solicitation number or set-aside details are available at this time, the timing of the forecast suggests preparatory work is underway for future procurement. The location of performance is tied to the Kennedy Space Center, though specific site details such as street address or zip code are not provided in the available data. The project is critical for maintaining fire safety resilience in one of the nation’s most vital aerospace support locations.
Commercial and Institutional Building Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS