Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Vertical Turbine Pump Supply & Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the supply and installation of a vertical turbine pumping unit for pump station projects within the City of Cedar Hill, Texas. The scope of work includes the removal of the existing bowl assembly and the installation of a new 1,400 gpm pump equipped with a fabricated discharge head, stuffing box, cartridge mechanical seal, and seal flush system. The contractor must ensure the equipment is NSF-61 certified for potable water and adheres to all ANSI/Hydraulic Institute Standards to deliver a fully operational unit. This opportunity is categorized under NAICS code 237110, with a response deadline of September 22, 2026.

General Info

Supply and install NSF-61 certified vertical turbine pump for Cedar Hill, Texas.

Agency

Texas → City of Cedar HillView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of PW25-0010.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

MEADOW CREST PUMP STATION 2026 REHABILITATION

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → City of Cedar Hill
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → City of Cedar Hill
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs a vertical turbine pumping unit for prime contractors on City of Cedar Hill pump station projects. Removes existing bowl assembly and installs a new 1,400 gpm pump with fabricated discharge head, stuffing box, cartridge mechanical seal, and seal flush system. Ensures NSF-61 certification for potable water and adheres to ANSI/Hydraulic Institute Standards. Delivers an installed and operational vertical turbine pump.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and site improvements. Additional requirements encompass pavement removal and restoration, traffic control, utility coordination, disinfection, startup, and commissioning to ensure a complete and operational system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for various trades, including steel pipe welding, trenchless construction, electrical and instrumentation, and the supply of aggregates, ready-mix concrete, and steel fittings. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. Quotes are due by September 18, 2026, at 2:00 PM PT, and should be directed to Alyssa Callaway. This solicitation is open to DBE, MBE, WBE, and SBE set-asides under NAICS code 237110.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the targeted retrofit of approximately 343.59 linear feet of roadway to implement green infrastructure. Key deliverables include the installation of approximately 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the planting of six native trees and approximately 345 native plants or approved equivalents. The project is designed to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area and requires necessary drainage, underdrain, inlet, pipe, and downspout work, as well as ADA-compliant curb, sidewalk, apron, crossing, and traffic-calming improvements. This solicitation specifically seeks MBE, DBE, and WBE subcontractors and suppliers, with a strong emphasis on small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, small businesses are encouraged to form consortiums. Bids must be submitted by September 17, 2026, at 4:00 P.M. Primary points of contact for this opportunity are Jennifer Wilson and Jonah Leith. The project concludes with final stabilization, cleanup, and restoration of the site.
Harbel, Inc.

POSTED

about 7 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves of various diameters, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation is open to small businesses, including SDVOSB, MBE, and WBE certified entities, with a bid response deadline of September 29, 2026. James W. Fowler Co. is actively encouraging M/W/DBE participation and offering support for bonding, insurance, and material procurement to qualified subcontractors.
James W. Fowler Co.

POSTED

about 7 hours ago

DEADLINE

in 13 days
View Details

More opportunities from Texas → City of Cedar Hill

Same awarding agency

NAICS: 811310
New
SLED
Fire Hydrant Inspection and Testing Services
Solicitation # RFP-2026-0003
The City of Cedar Hill is soliciting proposals under RFP-2026-0003 for professional fire hydrant inspection, maintenance, controlled exercising, digital record documentation, and NFPA 291 fire flow testing for Fiscal Year 2027. The scope of work involves approximately 2,100 hydrants and 540 fire flow tests, with all services required to be completed by September 30, 2027. The resulting agreement will have an initial term of three years, with the City reserving the right to renew the contract on an annual basis. All work must adhere to NFPA 291 and AWWA M17 standards, and the contractor must utilize equipment capable of controlled exercising and digital data collection. Proposals are due by 4:00 p.m. CST on October 6, 2026, and must be delivered to April Harrison at the Cedar Hill Government Center. Submissions must include two hard copies and one digital PDF version on a USB drive. A mandatory pre-bid conference is scheduled for September 21, 2026, and written questions must be submitted by September 25, 2026. The award will be based on the best overall value and benefit to the City rather than the lowest price. Required submissions include a bid bond or check for 5 percent of the bid, and the successful contractor must provide performance and payment bonds for 100 percent of the contract price. Payment terms are net 30, and all invoices must reference the City Purchase Order number.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

1 day ago

DEADLINE

in 21 days
View Details
NAICS: 237110
SLED
MEADOW CREST PUMP STATION 2026 REHABILITATION
Solicitation # PW25-0010
The City of Cedar Hill is soliciting sealed bids for the Meadow Crest Pump Station 2026 Rehabilitation project, identified as solicitation PW25-0010. The scope of work involves furnishing all labor, tools, materials, and equipment necessary to rehabilitate equipment at the pump station. Key tasks include the removal and replacement of a gas detector, four 12 inch isolation valves, and a vertical turbine pump, as well as the installation of two 18 inch isolation valves, the rehabilitation of a pump motor and automatic transfer switch, and the relocation and installation of electrical disconnect equipment. All work must adhere to NCTCOG specifications and provided construction plans. Bids are due by 2:00 p.m. on Tuesday, September 22, 2026, and must be delivered to Purchasing Coordinator April Harrison at the Cedar Hill Government Center. Submissions must include two hard copies and one digital PDF version on a USB drive, accompanied by a bid bond or certified check for at least five percent of the total maximum bid price. The contract will be awarded to the lowest and best qualified bidder. The successful contractor must provide performance and payment bonds totaling 100 percent of the contract price within ten business days of the award notice. Performance is expected within 270 working days from the limited notice to proceed for procurement or 90 working days from the full notice to proceed for construction, whichever is sooner.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS