Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Vineyard South Mining Use Permit

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has granted Streambed Alteration Agreement SAC-64369-R2 to Granite Construction Company for the Vineyard South Mine project. This agreement permits surface mining on a 38.65-acre parcel, specifically targeting 25.77 acres for extraction while leaving the remaining land undisturbed. Once mining operations conclude, the land will be transitioned into open space for non-prime agriculture or dryland grazing. The project is designed to avoid environmental disruption by ensuring no in-water work occurs and restricting construction to periods when existing drainages are dry. There will be no activity within the Elder Creek channel and no removal of riparian trees. The project is coordinated through the Sacramento County agency and the California Department of Fish and Wildlife.

General Info

Granite Construction may mine 25.77 acres at Vineyard South Mine under agreement SAC-64369-R2.

Agency

California → Sacramento County

NAICS

212114 - Surface Coal MiningView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

SAC-64369-R2 NOD-EIR

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Sacramento County
Office AddressN/A
Contacts
Mark MicheliniProject Proponent
Harvey TranSenior Environmental Scientist, Specialist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number SAC-64369-R2, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Granite Construction Company. The project is limited to the surface mining of a 38.65-acre parcel (Phase 2B) of the Vineyard South Mine. Approximately two-thirds of the parcel (25.77 acres) will be mined with the remainder left undisturbed or reserved for alternative uses. After mining is completed, the parcel will continue to be open space (suitable for dryland grazing) and/or non-prime agriculture. No in-water work will be required for the project; construction activity will occur while the existing drainages are dry. There will be no work on the Elder Creek channel, and no riparian trees will be removed.

Similar Contracts

Same NAICS industry code

NAICS: 212114
SLED
Minor Modification No. MIM 25-056 Project Location - Specific: 14600 Avenue 420, Orosi, CA
Solicitation # MIM 25-056
Orosi Rock, LLC, owned by Gary Reiff, is seeking to extend the operational life of its existing surface mining facility located at 14600 Avenue 420 in Orosi, California, from the original expiration date of 2025 to 2045 under Permit PMR 11-003. This request is formalized as Minor Modification No. MIM 25-056 and is being processed as a categorical exemption under the California Environmental Quality Act (CEQA) Class 1, Section 15301, which applies to the continued use of existing facilities without changes in intensity, scope, or physical expansion. The project involves no new construction, increased production, or environmental impact beyond the current authorized operations, and approval is contingent upon compliance with this regulatory exemption rather than through a competitive procurement or detailed environmental review. The County of Tulare acts as the lead agency with oversight authority, and the modification does not include financial terms, pricing, contract clauses, or procurement-specific elements such as evaluation factors, payments, or invoicing systems. Contact for the process is maintained through Tulare County’s Resource Management Agency, with key personnel including Gary Mills, Jessica Wills, and Jose Saenz handling permitting and environmental review, while the applicant, Orosi Rock, LLC, remains responsible for operational compliance. No federal acquisition regulations, contract clauses, or standardized federal procurement structures are involved, as the action is purely a local land use and environmental regulatory adjustment under state law.
Tulare County

POSTED

7 months ago

DEADLINE

N/A
View Details
NAICS: 212114
SLED
Surface Mining Permit/Interim Management Plan No. PMR 25-001
Solicitation # PMR 25-001
CEMEX Construction Materials Pacific, LLC is seeking approval for an Interim Management Plan for its 230-acre Lemon Cove Surface Mining Site located in the AE-20 Exclusive Agricultural Zone in Tulare County, California. The plan is designed to ensure the site remains environmentally stabilized and properly maintained during periods of inactivity, preventing degradation until mining operations resume or reclamation efforts begin. This is not a competitive procurement but a ministerial action under the California Environmental Quality Act (CEQA), specifically exempt under Public Resources Code Section 2770(h) and Section 21080(b)(1), meaning it requires no environmental impact review and is processed administratively by Tulare County’s Resource Management Agency. The beneficiary of the plan is the State of California and Tulare County, with no assigned contract value, pricing, or financial terms because it is a permitting and regulatory compliance process rather than a purchase of goods or services. The primary deliverable is the approved plan itself, which must conform to standards set by the State Mining and Geology Board and comply with local land use regulations without altering the existing land designation or authorizing new construction. The project’s place of performance is clearly defined as the mining site situated approximately 0.68 miles northwest of State Highway 198 and on the south side of State Highway 216 in Woodlake, California. No period of performance, delivery schedule, or FOB terms apply, as no procurement or contract award is involved. There are no Federal Acquisition Regulation (FAR) clauses, contract types, payment offices, invoicing methods, accounting codes, or COR/COTR designations, as this is a state-level environmental permitting action. The application is submitted to the County of Tulare, with key contacts including Gary Mills, Jessica Wills, and Jose Saenz from the Resource Management Agency. There is no specified deadline for submission, and documents may be filed electronically or via hard copy. No representations, certifications, socioeconomic statuses, UEI or CAGE codes, or small business designations are required or provided, as the process does not involve federal contracting procedures. The focus remains solely on regulatory compliance, environmental stewardship, and administrative approval under California law, with inspection and acceptance governed by county oversight and adherence to state mining and environmental guidelines.
Tulare County

POSTED

8 months ago

DEADLINE

N/A
View Details