Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Vineyard Surface Water Treatment Plant Filter Repair

Active
41020State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sacramento County Water Agency is soliciting bids for the Vineyard Surface Water Treatment Plant Filter Repair project, specifically focusing on Filter 7 sand replacement. The scope of work involves the removal of anthracite and spent silica sand, performing internal joint repairs, and the procurement and installation of new sand media to restore the filter. This project requires the contractor to provide all necessary labor, materials, and equipment in strict accordance with the Sacramento County Standard Construction Specifications and applicable regulatory permits. Bids for this solicitation, identified as contract number 41020, must be submitted electronically by September 24, 2026, at 2:00 pm. The estimated construction cost is 100,000 dollars, and the project must be completed within 40 working days. Qualified bidders must hold a Class A contractor license. The project is managed by the Sacramento County Water Agency in California, with technical specifications and layout details provided in the project drawings and special provisions.

General Info

Sacramento County Water Agency seeks bids for Vineyard Treatment Plant filter repairs by September 24.

Agency

California → Sacramento County Water AgencyView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(3)

Contract No. 41020 - VSWTP Filter #7 Sand Replacement

PDF10 pagesspecifications

Contract 41020 - Vineyard Surface Water Treatment Plant Filter Repair

PDF10 pagesifb

Contract 41020 - VSWTP Filter #7 Sand Replacement Project Drawings

PDF5 pagesspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento County Water Agency
Contacts2 people available
OfficeSacramento, CA, 95827, USA
Organization / Agency
California → Sacramento County Water Agency
View Agency Profile
Office AddressSacramento, CA, 95827, USA
Contacts
Mitra ImSenior Civil Engineer
Crystal SheehanSenior Contract Services Officer

Interested Companies (17)

Show more
Entram
PORT CHARLOTTE, FL
GSE Construction
Livermore, CA
West Shore
Sacramento, CA

See All 17 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of associated appurtenances such as trenchless crossings, air release valves, blowoff assemblies, valves, and fittings, as well as connections to existing water facilities. Additional requirements encompass the construction of flow control facility components, site improvements, pavement removal and restoration, traffic control, and the final disinfection, startup, and commissioning of the pipeline system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for various trade scopes, including steel pipe welding, electrical and instrumentation, trenchless construction, and materials testing. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. The solicitation is open to various set-aside categories, including Small Business, Women-Owned Small Business, and HUBZone entities. Quotes are due by September 18, 2026, at 2:00 PM PT, and all inquiries should be directed to Alyssa Callaway.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project on South Marsham Street in Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of green infrastructure between Gravel Lane and US Route 50. Key deliverables include the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the planting of six native trees and approximately 345 native plants. The scope also encompasses necessary drainage, underdrain, inlet, pipe, and downspout work, as well as limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. The project is designed to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business designations, including SDB, WOSB, HUBZone, VOSB, and SDVOSB, with an encouragement for these entities to form consortiums if individual bid items are too large. Bids are due by September 17, 2026, at 4:00 P.M. The primary point of contact for the solicitation is Jennifer Wilson, with contract administration handled by Jonah Leith.
Harbel, Inc.

POSTED

about 6 hours ago

DEADLINE

in 6 days
View Details

More opportunities from California → Sacramento County Water Agency

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS