Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

VMS REALIGNMENT OAK STREET

Open
2027-ITB-407State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The VMS Realignment Oak Street project, solicitation number 2027-ITB-407, is a construction effort managed by the City of New Haven Department of Engineering to correct a view shed misalignment for a Variable Message Sign facing Eastbound traffic entering the I91/I95 corridor. The scope of work involves the installation of a new foundation west of the existing sign, the relocation of the VMS and its cantilever steel support structure to the new foundation, and the restoration of power and communications. This process requires interrupting existing conduit, salvaging wires, and coordinating with CTDOT for access to the control cabinet and lock out/tag out procedures. All construction must adhere to D.O.T. standard specifications, with specific requirements for ultrasonic testing of groove welds and hot-dip galvanizing of steel coatings. The project requires the submission of bid pricing via the city's eProcurement Portal by January 6, 2027. Key deliverables include a field assessment of the support structure and a final alignment survey. Contractors must provide performance and payment bonds, a certificate of insurance, and comply with prevailing wage state rates and Equal Employment Opportunity requirements. For contracts exceeding $25,000, the City utilizes a Vendor Performance Report to evaluate quality and communication on an A–F scale, where low scores may trigger corrective action plans or debarment reviews. Invoicing is handled through a specific portal under a strict No Purchase Order, No Payment Policy, with an optional Priority Payment Program available for accelerated electronic payments.

General Info

New Haven project to relocate a Variable Message Sign for better traffic visibility.

Place of Performance

CT, USA

Set-Aside

NONE

Documents

8
DOCX, High priority: read this first1 page · mbe-utilization-form
High
PDF, High priority: read this first10 pages · contract-document
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstwage-determination
High
PDF, Low priority1 page · budget-fines-penalties-chart
Low
PDF, Low priority2 pages · special-notice
Low
PDF, Low priority9 pages · past-performance
Low

Read all 8 documents

Due in 45 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 45 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 8 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConnecticut → Engineering
Contacts2 people available
OfficeNew Haven, CT, 06510, USA

Interested Companies (2)

NewsWethersfield, CT
North America Procurement Council Inc., PBCChicago, IL

Full Description

Show more
The purpose of this project is to correct an existing misalignment of the view shed to a VMS facing Eastbound traffic entering the I91/I95 corridor from downtown New Haven. The scope consists of placing a new foundation West of the existing VMS, then relocate the existing VMS and the cantilever steel support structure onto the new foundation. Existing conduit is to be interrupted, wire to be pulled back and salvaged, then both tied into the new foundation and terminated at sign.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
SLED
PW-292 GIULIO CESARE PAVEMENT REPLACEMENT PROJECT
Solicitation # 2027-IFB-009
The PW-292 Giulio Cesare Pavement Replacement Project is an invitation for bids issued by the City of Sierra Vista, Arizona, to improve a section of Giulio Cesare Avenue between Charleston Road and Michelangelo Drive. The scope of work involves milling existing asphaltic concrete pavements and replacing them with 4 inches of asphaltic concrete over a 10-inch aggregate base course, along with utility frame restoration and striping. The project must be completed within 60 to 90 calendar days of the Notice to Proceed, with the contractor required to provide weekly construction schedules and adhere to OSHA safety regulations and AASHTO, ASTM, or ADOT testing standards. The contract will be awarded to the lowest responsive and responsible bidder who provides a valid Arizona State Contractor's License and a bid bond of at least 10 percent of the bid amount. As a project funded via Federal Community Development Block Grants (CDBG), the contract is subject to strict federal compliance requirements. These include adherence to Davis-Bacon prevailing wage rates, Equal Employment Opportunity (EEO) standards, and non-discrimination mandates under Title VI of the Civil Rights Act and the Americans with Disabilities Act. Contractors must provide a performance bond and a labor and materials payment bond totaling 100 percent of the contract price for projects exceeding $100,000. Bidders are required to submit their proposals electronically via OpenGov by December 7, 2026, including a non-collusion affidavit, W-9 or W-8 forms, and a list of subcontractors and material suppliers. There is no specified set-aside status for this solicitation.
PROCUREMENT

POSTED

about 21 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237310
New
SLED
Union Street and 4th Avenue Improvements
Solicitation # 2027-RFB-00000020
The City of San Luis, Arizona, is soliciting proposals for the Union Street and 4th Avenue Improvements project, identified by solicitation number 2027-RFB-00000020. The scope of work involves roadway and intersection improvements, including the widening of approximately one-half mile of 4th Avenue to include bicycle lanes and a center turn lane. Key deliverables include the installation of new asphalt pavement, sidewalks, curb and gutter, and a new traffic signal at the intersection of Union Street and 4th Avenue. The project also requires utility coordination, drainage improvements, and adherence to ADA compliance and OSHA excavation safety regulations. Construction must follow Maricopa Association of Governments (MAG) and City of Yuma standards, with all materials and installations conforming to ADOT specifications. Bids must be submitted through the OpenGov Procurement Portal by December 14, 2026. Each submission must include a bid guarantee of 10 percent of the total bid amount via certified check, cashier's check, or bid bond, along with a non-collusion affidavit, a subcontractors and suppliers list, and a certificate of insurance. The contract will be awarded to the lowest qualified responsive bidder. The period of performance begins with the Notice to Proceed and concludes upon final acceptance. The successful contractor will be required to provide performance and payment bonds per Arizona Revised Statutes and maintain necessary insurance. Payment is processed via a City-accepted Contractor Payment Request form.
Engineering

POSTED

about 22 hours ago

DEADLINE

in 21 days
View Details

More opportunities from Connecticut → Engineering

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS