Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on April 28, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

W9127820R0007 AM01Two-Phase Design and Construction Site Development and Utilities Phases I and II, Tyndall AFB, FL

Closed
W9127820R0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Three Lakes G111 Replacement
Solicitation # FWC 26/27-10C
The Florida Fish and Wildlife Conservation Commission is soliciting competitive lump-sum pricing for the Three Lakes G111 Replacement project in Osceola County, Florida. The scope of work involves replacing an existing five-barrel CMP culvert structure and control gates with a new cast-in-place five-barrel reinforced concrete box culvert structure. Key deliverables include the installation of reinforced concrete headwalls and rip-rap blankets both upstream and downstream, as well as the implementation of a temporary steel sheetpile cofferdam and dewatering system to facilitate construction in dry conditions. The estimated budget for this project is 3.5 million dollars. Bidders must be registered in the MyFloridaMarketPlace and SunBiz systems and submit sealed bids by October 13, 2026, at 4:00 PM ET. Requirements for the award include a bid bond of at least five percent for bids exceeding 100,000 dollars, and the successful contractor must provide 100 percent performance and labor and material payment bonds. Additionally, contractors must hold a current State Contractor license, provide a Unique Entity Identifier, and ensure compliance with the Build America, Buy America provision and Chapter 255 of the Florida Statutes. Work is generally restricted to weekdays between 7:00 AM and 7:00 PM, and final completion is defined as 30 days after the issuance of a Certificate of Substantial Completion.
Florida Fish and Wildlife Conservation Commission

POSTED

about 2 hours ago

DEADLINE

in 3 days
NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 6 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 6 hours ago

DEADLINE

in 1 day
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 6 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 11 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Tyndall AFB, FL, 32403, USA

Set-Aside

NONE

Documents

3

AM01.pdf

PDF

W9127820R0007+EM+385-1-1.pdf

PDF

W9127820R0007+PHASE+ONE+SPECS.PDF

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Mobile
Contacts2 people available
OfficeMOBILE, AL, 36602-3630, USA
Office AddressMOBILE, AL, 36602-3630, USA
Contacts
Derrica J. Frazier-Corbie
Kathleen A. Achord

Full Description

Show more
Amendment No. 0001 posted 28 April 2020. Soliciation No. W9127820R0007, Two Phase Design and Construction Site Development and Utilities Phase I and II.

More opportunities from Department Of Defense → W074 Endist Mobile

Same awarding agency

NAICS: 561210
New
Federal
Operation and Maintenance of Government-Owned Facilities and Equipment, Jim Woodruff Lock and Dam and Lake Seminole Project, Florida and Georgia
Solicitation # W9127826RA063
This contract is a Small Business Set-Aside IDIQ SATOC for the operation, maintenance, and repair of government-owned facilities and equipment at the Jim Woodruff Lock and Dam and Lake Seminole Project, spanning Florida and Georgia. The period of performance runs from January 1, 2027, to December 31, 2031, featuring a five-year ordering period. The scope of work is divided into 15 Technical Provisions covering a wide array of services, including general management, janitorial and custodial services, grass mowing, dumpster services, vegetation and pest control, facility maintenance, and specialized support for the lock, dam, spillway, and powerhouse. The contractor is responsible for maintaining these assets in safe and efficient operating condition, adhering to EM 385-1-1 safety standards and USACE sign standards. The award is based on a best-value tradeoff analysis where non-price factors, specifically past performance and technical approach, are significantly more important than price. The contract includes a firm-fixed-price seed task order for the first year of performance. Key administrative requirements include the submission of a Contractor Quality Control Plan within 15 days of award and strict adherence to electronic invoicing and submission protocols via PIEE. The government provides various furnished buildings, vehicles, and equipment to support the contractor's performance. Maintenance tasks are categorized by cost, with a minor maintenance threshold of 15,000 dollars for specific billing purposes.
Facilities Support Services

POSTED

4 days ago

DEADLINE

in 13 days
View Details
NAICS: 237990
Federal
KC-46A ADAL Apron and Hydrant Fueling Pits
Solicitation # W9127825RA068
Solicitation W9127825RA068 is a design-bid-build construction project for the KC-46A ADAL Apron and Hydrant Fueling Pits at MacDill Air Force Base, Florida. Managed by the U.S. Army Corps of Engineers, Mobile District, the project has an estimated cost range between 60 million and 120 million dollars. The scope of work includes replacing north apron and taxilane pavement, upgrading the storm drainage system, enhancing electrical capacity, and improving the fuel hydrant system. Key structural requirements involve the installation of compression concrete paving joint sealants, monolithically cast-in-place concrete drilled shaft foundations, and chain link fences and gates. The project is expected to be completed within 1050 calendar days, with performance beginning within 8 calendar days of award. The government intends to award a single firm-fixed-price contract using a best-value source selection process. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal, with a deadline of October 23, 2026. Evaluation factors include technical capabilities, past performance, and a small business approach, with a minimum requirement of 23 percent small business participation. Non-small business offerors must provide a subcontracting plan per FAR 52.219-9. The contractor is required to implement a comprehensive Quality Control program and adhere to USACE construction standards, including specific safety and phasing plans for airfield construction.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 3 days
View Details
NAICS: 236220
Federal
Special Notice: FIO Posting for W9127826SC001 Tyndall Deployment Center - Crash/Fire Rescue Station - Demo Hangar 4 Progressive-Design-Build OT
Solicitation # W9127826SC001
The U.S. Army Corps of Engineers Mobile District is issuing a special notice for market intelligence regarding an upcoming Progressive Design-Build project at Tyndall Air Force Base, Florida. The project, identified by solicitation number W9127826SC001, will be executed under 10 USC 2808a Other Transaction Authority for Construction. The scope of work includes the demolition of Hangar 4 and the construction of a Deployment Processing Center approximately 37,308 to 44,733 square feet, a secure cargo yard of approximately 123,785 square feet, and a co-located flight kitchen. Additionally, the project may involve the replacement of an inadequate 1965 facility with a new 34,316 gross square foot Crash/Fire Rescue Station. The work is divided into two phases, with Phase 1 focusing on design development and preconstruction services, followed by Phase 2 for final design and construction. Technical requirements mandate compliance with various Unified Facilities Criteria (UFC) standards, including airfield planning, cybersecurity for control systems, and environmental severity classifications for corrosion-prone locations. The project includes the installation of utilities, pavements, an emergency generator, a fire alert system, and necessary soil remediation. Contractors must adhere to strict hazardous waste packaging and labeling standards, as well as FDOT and MUTCD guidelines for site markings. Quality assurance is emphasized through required roof quality plans, design quality control reviews, and specific certifications for masonry inspectors. Interested parties are required to submit a statement of interest and bonding capability to the government for consideration.
Commercial and Institutional Building Construction

POSTED

14 days ago

DEADLINE

in 21 days
View Details
NAICS: 237990
Federal
SOURCES SOUGHT: Carters Reregulation Dam Short Term Repairs
Solicitation # W9127827RA008
The U.S. Army Corps of Engineers, Mobile District, is conducting market research through a Sources Sought Synopsis to identify qualified small businesses for a firm-fixed-price construction project at the Carters Reregulation Dam in Chatsworth, Georgia. The project, categorized under NAICS code 237990, involves structural concrete and gate repairs to address concrete expansion caused by Alkali-Silica Reactivity. The scope of work includes the demolition of pier stoplog slots, installation of new steel stoplog guides and embedded seal plates, and the placement of specialized shrinkage-compensating concrete. Additionally, the contractor will replace side and bottom seals on four Tainter gates and seals on eight stop logs, while maintaining full responsibility for the design, fabrication, and installation of temporary gate support shoring and Temporary Dewatering Structures. The estimated magnitude of this construction effort is between 5,000,000 and 10,000,000 dollars, with an anticipated performance period of approximately 180 calendar days. To ensure operational continuity, work must be performed sequentially, limiting dewatering to one gate bay at a time. Interested firms, including those with 8(a), HUBZone, Service Disabled Veteran Owned, and Women-Owned Small Business designations, must submit a response not exceeding eight pages by October 20, 2026. Submissions must include company contact information, business size, bonding capacity, a detailed capabilities statement regarding hydraulic steel structures and dewatering systems, and up to three relevant past performance projects completed within the last five years.
Other Heavy and Civil Engineering Construction

POSTED

15 days ago

DEADLINE

in about 1 hour
View Details
NAICS: 236220
Federal
Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office
Solicitation # W9127826RA087
The U.S. Army Engineer District, Mobile, is soliciting proposals for a firm-fixed-price, design-build construction project to establish the Black Warrior, Tombigbee, Alabama, and Coosa Rivers Project Management Office in Tuscaloosa, Alabama. The scope of work includes all labor, equipment, and materials for the construction of the office building, as well as necessary site work, utilities, and environmental remediations. The project has an estimated cost range between 10 million and 25 million dollars, with a strict Construction Cost Limitation of 21 million dollars. The total period of performance for completion is 545 calendar days. This is an unrestricted, two-phase competitive procurement using a non-price/price trade-off analysis to determine the most advantageous offeror. Phase One focuses on the evaluation of technical approach and performance capability to select a maximum of five firms for Phase Two, where detailed design requirements will be finalized. Key requirements include the provision of a dedicated project team, including a Construction Project Manager and Quality Control Managers, and adherence to EM 385-1-1 safety standards. The government has established small business participation goals of 23 percent for small businesses and 5.77 percent for HUBZone firms. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal in PDF format.
Commercial and Institutional Building Construction

POSTED

15 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS