Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

W912EK26BA014 - MISSISSIPPI RIVER BASIN LOCK AND DAM 21 QUINCY, IL BOLTED TAINTER GATE FABRICATION

Active
W912EK26BA014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → W07V Endist Rock IslandView Agency

NAICS

332312 - Fabricated Structural Metal ManufacturingView NAICS

Place of Performance

IL

Set-Aside

NONE

Documents

(2)

B08___W912EK26BA014___PLAN_SET_SOL_FINAL.pdf

PDF

B08___W912EK26BA014_with_Spec.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist Rock Island
Contacts2 people available
OfficeROCK ISLAND, IL, 61299-5001, USA
Organization / Agency
Department Of Defense → W07V Endist Rock Island
View Agency Profile
Office AddressROCK ISLAND, IL, 61299-5001, USA

Full Description

Show more
USACE - Rock Island - This project involves the fabrication and delivery of new bolted Tainter gates for Lock and Dam 21. The work includes the off-site fabrication of tainter gates, measuring approximately 20 feet high by 64 feet long, which are comprised of cold-rolled shapes and welded assemblies. These welded assemblies must comply with AWS D1.1 standards and are designed without fracture-critical members to enhance structural reliability.

Similar Contracts

Same NAICS industry code

NAICS: 332312
New
Federal
EOU Sunshades Creech AFB
Solicitation # F4FANG6133A001
The contract for the Experimental Operations Unit at Creech AFB requires the design, fabrication, and construction of four new CCA shade structures on the south ramp of the airfield parking apron, alongside the relocation of four existing sunshades and the demolition of a fifth. Each new structure must accommodate four aircraft parking bays and include integrated LED lighting with conduit and CU wiring, service power outlets, a service panel with Una-strut support, and a solar battery-powered obstruction light. The structures must be powered by a photovoltaic array with a 12-hour battery backup, and all materials must comply with stringent environmental and structural standards, including wind load resistance of 110 MPH, corrosion-resistant fasteners, zinc chromate primer, and Frazee Paint #213 Travatan for desert durability. Structural design and construction must adhere to UFC 3-301-01, ASCE 7-16, IBC 2018, ANSI/AISC 441, and ASTM F3125, with engineering submissions requiring approval from the Engineer of Record. All work must be completed within a 210-day period, divided into a 90-day design phase and a 120-day construction phase per structure, with delivery and acceptance occurring at Creech AFB under FOB Destination terms. The solicitation is a Total Small Business Set-Aside under NAICS code 332312 and follows a Lowest Price, Technically Acceptable (LPTA) evaluation methodology, where price is the primary determinant among technically compliant offers. Offerors must be registered in SAM, provide a valid UEI and CAGE code, and certify their small business status under FAR 52.219-1 and its alternates. All personnel must undergo security screening, complete base training, and adhere to strict airfield restrictions including no access to active runways, mandatory FOD sweeps, and no photography without authorization. Invoicing must be processed via WAWF, and the contractor is required to submit detailed documentation including 35%, 65%, 95%, and 100% design drawings, as-built AutoCAD and PDF files, redline revisions, an O&M manual compliant with ASTM standards, and FAA Form 7460-1 submissions. Warranties must cover five years for construction, 40 years for materials, and 25 years for appearance. Proposals must be submitted electronically by
FA4861 99 Cons Lgc

POSTED

1 day ago

DEADLINE

in 9 days
View Details

More opportunities from Department Of Defense → W07V Endist Rock Island

Same awarding agency

NAICS: 237110
New
Federal
88TH RD US ARMY RESERVE CENTER ARLINGTON HEIGHTS, IL WATER INFRASTRUCTURE IMPROVEMENTS- SOLICITATION
Solicitation # W912EK26BA017
The US Army Corps of Engineers Rock Island District is issuing a presolicitation notice for water infrastructure improvements at the Arlington Heights 88th Readiness Division, COL. P. Schulstad U.S. Army Reserve Center located at 1515 West Central Road in Arlington Heights, Illinois. The project involves substantial civil works including demolition, directional drilling, trenching, and the installation of a new water connection to the Village of Arlington Heights watermain, along with associated components such as water service and main lines, gate valves, vaults, meters, and boxes. Additional tasks include chlorination testing of the new system, removal and replacement of fire hydrants, HMA patching of asphalt concrete pavement, repair of concrete sidewalks and drives, investigation and repair of a leaking abandoned watermain, seeding of disturbed areas, and full site restoration. The contract includes a base bid and Option A, which replaces the connection to the municipal watermain with a plug and omits some elements of the base scope. This is an 8(a) competed set-aside under NAICS code 236210 for construction of buildings, with responses due by July 30, 2026. All submissions received in response to this presolicitation are for informational purposes only and will not be evaluated or compensated. The primary point of contact is Jocelyn Rain, and further inquiries can be directed to the Rock Island District office in Illinois.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 28 days
View Details