Waldo Road Over Dry Creek Bridge Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Yuba County is planning to replace the structurally deficient Waldo Road over Dry Creek Bridge, located approximately 14 miles northeast of Wheatland within the Spenceville Wildlife Area. The existing bridge, with a sufficiency rating of 9.3, is unsafe for modern vehicular and pedestrian use, fails to meet current engineering standards, and contains hazardous lead paint, making preservation impractical. The proposed replacement is a continuous three-span, post-tensioned concrete box girder bridge measuring 72 feet, 96 feet, and 72 feet in span lengths, featuring two 12-foot travel lanes, two 4-foot shoulders, and a 34-foot clear width between barriers. The new structure will include vehicular railings, pinned column piers, seat-type abutments with wingwalls, and spread footings anchored into intact rock to ensure long-term stability. The alignment will be realigned to the east to correct dangerous curves on the approaches and slightly elevated to improve flood water conveyance, with approach grades transitioning smoothly to match existing road levels. Upon completion, the old bridge will be demolished, and a portion of the original right-of-way will be transferred to the California Department of Fish and Wildlife to benefit the wildlife preserve. The project is designed to meet or exceed County, AASHTO, and Caltrans standards to ensure safety for all users, including emergency vehicles, and to comply with regional transportation goals. No rehabilitation or repair of the existing structure is viable due to its substandard design and deteriorated condition, and under a No Build alternative, the bridge’s continued degradation would lead to environmental and safety impacts under both CEQA and the National Historic Preservation Act.

General Info

Replace unsafe Waldo Road bridge with new concrete box girder bridge, realign alignment, transfer land to wildlife preserve.

Agency

California → Yuba County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Waldo Road and Spenceville Road, Wheatland, CA, 95903

Set-Aside

NONE

Documents

(4)

Waldo Road Over Dry Creek Bridge Replacement Project Partially Recirculated Draft EIR June 2026

PDFenvironmental-impact-report

Waldo Road Over Dry Creek Bridge Replacement Project NOC and EIR Transmittal

PDFnoc-eir-transmittal

Waldo Road Over Dry Creek Bridge Replacement Project Summary Form

PDFenvironmental-summary

Waldo Road Over Dry Creek Bridge Replacement Project Partially Recirculated Draft EIR Notice

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Yuba County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Yuba County
Office AddressN/A
Contacts

Interested Companies (1)

Show more
Dokken Engineering
Folsom, CA

Full Description

Show more
Yuba County (County) is proposing to implement the Waldo Road over Dry Creek Bridge Replacement Project (Project), which would build a new bridge to carry Waldo Road over Dry Creek, approximately 100 feet upstream from the existing bridge (Bridge No. 16C0006). The Project is located in rural Yuba County, roughly 14 miles northeast of Wheatland. Waldo Road is a generally north/south road and the bridge crosses Dry Creek on a generally north/south alignment. Waldo Road and connecting roads Spenceville Road and Camp Far West Road, are all lightly traveled routes passing through rolling Sierra foothills terrain. The bridge is located within the Spenceville Wildlife Area, a 11,900-acre wildlife preserve and public outdoor recreation area administered by the California Department of Fish and Wildlife (CDFW). The existing bridge is currently classified as structurally deficient, with a sufficiency rating of 9.3. A new bridge is necessary to meet current design and safety standards which can safely convey vehicles, including emergency response vehicles, and pedestrians across Dry Creek. The replacement bridge will meet current applicable County, America Association of State Highway and Transportation Officials, and Caltrans design standards. The proposed new bridge is a continuous three-span, post-tensioned concrete box girder bridge. The spans are 72 feet, 96 feet, and 72 feet respectively. It will have two, twelve-foot travel lanes and two, four-foot shoulders and provide a clear width between barrier rails of 34 feet. A vehicular railing will be attached to the edge of deck of the new structure. The piers supporting the intermediate spans will be two, four-foot diameter columns pinned at their bases with end spans supported by seat type abutments with wingwalls protected by rock slope protection. Abutments 1 and 4 (the end supports) will be founded on spread footing foundations, both embedded and doweled into intact rock at each support. The new bridge will require a realignment of the roadway, which will correct the existing substandard curves on roadway approaches to the bridge. The vertical profile of the new bridge will be raised slightly to provide sufficient water conveyance beneath the bridge during flood events. This will also require a slight rise in the approach roadway elevation, which will gradually decrease until the realigned roadway conforms to the existing roadway elevations. Once the new bridge has been constructed, the existing bridge would be demolished. Preservation and maintenance of the bridge is not possible due to the presence of hazardous lead paint throughout the structure, the non-standard design components, substandard curves, unprotected pedestrian access, and on-going timber and steel maintenance issues. Acquisition of permanent right-of-way is anticipated for this Project. Since the proposed alignment is shifting the new bridge to the east along with new approach alignments, Yuba County will no longer need right-of-way a portion of the existing right-of-way along the existing alignment, which can be given to CDFW for use in the Spenceville Wildlife Area. Project Purpose The purpose of the Project is to replace the structurally deficient bridge in order to: • Enhance safety by providing a crossing sufficient for both pedestrian and vehicular use, including emergency vehicles; and • Provide a transportation facility consistent with County and Caltrans Standards, as well as local and regional plans. Project Need The existing bridge is currently classified as structurally deficient, with a sufficiency rating of 9.3. A new bridge is necessary to meet current design and safety standards which can safely convey vehicles, including emergency response vehicles, and pedestrians across Dry Creek. Full replacement of the bridge is needed because the current structures do not meet structural design standards, which include substandard curves on both bridge roadway approaches and insufficient width to safely provide crossing by both vehicular and pedestrian users. No Build Alternative Under the No Build alternative, the existing bridge would not be rehabilitated or replaced. The existing bridge would continue to be classified as structurally deficient. This would result in continued deterioration of the bridge which would likely result in an adverse effect/significant impact under both Section 106 of the National Historic Preservation Act and CEQA. Further, the bridge would continue to have hazardous lead paint and fail to meet current applicable County, America Association of State Highway and Transportation Officials, and Caltrans design standards.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details