Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Wisconsin was posted on March 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WALKING IRON TRAIL

Closed
State & Local
Submission Closed
Solicitation #
326012

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Federal
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The scope of work is extensive, covering site preparation, construction, and infrastructure activities. Key services requested include land surveying, site photography, quality control, site security, traffic control, subsurface investigation, and site clearing. Construction requirements encompass tunneling, boring, jacking, micro tunneling, cathodic protection, steel casing, manhole material, asphalt paving, traffic signs and signals, lighting, landscaping, ready mix supply, precast concrete, concrete drilling, saw cutting, and welding services. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100% of their contract value, with Kiewit agreeing to reimburse bond premiums. Additionally, Kiewit will prioritize bidders who can demonstrate an ability to maintain labor harmony on the project. The response deadline is December 16, 2026, and invitations to bid are managed through the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

36 minutes ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The contract involves the development of the Walking Iron Trail, a segment of a longer trail system designed to connect eventually with Devil’s Lake State Park. This project includes a newly reconstructed main bridge spanning the Wisconsin River, replacing a previously demolished structure, and repurposing a secondary bridge originally built in 1911. The secondary bridge, located in Dane County, will be adapted for trail use while preserving its historic character. The trail itself follows a former railroad right-of-way and links directly to the Great Sauk Trail in Sauk County, enhancing regional connectivity for recreational use. Vendors responding to this solicitation must carefully consider access limitations and complete the work within the established timeline. The solicitation is managed by the Public Works Engineering office of Dane County, Wisconsin, with bids due by April 20, 2026. The contract encourages bidders to thoroughly review site conditions and develop proposals that meet the project’s goals and specifications. Key contacts include the Project Manager Reed Rodenkirch and Engineering Clerk Mindy Diaz. The project emphasizes preserving historic elements, efficient construction within constraints, and providing a seamless trail experience that builds on existing regional infrastructure.

General Info

Develop Walking Iron Trail with bridge reconstruction, historic preservation, connecting Devil’s Lake Park by April 2026.

Place of Performance

WI, USA

Set-Aside

discretionary

Documents

3
PDF, High priority: read this firstdrawings
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstrfb
High

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 4 days
  • North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 19 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWisconsin → Public Works Engineering
Contacts2 people available
OfficeMadison, WI, 53703, USA

Interested Companies (21)

Builders Exchange of WI
Concrete StructuresJanesville, WI
Custom ManufacturingClinton, WI

See All 21 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
This project is part of longer trail system expected to eventually connect to Devil's Lake State Park. After crossing the Wisconsin River (GST-WIT WI River Recreational Bridge Phase 1 Walking Iron Trail) it connects directly to the Great Sauk Trail (Sauk County). The original right-of-way for the trail under this project was utilized by the railroad. The bridge over the main span of the Wisconsin River has been newly reconstructed (it was demolished previously) while the bridge across the secondary channel of the Wisconsin River (Bridge BE B428E) in Dane County is repurposed for the trail utilizing the original circa 1911 historic structures. Key considerations for vendors include understanding the site specific constraints regarding access and a need for completing the work within the designated timeline. The County encourages all bidders to review the site conditions carefully and propose solutions that align with the project goals, within the scope and specifications provided.

More opportunities from Wisconsin → Public Works Engineering

Same awarding agency

NAICS: 541330
SLED
Consultant Services for On-Call and Capital Improvement Projects for the Dane County Regional Airport
Solicitation # 326021
The Dane County Department of Public Works Engineering is seeking qualified firms to provide professional consultant services for the Dane County Regional Airport (MSN). The scope is divided into two primary functional areas: the design and construction administration of major capital improvement projects and the provision of on-call professional services. Key capital projects include the rehabilitation of Runways 18/36 and 14/32, a proposed extension of Runway 3/21 coordinated with the realignment of US Highway 51, the expansion of the West Ramp to increase aircraft parking capacity, and miscellaneous airfield improvements. Additionally, the project encompasses the expansion of the cellphone lot parking, which must integrate PFAS mitigation measures, and safety improvements at the Darwin Road and International Lane intersection. On-call services will cover a broad range of needs, including feasibility studies, facility assessments, environmental support, and emergency response. All work must comply with FAA Advisory Circulars, including AC 150/5100-14E and AC 150/5300-13, and is subject to federal requirements such as the Davis-Bacon Act, Title VI Civil Rights, and FAA Buy American Preferences. This solicitation is not set aside for any specific business category. Interested firms must submit a Statement of Qualifications (SOQ) electronically via the County's eProcurement Portal and provide up to seven hard copies by December 21, 2026. Selection will be based on the identification of the most qualified firm, with detailed scopes and deliverables finalized during contract negotiations.
Engineering Services

POSTED

18 days ago

DEADLINE

in 24 days
View Details
NAICS: 238220
SLED
Consolidated Food Service Exhaust Fan Replacements
Solicitation # 326018
The County of Dane has issued Request for Bids (RFB) 326018 for the replacement of six roof-mounted exhaust fans at the Consolidated Food Service facility in Verona, Wisconsin. This lump sum construction project involves HVAC and electrical work, including the installation of new fans and associated variable frequency drives (VFDs) with integral disconnects. An optional alternate bid is available for the cleaning of existing exhaust ductwork and kitchen hoods. The project is scheduled to begin on February 1, 2027, with substantial completion required by May 31, 2027. Because the facility remains operational during construction, contractors must carefully coordinate shutdowns, access, staging, and sequencing with the county to minimize disruptions to food service operations. Bidders must be pre-qualified as Best Value Contractors (BVC) and demonstrate experience completing at least one similar project of at least 50 percent of the size or value of the work being bid. The contract will be awarded to the responsible bidder offering the lowest dollar amount on the base bid. A key requirement is a ten percent Emerging Small Business (ESB) participation goal, and bidders must submit an ESB Report within ten business days of the bid due date to avoid being deemed unresponsive. Bids are due by December 9, 2026, and must include a bid guarantee of 5 percent of the total bid price. Payment is processed monthly via AIA G702 and G703 forms, with a 5 percent retainage held until final completion.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

21 days ago

DEADLINE

in 12 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS