Walter Kelley River Access

Closed
73866State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 14 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The Town of Middlesex, Vermont, is seeking to develop a formal river access point at Walter Kelley Park, a five-acre public space located at the confluence of the Winooski and Mad Rivers, to replace lost access sites and mitigate environmental degradation caused by informal trails to the river. The project aims to construct stairs and ramps to provide safe, universal access to the water for fishing, canoe portage, and recreational use, while simultaneously reducing erosion, limiting invasive knotweed spread, and preventing contamination from human activity along the riverbank. The Winooski River, known for its slow flow and suitability for recreational use, currently lacks a regulated access point after the destruction of the prior Shady Rill site in the July 2024 floods and the permanent inaccessibility of another FEMA-buyout property. The Walter Kelley Park site was chosen as the only viable alternative for maintaining public river access for Middlesex residents. The project will be implemented through a contract with a not-to-exceed budget of $145,000, funded by the Winooski Natural Resources Conservation District with support from the Lake Champlain Basin Program, with payments contingent upon phase completion and approval by WNRCD staff. All work must align with final designs available via the WNRCD website and adhere to green infrastructure principles, including the use of Vermont Conservation seed mix and straw mulch for stabilized areas. The contract requires strict compliance with federal and state regulations, including the Solid Waste Disposal Act, Americans with Disabilities Act, fair employment statutes, and prohibitions on hydrofluorocarbons in materials. Contractors must be registered, not debarred, in good tax standing with Vermont, and carry adequate insurance, including workers’ compensation and liability coverage, with a Certificate of Insurance and W-9 required before contract execution. A mandatory site visit on June 29, 2026, is required for bid eligibility, and proposals must be submitted electronically via email by July 17, 2026, using the official bid sheet provided. All records related to performance will be subject to audit for three years following contract completion, and all deliverables—including engineered design confirmation and post-construction photos—are required for payment and acceptance. The State retains the right to cancel the agreement if appropriations expire or federal funding is withdrawn, and all information is subject to Vermont’s Public Records Act.

General Info

Middlesex plans formal, accessible river access at Walter Kelley Park to prevent erosion by 2026.

Documents

1

RFP Enos and Partridge Hill Road Improvements Construction

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA

Full Description

Show more
The approximately five-acre Walter Kelley Park was established in 2009 in conjunction with the adjacent main station of the Middlesex Fire Department. The Park was established for public use, with the intention that it would host a river access. While users of the Park often access the adjacent Winooski River for recreation, there does not currently exist a formal river access point and recreational users blaze trails down the hill to the river as needed, at times disturbing the bank and contributing to erosion. The land around the Walter Kelley Park is best described as rural. The Park sits at the confluence of the Winooski and Mad Rivers, granting access to both rivers. The Winooski River forms the western border of the Park, and to some extent also the southern border of the Park. The river is slow-flowing, ideal for canoe portage, fishing, and sitting on the beach. The Town desires a location for the local fishing derby. The river adjacent to the Park is reasonably stable. To the north, the Park borders an undeveloped parcel with some scrubby vegetation. To the east, the Park borders a small industrial park including several businesses and the main station of the Middlesex Town Fire Department. Walter Kelley Park was selected as the location because the town does not have a good, formal river access point. The Town of Middlesex gained a riverfront property near the Three Mile Bridge through a FEMA buyout, but this site can never be developed. Middlesex had a river access point at Shady Rill (built through collaboration with WNRCD) that was destroyed in the July 2024 flooding, but the State has determined that the site will not be restored. The Walter Kelley Park would be the only good river access for the residents of Middlesex. The proposed project will focus on infrastructure improvements to the access area and reducing environmental impacts on the shoreline of the Winooski River. Infrastructure improvements include stairs/ramps for access to the water for fishing and as a boat launch/portage. The stairs/ramp will provide the co-benefit of creating a universally accessible river access and reducing environmental impacts on the area by keeping residents off riverbanks when launching canoes or fishing. This project intends to limit soil disturbance, reduce riverbank erosion, maintain a low invasive knotweed presence, and reduce the spread of harmful aquatic species.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

New
SLED
Creation and Analysis of a Statistically Valid Survey and Focus Group Facilitation for the Renewal of Comcast’s CPG
Solicitation # 77255
The Vermont Department of Public Service is soliciting proposals from qualified professionals and firms to provide community surveying, data analysis, and stakeholder engagement services. This effort supports the review of Comcast's petition to renew its Certificate of Public Good for cable television services in Vermont, specifically under Commission Case No. 25-1216-PET. The selected contractor will be responsible for developing and administering statistically valid surveys meeting Commission Rule 8.231, facilitating regional in-person or hybrid focus groups, and preparing interim and final reports. Additionally, the contractor may be required to provide written and verbal testimony during Public Utility Commission hearings. The period of performance is scheduled from January 7, 2027, to January 7, 2029, with the possibility of two additional twelve-month renewals. Evaluation criteria focus on qualifications, experience with cable television topics, cost reasonableness, and the ability to foster equitable community engagement. Bidders must comply with ADA and WCAG 2.1 AA accessibility standards and provide certifications regarding climate change for bids exceeding 25,000 dollars and lobbying for contracts over 100,000 dollars. Proposals must be submitted as a single searchable PDF to the designated point of contact by November 30, 2026. Payment is structured on a Net 30 basis upon the completion of specific milestones.

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details
New
SLED
Cognitive Behavioral Risk Interventionist - NSCF
Solicitation # 77254
The State of Vermont Department of Corrections is seeking one or more licensed providers to deliver Cognitive Behavioral Risk Reduction services at the Northern State Correctional Facility in Newport, Vermont. These services target incarcerated individuals assessed with a moderate to high risk of reoffending, utilizing the evidence-based Risk-Needs-Responsivity (R-N-R) Model. The scope of work requires a commitment of 40 hours per week, consisting of approximately 10 to 12 ninety-minute group sessions weekly, with services provided for at least 48 weeks per calendar year. The contract is for an initial two-year term starting in December 2026, with options to renew for up to three additional twelve-month periods. Proposals are evaluated based on a 50-point scale focusing on the ability to deliver department-provided curriculum, professional instructor experience, experience with incarcerated populations, consistent work performance, and familiarity with manualized curriculum. Preference is given to Vermont resident bidders and those promoting clean energy and climate change initiatives. Selected contractors must complete mandatory training in ADA, FERPA, PREA, HIPAA, and Criminal Justice Information Systems within 90 days of starting services. Bids must be submitted as a single searchable PDF to the designated point of contact by the November 2, 2026 deadline and must include a cover letter, price schedule, and a signed Certificate of Compliance.

POSTED

about 16 hours ago

DEADLINE

in 6 days
View Details
NAICS: 541330
New
SLED
Windham Bank Stabilization #CA0901
Solicitation # CA0901
The Town of Windham, Vermont, is soliciting proposals under solicitation number CA0901 for professional engineering services to design and implement bank stabilization upgrades along West Windham Road where it abuts Cobb Brook. The project covers approximately 10,000 square feet, measuring 225 feet in length and 45 feet in height, to address severe erosion and roadway undermining. The selected consultant will be responsible for the full project lifecycle, from the development of conceptual plans and topographic surveys to the creation of final contract plans, specifications, and estimates. All work must adhere to the VTrans Municipal Assistance Section process, including the MAS Guidebook for Municipally Managed Projects and the VTrans 2024 Standard Specifications for Construction. Proposals must be submitted electronically to Mike McConnell by November 30, 2026, and must be divided into two separate files: a technical proposal and a cost proposal. The technical proposal is limited to 15 pages for the primary sections and must include a detailed scope of work, a list of committed personnel, a proposed project schedule, and evidence of success on similar projects. Award recommendations will be made by a five-member selection committee to the Town Selectboard and the MAS Project Supervisor. Key requirements for the awarded firm include obtaining insurance per VTrans specifications, providing a written work zone safety assessment, and securing utility and railroad clearances. While a specific period of performance is not mandated, the RFP notes that Federal Aid projects typically require at least four years from grant award to construction completion.
Engineering Services

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS