This Solicitation opportunity from Pennsylvania was posted on May 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves comprehensive work to upgrade the pedestrian infrastructure at Warminster Community Park, located in Bucks County, Pennsylvania. It encompasses removing and reconstructing existing walking paths, installing a drainage swale to manage water runoff, and stabilizing the area through seeding as detailed in the project drawings and specifications. Additionally, the project requires milling a designated trail section down to the subbase layer, followed by proper hauling and disposal of the millings to ensure a sustainable and durable surface. The scope emphasizes both the reconstruction and enhancement of the trail system to improve accessibility and drainage.
The project is solicited under the PennBid platform with a solicitation number of 187263, posted on May 20, 2025, with a response deadline of June 5, 2025. The contract is estimated to be valued between $100,000 and $500,000 and is managed by Warminster Township within Pennsylvania. The work is categorized under NAICS code 237310, which pertains to highway, street, and bridge construction, indicating the project's focus on infrastructure development and repair. Interested contractors can find additional details and submit responses through the provided online link.
PDF, High priority: read this firstsubmission-instructions
HighAI Summary for 00 21 13.1 Instructions for Electronic Bidding: This document provides detailed instructions for bidders on how to use the PennBid electronic bid management system to respond to the solicitation. It outlines the registration process, document downloading, communication via the portal, and the specific steps for submitting and finalizing electronic bids. Additionally, it lists the mandatory documents required for submission, including the Bid Form, Bid Bond, and various certifications, and specifies that the three lowest bidders must submit original signed copies within three business days of the bid opening.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Certificate of Insurance - Warminster Community Park Trail Paving: Document 00 62 16 specifies the insurance requirements for the Warminster Community Park Trail Paving project (Contract 2025-03). It identifies required additional insureds, including Warminster Township and Gilmore & Associates, Inc., and refers to Document 00 73 00 for specific coverage and limit requirements.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for CN 2025-03 Warminster Community Park Trail Paving Agreement: This is a formal agreement between the Township of Warminster (Owner) and a Contractor for the reconstruction of existing asphalt trails at Warminster Community Park. The document outlines the scope of work, designates Gilmore & Associates, Inc. as the Engineer, and establishes a performance timeline from June 1, 2025, to September 5, 2025. It includes critical terms such as liquidated damages of $500.00 per day for delays, unit price payment structures, retainage percentages, and interest rates for overdue payments.
PDF
PDF, High priority: read this firstbidder-qualification
HighAI Summary for CN #2025-03: Warminster Community Park Trail Paving - Bidder Qualification Statement: A mandatory Bidder Qualification Statement for project CN #2025-03: Warminster Community Park Trail Paving. The document requires bidders to provide organizational background, work history, contractor responsibility certifications, references, and financial statements to determine the bidder's qualifications and eligibility.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for CN #2025-03 Warminster Township Community Park Trail Paving - Addendum #1: Addendum #1 dated May 30, 2025, for the Warminster Township Community Park Trail Paving project. It revises the Bid Form to include an alternate line item for the disposal of excavated soils and updates Document 01 22 00 regarding measurement and payment, specifying that excavated soil is to be assumed as clean fill.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for Document 00 41 00 - Bid Form: A placeholder document for the Bid Form, directing users to the PennBid website (www.pennbid.bonfirehub.com) to locate the actual form under the 'Bids' tab for the specific contract.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Document 00 73 00 - Supplementary Conditions: This document contains the Supplementary Conditions for a construction contract, amending and supplementing the EJCDC No. C-700 (2007 Edition) General Conditions. It defines key terms, establishes contract commencement times, outlines the schedule of values, and specifies requirements for contract documents, subsurface conditions, and project manuals. It also references various Pennsylvania state laws and Warminster Township ordinances regarding prevailing wages and contractor responsibility.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Document 00 91 13 - Addenda: This document serves as a placeholder or instructional page regarding the issuance and availability of addenda for the bidding process, noting that updates will be posted on the PennBid website.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Instructions to Bidders - Document 00 21 13: This document provides detailed instructions to bidders for a construction procurement. It outlines the rules for bid preparation, submission, and evaluation, including bidder qualifications, site examination requirements, bid security, and the process for awarding the contract to the lowest responsive and responsible bidder.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for List of Drawings - Trail Paving Location Map: A technical document listing the project drawings, specifically identifying the Trail Paving Location Map as part of the project sheets.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01 11 13 - Summary of Work: This document provides the Summary of Work for a construction project involving the removal and reconstruction of pedestrian walking paths, installation of a drainage swale, and milling of trail sections at Warminster Community Park. It outlines contractor responsibilities, site usage constraints, safety compliance with OSHA and PENNDOT Publication 213, and specific municipality requirements for working hours and traffic control.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 22 00 - Measurement and Payment: This technical specification document outlines the measurement and payment criteria for a unit price payment method related to asphalt path reconstruction. It provides detailed measurement and payment instructions for specific items including full depth asphalt removal, 1.5 inch milling, geotextile fabric, 2A stone subbase, Superpave WMA base and wearing courses, grading, and soil disposal.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 22 00 - Measurement and Payment: This technical specification document outlines the measurement and payment criteria for various construction activities, including asphalt path removal, milling, geotextile fabric installation, stone subbase, Superpave WMA base and wearing courses, and grading. It defines the units of measurement (e.g., square yards, lump sum, tons) and specifies that payment constitutes full compensation for labor, materials, equipment, and traffic protection.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 29 00 - Contract Considerations: This technical specification section outlines the administrative requirements for contract management, including the submission of the Schedule of Values, monthly application for payment procedures, and detailed change order processes (stipulated price, unit price, work change directives, and time and material changes).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 31 00 - Coordination and Meetings: Technical specification section 01 31 00 detailing requirements for project coordination, field engineering, and the administration of preconstruction and progress meetings. It defines the responsibilities of the Contractor and Owner regarding survey control, meeting agendas, and the distribution of meeting minutes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 32 16 - Narrative Construction Schedule: Technical specification section 01 32 16 detailing the requirements for the preparation, maintenance, and revision of the construction project schedule. It outlines submission requirements for the initial schedule, including activity descriptions, durations, and calendar dates, and notes that progress payments may be withheld until an acceptable schedule is submitted and approved.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 33 00 - Submittals: This technical specification section outlines the requirements and procedures for project submittals, including construction progress schedules, product data, shop drawings, certificates, and manufacturer's reports. It defines the transmittal process, review timelines, and specific documentation required for project closeout.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 40 00 - Quality Control: Technical specification section 01 40 00 detailing quality control requirements for installation, including tolerances, reference standards, testing laboratory services, observation services, and manufacturers' field services. It outlines the contractor's responsibilities for quality assurance, examination of site conditions, and substrate preparation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 50 00 - Construction Facilities and Temporary Controls: Technical specification section 01 50 00 detailing requirements for construction facilities and temporary controls. It covers temporary utilities, sanitary facilities, site barriers, fencing, water and dust control, security, and progress cleaning responsibilities for the contractor.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 55 26 - Traffic Regulation: Technical specifications detailing the contractor's obligations for traffic control and regulation. It covers the implementation of traffic control plans, notification requirements for emergency services, flag person requirements, haul routes, and specific compliance mandates for the Township of Warminster and PennDOT Publication 213.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 57 13 - Soil Erosion and Sediment Control: Technical specifications for soil erosion and sediment control, detailing requirements for the implementation of erosion plans, materials such as silt fences and coarse aggregate, and execution procedures for sewage pump stations and utility construction. It mandates compliance with PADEP and PennDOT Publication 408 standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 60 00 - Material and Equipment: Technical specification section 01 60 00 detailing requirements for the procurement, transportation, handling, storage, and protection of materials and equipment. It outlines the protocols for product options and the formal procedure for requesting substitutions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 70 00 - Contract Closeout: Technical specifications detailing the requirements for contract closeout, including final cleaning, adjusting, project record documents, and the submission of final applications for payment and payroll certifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 20 00 - Earthwork: Technical specifications for earthwork, including site grading, topsoil removal, excavation, and backfill. The document details quality assurance standards (PennDOT and ASTM), submittal requirements for soil testing, material specifications for topsoil and aggregates, and execution procedures for site structures and pavements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 23 33 - Excavation, Backfill and Compaction: Technical specifications for excavation, backfill, and compaction associated with utility construction and structure installation. The document details quality assurance requirements, ASTM and PennDOT reference standards, compaction density targets, pipe bedding materials, and execution procedures for traffic control and pavement cutting.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 01 16.71 - Milling: Technical specifications for the milling of existing asphalt pavement surfaces. The document outlines quality assurance standards based on PennDOT Publication 408, equipment requirements for grade and slope control, execution procedures for milling operations, and requirements for the disposal of milled materials.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 05 19.13 - Geotextile: Technical specifications for the furnishing and installation of geotextiles used as permeable separators. The document details material requirements (polymeric filaments), shipping and storage constraints, site preparation, and placement procedures, including a minimum 6-inch overlap requirement.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 12 00 - Asphalt Paving: Technical specifications for asphalt paving of roadways, parking areas, and walking paths. The document outlines quality assurance standards (PennDOT Publication 408), material requirements for base, wearing, and binder courses, and detailed execution instructions including subbase preparation, placement, and flatness tolerances.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 92 00 - Finish Grading, Seeding, and Sodding: Technical specifications for finish grading, seeding, and sodding. The document details requirements for topsoil quality, fertilizer and lime formulations, seed mixtures, and sod installation. It includes quality assurance standards (PennDOT Publication 408), submittal requirements, and execution guidelines for subgrade preparation and topsoil placement.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Standard General Conditions of the Construction Contract: This document contains the EJCDC Standard General Conditions of the Construction Contract (Copyright 2007). It establishes the legal and operational framework for a construction project, including definitions, contractor and owner responsibilities, payment terms, change orders, dispute resolution, and termination procedures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Trail Exhibit - Full Depth Asphalt Paving Detail: Technical exhibit providing general notes and specifications for trail excavation, erosion control, path restoration, and grading requirements for full depth asphalt paving.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for Warminster Community Park Trail Paving - Bidder's Acknowledgement Form: This document is the Bidder's Acknowledgement Form for the Warminster Community Park Trail Paving project (Contract CN 2025-03). It outlines the bidder's agreement to the contract terms, representations regarding site visits and document review, certifications against collusive practices, and acknowledgments regarding unit pricing and completion timelines.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Warminster Community Park Trail Paving Contract 2025-03 Table of Contents: Table of Contents for the Warminster Community Park Trail Paving Contract 2025-03 (G&A File No. 25-00117). The document outlines the procurement and contracting requirements, including bid forms, bonds, general conditions, prevailing wage determinations, and technical specifications for earthwork and asphalt paving.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Warminster Community Park Trail Paving Project - Advertisement for Bids (CN 25-03): An invitation for sealed bids for Contract 2025-03 regarding the reconstruction of asphalt trails at Warminster Community Park. Bids are due by 1:00 P.M. on June 5, 2025, via PennBid. The project is subject to the Pennsylvania Prevailing Wage Act and the Township's Responsible Contractor Ordinance. Work is scheduled between June 1, 2025, and September 5, 2025.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Warminster Community Park Trail Paving Project Manual (Contract No. 2025-03): Project manual for Contract No. 2025-03 regarding the Warminster Community Park Trail Paving project for Warminster Township, PA. Prepared by Gilmore & Associates, Inc. in May 2025.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Warminster Community Park Trail Paving Project - Prevailing Wages Determination: Prevailing wage rate determination for the Warminster Community Park Trail Paving Project (Serial No. 25-04628) in Bucks County, PA. Issued by the Bureau of Labor Law Compliance with a determination date of 4/29/2025 and a contract award date of 6/5/2025. The document lists hourly rates and fringe benefits for various labor classifications including carpenters, electricians, and iron workers.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Warminster Township Community Park Trail Paving - Addendum #1: Addendum #1 dated May 30, 2025, for CN #2025-03. It revises the Bid Form to include an alternate line item for the disposal of excavated soils and updates Document 01 22 00 regarding measurement and payment, specifying that excavated soil should be assumed as clean fill.
PDF
PDF, High priority: read this firstspecial-notice
HighAI Summary for Warminster Township Ordinance 729 - Responsible Contractor Requirements: Appendix C contains Ordinance 729 of Warminster Township, Bucks County, PA. This ordinance repeals Ordinance 680 and establishes the 'Responsible Contractor Requirements' for public facility or public works projects valued over $350,000. It mandates that prime contractors submit a Contractor Responsibility Certification at the time of bidding, attesting to legal compliance, bonding, lack of debarment, OSHA training, and participation in Class A Apprenticeship Programs.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Warminster Township Ordinance 767 - Responsible Contractor Requirements Amendment: An amendment to Ordinance 729 (Chapter 4, Part 1) of the Warminster Township Code. It lowers the project value threshold for responsible contractor requirements to $175,000, establishes an annual CPI-U adjustment for that threshold, mandates OSHA training for craft labor, and requires that at least 70% of craft labor be comprised of journeypersons or registered apprentices.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Warminster Township Ordinance 773 Responsible Contractor Requirements Amendment: This document is Ordinance 773 of Warminster Township, Bucks County, Pennsylvania, which amends the Responsible Contractor Ordinance (Chapter 4, Part 1 of the Code). The amendment updates project value thresholds and expands requirements for responsible contractors, specifically detailing wage and fringe benefit requirements for craft employees and those performing custom fabrication work for public works projects. It was enacted in 2024.
XLSX
XLSX, High priority: read this firstbid-tabulation
HighAI Summary for WCP Path Paving Bid Table (BT-49LY): A bid tabulation spreadsheet for WCP Path Paving (BT-49LY) comparing unit prices and total costs from three vendors: James D. Morrissey, Inc., James R Kenney Excavating & Paving Inc., and T. Schiefer Contractors, Inc. The document includes a main bid and three alternates covering path removal, subgrade cuts, stone subbase, and paving courses.
PDF
PDF, Low prioritysurety-agreement
LowAI Summary for Agreement of Surety Company - Warminster Community Park Trail Paving: A legal agreement form from a Surety Company committing to provide Performance and Payment Bonds (100% of contract amount) to the Township of Warminster for Contract #2025-03: Warminster Community Park Trail Paving, contingent upon the award to the bidder.
PDF
PDF, Low priorityverification-form
LowAI Summary for Appendix B - Public Works Employment Verification Form: A Commonwealth of Pennsylvania Public Works Employment Verification Form used by contractors and subcontractors to affirm compliance with the Public Works Employment Verification Act via the federal E-Verify Program (EVP).
PDF
PDF, Low priorityother
LowAI Summary for Consent of Surety to Final Payment - Warminster Community Park Trail Paving: A legal template for the 'Consent of Surety to Final Payment' regarding Contract 2025-03 for the Warminster Community Park Trail Paving project. The document serves as a formal agreement where the surety company approves final payment to the contractor, confirming that labor and material claims have been settled while maintaining the surety's obligations to Warminster Township.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Contractor's Affidavit - Warminster Community Park Trail Paving: A legal affidavit template for Contract 2025-03 (Warminster Community Park Trail Paving) used by the contractor to swear that all labor, materials, and claims related to the work and approved change orders have been paid in full.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Contractor's Release of Liens - Warminster Community Park Trail Paving: A legal release of liens form for Contract 2025-03 (Warminster Community Park Trail Paving). The document serves as a formal discharge of claims and demands by the contractor against Warminster Township upon receipt of final payment.
PDF
PDF, Low prioritybid-bond
LowAI Summary for Document 00 43 13 Bid Bond - Warminster Township: A standard bid bond form for Warminster Township, PA. The document outlines the legal obligations of the Bidder and Surety to pay a penal sum to the Owner upon default of the Bidder, including terms for voiding the obligation and requirements for legal action in Bucks County or the Eastern District of Pennsylvania.
PDF
PDF, Low prioritymaintenance-bond
LowAI Summary for Maintenance Bond - Contract 2025-03: Warminster Community Park Trail Paving: A legal bond template for Contract 2025-03 (Warminster Community Park Trail Paving) requiring the Principal and Surety to guarantee the repair of defects in materials or workmanship for a period of 18 months after final completion, with a bond value of 15% of the completed contract price.
PDF
PDF, Low prioritynon-collusion-affidavit
LowAI Summary for Non-Collusion Affidavit - Warminster Community Park Trail Paving (CN 2025-03): A legal affidavit for the Warminster Community Park Trail Paving project (Contract No. CN 2025-03) requiring the bidder to swear that they have not engaged in collusion or restraint of free, competitive bidding, and that they have not been convicted of conspiracy or collusion regarding public contracts within the last three years.
PDF
PDF, Low prioritypayment-bond
LowAI Summary for Payment Bond - Warminster Township: A standard payment bond form for a contract with Warminster Township. The document outlines the obligations of the Contractor and Surety to ensure payment for labor, materials, and equipment provided by claimants, including claim procedures, notice requirements, and legal definitions.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyPennsylvania → Warminster Township, Bucks County, PA
The Work to be done under this contract consists of all labor, equipment and materials to remove and
reconstruct the existing pedestrian walking paths, install a drainage swale, seed and stabilize as shown
on the Drawings and described in the Specifications. The work also includes milling one of the
designated trail sections to the subbase and proper hauling and disposal of millings.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award