This Solicitation opportunity from Pennsylvania was posted on May 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
This contract involves comprehensive stormwater management maintenance work at seven locations within Warminster Township, Pennsylvania. The scope includes replacing box culverts of various sizes, installing new corrugated plastic pipes of 42-inch and 72-inch diameters, streambank restoration, and the installation of concrete wing walls, endwalls, manholes, inlets, and cofferdams. Additionally, there will be site modifications such as relocating a shed and restoring affected areas including roadways, sidewalks, curbs, riparian buffers, and lawns. The work will be carried out within township easements and rights-of-way, requiring coordination with existing infrastructure and environmental features.
The project is titled the Warminster Municipal Authority: Stormwater Improvements Project, with a solicitation posted on May 21, 2025, and a response deadline of June 4, 2025. The contract is estimated to be valued between one million and three million dollars and is open to qualified organizations under the Small, Local, and Emerging Business (SLED) program. The work aims to improve stormwater infrastructure, mitigate flooding issues, and enhance environmental and roadway conditions across the specified locations. Interested parties can find additional details and submit responses through the provided online portal.
PDF, High priority: read this firstsubmission-instructions
HighAI Summary for 00 21 13.1 - Instructions for Electronic Bidding: This document provides detailed instructions for bidders on how to use the PennBid electronic bid management system to respond to a Request-for-Quotation. It outlines the process for registering, downloading documents, communicating with the project owner, and submitting/updating electronic bids. Crucially, it lists the required submission documents, including the PennBid Bid Form, Bid Bond, Bidder's Acknowledgement, Qualification Statement, Non-Collusion Affidavit, and various certifications.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for 00 45 13 - Bidder Qualification Statement: A Bidder Qualification Statement form requiring contractors to provide organizational structure, subcontractor usage, five-year work history of similar projects, default history, principal experience, financial statements, and a notarized certification of accuracy.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 23-Doc 00 72 00 - Standard General Conditions of the Construction Contract: This document contains the Standard General Conditions of the Construction Contract prepared by the Engineers Joint Contract Documents Committee (EJCDC). It establishes the legal and operational framework for a construction project, including definitions, contractor and owner responsibilities, payment terms, dispute resolution, and insurance requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 27-ManorDr Plan Set 2025-05-16: Technical specifications and installation details for concrete sidewalk construction and hydrogeological stabilization, dated May 16, 2025. The document includes specific requirements for concrete curb rails, expansion/control joints, and excavation/stabilization methods for bank repair.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 28-PBWAM006 Full Plan Set: Technical plan set and specifications for project 28-PBWAM006, including general project notes, a standard utility legend, coordinate system data (NAD-1983/2011), and erosion and sedimentation control standard notes. The document includes survey data completed on October 26, 2023, by Remington & Verwyn.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 52-Sec 03 30 00 - CIP Concrete: Technical specifications for cast-in-place (CIP) concrete, covering formwork, reinforcement, materials, mix design, and placement procedures. It includes detailed requirements for submittals, quality assurance, ASTM standards for steel and cement, and specific product requirements for form-facing materials and admixtures.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for CN #2025-06 Stormwater Improvements Project - Addendum #1: Addendum #1 dated May 30, 2025, for the Warminster Township Stormwater Improvements Project. It provides clarifications regarding fencing specifications (timber guiderail for Laurel Avenue and split rail for other locations), references new uploaded documents (32 31 29 and 34 71 13.27), and specifies that shop drawings for culverts at Acorn Drive and Laurel Avenue are included in the payment for concrete box culvert installation.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for CN #2025-06 Stormwater Improvements Project - Addendum #1: Addendum #1 dated May 30, 2025, for the Warminster Township Stormwater Improvements Project (CN #2025-06). It clarifies fencing specifications, specifically designating timber guiderail for Laurel Avenue and 3-rail split rail for other locations. It also specifies that the contractor must provide shop drawings for culverts at Acorn Drive and Laurel Avenue, with payment included in the concrete box culvert installation item.
PDF
PDF, High priority: read this firstbidder-acknowledgement
HighAI Summary for CN 2025-06: Stormwater Improvements Project - Bidder's Acknowledgement Form: Bidder's Acknowledgement Form (Document 00 45 10) for the Stormwater Improvements Project (CN 2025-06). This document requires the bidder to certify they have reviewed all bidding documents, visited the site, and agree to the terms, conditions, and completion dates (substantial completion by August 15, 2025). It also lists required submission documents including the PennBid Bid Form, Bid Bond, and Non-Collusion Affidavit.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for CN 2025-26 Stormwater Improvements Project - Supplementary Conditions: This document contains the Supplementary Conditions for the CN 2025-26 Stormwater Improvements Project, amending the EJCDC C-700 (2007 Edition) General Conditions. It defines project-specific terms, commencement times, schedule of values requirements, and contract document compositions. It also includes critical administrative requirements such as insurance limits, Pennsylvania Prevailing Wage Act compliance, and the Public Works Employment Verification Act.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Contract 2025-06: Stormwater Improvements Project: Project manual and advertisement for bids issued by the Warminster Municipal Authority in May 2025 for stormwater management maintenance at seven locations in Warminster Township. The scope includes box culvert replacement, pipe installation, streambank restoration, and site restoration. Bids are due by June 4, 2025, via PennBid, with a required completion date of August 29, 2025. The document includes a table of contents for procurement requirements, technical specifications, and a list of project drawings.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Contract 2025-06: Stormwater Improvements Project - Advertisement for Bids: Advertisement for sealed bids for the Warminster Municipal Authority's Contract 2025-06: Stormwater Improvements Project. The project involves stormwater management maintenance at seven locations in Warminster Township, including culvert and pipe replacement, streambank restoration, and installation of concrete structures. Bids are due by June 4, 2025, via PennBid. Work must be substantially completed by August 15, 2025. A pre-bid meeting is scheduled for May 28, 2025.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Contract 2025-06: Stormwater Improvements Project Agreement: This is a formal agreement between the Warminster Municipal Authority (Owner) and a Contractor for the Stormwater Improvements Project (Contract 2025-06). The scope includes stormwater management maintenance at seven locations in Warminster Township, involving culvert replacement, pipe installation, streambank restoration, and site restoration. The document specifies a substantial completion date of August 15, 2025, and a final completion date of August 29, 2025, with liquidated damages of $500.00 per day for delays. It outlines payment procedures, including a 10% to 5% retainage structure, and identifies Gilmore & Associates, Inc. as the Engineer representing the Owner.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Contract 2025-06: Stormwater Improvements Project - Prevailing Wage Rate Determination: Prevailing wage rate determination for the Stormwater Improvements Project (Contract 2025-06, Serial No. 25-05380) in Warminster Township, Bucks County. Issued by the Bureau of Labor Law Compliance with a determination date of 5/20/2025. The document specifies hourly rates and fringe benefits for various labor classifications, including carpenters, electricians, and iron workers, for work involving pipe replacements and streambank restoration.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract No. 2025-06: Stormwater Improvements Project: Project manual title page for Contract No. 2025-06 (File No. 25-00225) regarding the Stormwater Improvements Project for the Warminster Municipal Authority, dated May 2025 and prepared by Gilmore & Associates, Inc.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Contract No. 2025-06: Stormwater Improvements Project: Project manual and invitation to bid for the Warminster Municipal Authority's Stormwater Improvements Project (Contract 2025-06). The project involves stormwater management maintenance at seven locations in Warminster Township, including culvert replacement, streambank restoration, and pipe installation. Bids are due by June 4, 2025, via PennBid, with a pre-bid meeting scheduled for May 28, 2025. The document includes procurement requirements, technical specifications, and a list of project drawings.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Document 00 21 13 - Instructions to Bidders: This document provides the formal Instructions to Bidders for a procurement project. It outlines the rules and procedures for submitting bids, including defined terms, bidder qualifications, site examination requirements, and the process for bid preparation, submission, and evaluation. It references the use of PennBid for document access and details the responsibilities of the bidder regarding site conditions and regulatory compliance.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Document 00 91 13 - Addenda: This document serves as a placeholder or instructional page regarding the issuance and availability of addenda for the bidding process, noting that updates will be posted on the PennBid website.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Sec 33 42 16.13 Storm Box Culvert Specification: Section 33 42 16.13 provides technical specifications for manufacture, storage, delivery, installation, and assembly of precast reinforced concrete box culvert segments for a storm box culvert. It covers materials, AASHTO design criteria, shop drawing requirements, inspection and quality control, handling and storage, delivery timing, foundation preparation, grouting, placement, backfill, compaction limits, and joint sealing. Parts 2 and 3 are marked TBD, indicating this is a specification/SOW-style document rather than a solicitation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Sec 34 71 13.27 Wood Guard Rail Specification: Section 34 71 13.27 provides technical specifications for wood guard rail/timber guide rail. It includes general requirements, related sections, quality assurance standards, submittals, delivery and handling, product materials, fasteners, and installation instructions. Notes specify pressure-treated wood with water-borne CCA preservative, galvanized hardware compliance, and angled end sections. The document is a construction specification, not a solicitation.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01 11 13 - Summary of Work (Warminster Township Stormwater): This document is a Summary of Work specification for stormwater management maintenance projects at seven locations in Warminster Township. The scope includes replacing box culverts, installing smooth lined corrugated plastic pipes, streambank restoration, and the installation of concrete wing walls, endwalls, and manholes. It outlines contractor responsibilities regarding site use, utility protection per Pennsylvania Act 287, OSHA compliance, and coordination for owner occupancy at Sutcliffe Park.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 22 00 - Measurement and Payment: This technical specification document outlines the measurement and payment criteria for work performed under a unit price payment method. It defines specific measurement methods and payment terms for various items, including lump sum line items, stream cofferdams, pump systems, filter socks, inlet protection, tree protection fencing, stone tire cleaners, concrete encasement of utilities, and piping (SLCPP and RCP).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 22 00 - Measurement and Payment: This document outlines the measurement and payment criteria for work performed under a unit price payment method. It provides specific measurement and payment instructions for various items, including lump sum line items, stream cofferdams, pump systems, filter socks, inlet protection, tree protection fencing, stone tire cleaners, concrete encasement of utilities, and piping (SLCPP and RCP).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 29 00 - Contract Considerations: This technical specification section outlines the administrative requirements for contract management, including the submission of the schedule of values, monthly application for payment procedures, change order processes (stipulated price, unit price, and time and material), and the handling of alternates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 31 00 - Coordination and Meetings: Technical specification section 01 31 00 detailing requirements for project coordination, field engineering, and meeting protocols. It outlines the requirements for preconstruction, progress, and pre-installation meetings, including required attendees and tentative agendas, as well as construction coordination requirements to prevent interference with Owner operations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 32 16 - Narrative Construction Schedule: Technical specification section 01 32 16 detailing the requirements for the preparation, submission, and maintenance of the construction project schedule. It outlines the necessity of a detailed schedule including activity descriptions, durations, and calendar dates, and notes that progress payments may be withheld until an acceptable schedule is submitted and approved.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 33 00 - Submittals: This technical specification section outlines the requirements and procedures for project submittals, including product data, shop drawings, samples, design data, test reports, and certificates. It defines the transmission process to the Engineer, review timelines, and documentation standards for project closeout.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 40 00 - Quality Control: Technical specification section 01 40 00 detailing quality control requirements for installation, including tolerances, reference standards, testing laboratory services, observation services, and manufacturers' field services. It outlines the contractor's responsibilities for quality assurance and the process for examination and preparation of work surfaces.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 50 00 - Construction Facilities and Temporary Controls: Technical specification section 01 50 00 detailing requirements for construction facilities and temporary controls. It covers temporary utilities, sanitary facilities, barriers, fencing, water and dust control, security, and progress cleaning responsibilities for the contractor.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 55 26 - Traffic Regulation: Technical specifications for Section 01 55 26 regarding Traffic Regulation. The document outlines the contractor's obligations for maintaining safe traffic movement, including the implementation of Traffic Control Plans, notification requirements for local authorities (Borough of Conshohocken, police, fire, etc.), parking controls, flag person requirements, and the installation and removal of traffic signs and signals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 56 39 - Landscape Protection: Technical specifications for landscape protection during construction. It outlines requirements for protective fencing, site inspection, root protection, pruning, fertilization, and tunneling for utilities to ensure the survival of plant materials. Reference standards include Pennsylvania Dept. of Transportation Publication 408.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 57 13 - Soil Erosion & Sediment Control: Technical specifications for Soil Erosion and Sediment Control (Section 01 57 13). The document outlines requirements for implementing the Soil Erosion and Sediment Control Plan, adherence to Pennsylvania DEP and PennDOT Publication 408 standards, and detailed instructions for temporary and permanent control measures, including materials like compost socks and coarse aggregate.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 60 00 - Material and Equipment: Technical specification section 01 60 00 detailing requirements for the procurement, transportation, handling, storage, and protection of materials and equipment. It outlines the rules for product options and the formal procedure for requesting substitutions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 70 00 - Contract Closeout: Technical specifications detailing the contract closeout procedures, including final cleaning, adjusting, project record documents, and required documentation for final payment such as payroll certifications and maintenance bonds.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 02 41 16 - Demolition: Technical specifications for demolition work, including requirements for removal procedures, utility disconnection, dust control, asbestos compliance, and site restoration.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 03 30 53 - Concrete-Utilities: Technical specifications for cast-in-place concrete construction associated with utilities, including cradles, encasements, and pavement restoration. The document details quality assurance standards (PennDOT Publication 408, ASTM), submittal requirements, concrete class criteria (Class A, C, and High Early Strength), reinforcement steel standards, and execution procedures for construction and field testing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 11 00 - Clearing: Technical specifications for Section 31 11 00, covering clearing, grubbing, stripping and stockpiling of topsoil, and debris disposal. The document defines work scopes, material requirements for temporary fencing and tree wound dressing, and execution procedures including utility relocations and restoration requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 20 00 - Earthwork: Technical specifications for earthwork, including site grading, topsoil/subsoil removal, building excavation, and backfill. The document outlines quality assurance standards (ASTM, PennDOT), submittal requirements for soil testing, job conditions for utility protection, material requirements for topsoil and fill, and execution procedures for excavation and site structure preparation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 23 16.26 - Rock Removal: Technical specifications for rock removal during excavation, detailing both mechanical and explosive methods. The document outlines quality assurance requirements, including the need for licensed blasting firms and seismic monitoring, regulatory compliance with NFPA 495 and Pennsylvania state laws, and specific execution procedures for excavation and site preparation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 23 33 - Excavation, Backfill and Compaction: Technical specifications for excavation, backfill, and compaction associated with utility construction and structure installation. The document details quality assurance requirements, including PennDOT and ASTM standards, compaction density percentages, pipe bedding materials, and execution procedures for traffic control and protection of existing utilities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 23 33 - Excavation, Backfill and Compaction: Technical specifications for excavation, backfill, and compaction work associated with utility construction and structures. The document details quality assurance standards (PennDOT, ASTM), compaction density requirements, material specifications for pipe bedding and backfill, and execution procedures for traffic control and utility protection.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 25 14.16 - Jute ECB: Technical specifications for the furnishing and installation of biodegradable erosion control blankets (ECB), including jute netting and geotextile fabric. The document details material properties, shipping/storage requirements, topsoil standards, and specific execution procedures for planting zone preparation and anchoring.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 37 16 - Energy Dissipater: Technical specifications for the installation of Rock Energy Dissipaters. The document outlines quality assurance standards based on Pennsylvania Department of Transportation Publication 408 and 72, material requirements for rock and Class 4 Type A geotextile fabric, and execution procedures for installation and restoration.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 31 52 00 - Temporary Sandbag Cofferdam: Specification section 31 52 00 describing the furnishing, placement, maintenance, and removal of a temporary sandbag cofferdam. Includes related sections, approved materials, alternative cofferdam options, installation procedures for side and cross stream conditions, pumping and filtration requirements, removal and restoration requirements, and payment language for replacements due to non-contractor causes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 12 23 - Restoration of Paved Surfaces: Technical specifications for the restoration of paved surfaces, including temporary and permanent paving, asphalt overlay, shoulder and walkway restoration, and curb/gutter repairs. The document mandates compliance with PennDOT Publication 408 and specifies materials such as Superpave base and wearing courses, Class AA concrete, and PG 64S-22 sealant.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 13 13 - Portland Cement Concrete Paving: Technical specifications for Portland Cement Concrete Paving, covering the installation of sidewalks, steps, curbs, driveway aprons, and pads. The document details quality assurance standards (ACI, ASTM, PennDOT Publication 408), material requirements for forms and reinforcement, concrete mix criteria (Class AA), and execution procedures for subgrade preparation, forming, and finishing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 31 29 Wood Fence: Technical specifications for the materials and installation of wood fences and accessories. The document details requirements for post and rail materials, pressure-treated wood, galvanized steel sleeves, fasteners, and concrete anchoring, as well as installation and finishing procedures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 31 29 Wood Fence Specifications: Technical specifications for the materials and installation of wood fences and accessories. The document details requirements for post and rail materials, pressure-treated wood, galvanized steel sleeves, non-corrosive fasteners, and concrete anchoring, as well as installation and finishing procedures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 71 00 - Aquatic Plants: Technical specifications for the furnishing, delivery, and planting of aquatic and emergent wetland plants. The document details quality insurance, delivery requirements, acceptable plant types, fertilizer specifications (AgriForm slow-release tablets), and specific execution instructions for planting patterns and temperature constraints.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 92 00 - Seeding: Technical specifications for seeding and restoration work, including requirements for topsoil, fertilizer, lime, seed mixes, and sod. The document outlines quality assurance standards (PennDOT Publication 408), submittal requirements, material properties, and execution guidelines for subgrade preparation and timing of operations.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyPennsylvania → Warminster Township, Bucks County, PA
The work to be completed under this contract consists of all labor, equipment and materials necessary to
complete various stormwater management maintenance projects at seven (7) locations in Warminster
Township: Centennial Road, Laurel Avenue, Manor Drive, Arbor Lane, Lavera Road, Kemper Drive and Acorn
Drive. The stormwater work generally includes the following: replacement of 3’x12’ and 3’x16’ box culverts,
replacement of a 42” diameter Smooth Lined Corrugated Plastic Pipe (167 linear foot and 200 linear foot)
and a 72” diameter Smooth Lined Corrugated Plastic Pipe (163 linear foot), streambank restoration,
installation of concrete wing walls, a concrete endwall, a manhole, inlets and cofferdams, and the relocation
of a shed. Construction will occur in Township easements and rights-of-way and will involve roadway,
sidewalk, curb, riparian buffer and lawn restoration.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award