Washingtin Road over Eastside Bypass Bridge Emergency Retrofit Project (Project)
Forecast
2026-EIR-006State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Merced County
Place of Performance
CASet-Aside
NONE
Timeline
PhaseForecast
Organization & Contact Information
Show more
AgencyCalifornia → Merced County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Merced County
Office AddressN/A
Contacts
Full Description
Show more
The Washington Road over Eastside Bypass bridge (Bridge) has been closed since May 2023 due to settlement at Piers 9 through 17. The County will rehabilitate the Bridge to its as-built condition and reinforce failing supports. The Project will construct new supports adjacent to existing supports, raise the bridge to its as-built elevation, then remove the existing supports. The channel will be dry during construction. Work will be conducted within the existing County right of way and is anticipated to be completed in one construction season. The existing bridge deck will be treated with methacrylate.
Similar Contracts
Same NAICS industry code
Prepare for this forecast
Research this forecast and prepare for the solicitation
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
