Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Washington Public Infrastructure Project

Closed
26-041-ITBState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 13 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Washington Public Improvement Project focuses on enhancing pedestrian infrastructure along F Street between 5th and 6th Streets in the Washington District to support ongoing revitalization efforts. Key components include constructing new sidewalk segments to close existing gaps, installing ADA-compliant curb ramps and improved crosswalks, and upgrading street lighting to boost visibility and pedestrian safety. The project further incorporates landscaping and irrigation enhancements to align with prior streetscape improvements in the area. Additionally, a new traffic signal will be installed at the 5th Street and F Street intersection to improve traffic flow and safety for both pedestrians and drivers. The City of West Sacramento is managing this public solicitation, designated by solicitation number 26-041-ITB, with a response deadline set for May 14, 2026. Prior to construction, the City will secure a Permit to Construct and Enter for limited areas outside the right-of-way. The Capital Projects - Engineering agency is overseeing the project, with Joanna Ortiz, Assistant Engineer, and Allison Webster, Financial Specialist, serving as primary contacts. The project supports the City’s commitment to improving public infrastructure and pedestrian accessibility within California’s West Sacramento region.

General Info

Washington Public Improvement Project installs sidewalks, ADA ramps, lighting, traffic signal, and landscaping on F Street.

Documents

10

26-041-ITB Washington Public Infrastructure Project

PDF, High priority: read this firstitb
High

26-041-ITB Washington Public Infrastructure Project

PDF, High priority: read this firstitb
High

California Construction Wage Rates General Decision CA20250007

PDF, High priority: read this firstwage-determination
High

Contract for Services - West Sacramento Federal Boilerplate RFP 5.1.24

DOCX, High priority: read this first23 pages · contract-document
High

FHWA-1273 Federal Aid Construction Contract Provisions Oct 2023

DOCX, High priority: read this first14 pages · contract-provisions
High

Insurance Checklist 2023 for City of West Sacramento Contracts

PDF, High priority: read this first1 page · insurance-checklist
High

Washington Public Infrastructure Improvement Project - Invitation to Bid

PDF, High priority: read this firstrfb
High

Washington Public Infrastructure Improvement Project Plans

PDF, High priority: read this firstplans
High

MOA for E & F Streets Improvements Project, West Sacramento

PDF, Low prioritymemorandum-of-agreement
Low

Washington Public Infrastructure Improvement Project Signed Plans 4-29-2026

PDF, Low prioritycontract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Capital Projects - Engineering
Contacts2 people available
OfficeWest Sacramento, CA, 95691, USA
Office AddressWest Sacramento, CA, 95691, USA
Contacts
Joanna OrtizAssistant Engineer
Allison WebsterFinancial Specialist

Interested Companies (31)

Roadstar Logistic
ConstructConnectCincinnati, OH

See All 31 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Washington Public Improvement Project ("Project") is located along F Street between 5th Street and 6th Street and is intended to improve pedestrian infrastructure and support ongoing revitalization efforts within the Washington District. Improvements will include the construction of new sidewalk segments to close existing gaps, installation of ADA-compliant curb ramps and crosswalk improvements, and installation of new street lighting to improve visibility and pedestrian safety. The project will also include landscaping and irrigation improvements designed to complement the aesthetic of streetscape improvements completed within the Washington District. In addition, the project includes the installation of a new traffic signal at the intersection of 5th Street and F Street to improve traffic operations and enhance safety for both pedestrians and motorists. The City is currently obtaining a Permit to Construct and Enter for limited areas outside the right-of-way. The permit will be secured prior to construction.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS