Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nevada was posted on October 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Washoe Hydroelectric Powerhouse Improvements - CMAR Services

Closed
RFP #20-0034State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 12 hours ago

DEADLINE

in 12 days
NAICS: 238910
New
SLED
26-037-CIP
Solicitation # 26-037-CIP
The SportsOhio PowerPlay Demolition project, identified as solicitation 26-037-CIP, is a City of Dublin, Ohio, contract for the demolition and restoration of specific areas at 6314 Cosgray Road. The scope of work includes the removal of the Can-Am/go cart track, batting cages, a concrete seating pad, associated walkway connections, and a mini golf course. The project has an engineer's estimate of $259,606.50 and must be completed by April 30, 2027. Key technical requirements include adhering to the 2026 City of Dublin and City of Columbus Construction and Material Specifications, following National Electric and Safety Codes, and ensuring tree clearing occurs specifically between October 1 and March 31. Bids are submitted via Bid Express and are evaluated based on a lowest and best analysis, with a strong preference for Ohio-based bidders or those from reciprocal border states. Qualified bidders must provide a bid guaranty per the Ohio Revised Code, evidence of similar experience, and a noncollusion affidavit. The contract mandates the payment of prevailing wages and requires the use of domestic source end products. Payment is structured monthly at a rate of 95% until the work is 50% complete, after which the retention amount may be reduced at the City's discretion. All inspections are managed by the City of Dublin, though the contractor must coordinate utility abandonment inspections with AEP, Columbia Gas, and other communications companies.
City of Dublin, OH - Engineering

POSTED

about 14 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The Truckee Meadows Water Authority (TMWA) is seeking qualified firms to provide Construction Manager at Risk (CMAR) services for the Washoe Hydroelectric Powerhouse Improvements project. The scope involves demolishing the existing powerhouse and constructing a new facility with a concrete lower level designed to house new turbine generators, switchgear, and electrical controls. Additional work includes replacing the transformer, interconnecting the penstock, and implementing general site improvements. The project is estimated to cost approximately $12 million and is classified as a Horizontal Construction Project. Interested firms must participate in a mandatory site visit and adhere to confidentiality requirements regarding project information. Proposals are due by November 4, 2025, with the solicitation identified as RFP #20-0034. The project is located in Nevada, and the primary point of contact for inquiries is Shelley Huxhold via email or phone. The contract aims to facilitate significant upgrades to the hydroelectric infrastructure, ensuring improved operational capacity and site safety. More details and submission information can be accessed through the provided online link.

General Info

Agency

Nevada → Truckee Meadows Water Authority

Place of Performance

NV, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNevada → Truckee Meadows Water Authority
Contacts1 person available
OfficeN/A
Organization / Agency
Nevada → Truckee Meadows Water Authority
Office AddressN/A

Full Description

Show more
Truckee Meadows Water Authority (TMWA) invites qualified firms to submit proposals for the Washoe Hydroelectric Powerhouse Improvements – CMAR Services. The project consists of demolition of the existing powerhouse and the construction of a new powerhouse with concrete lower level that will house new turbine generators, switchgear, and electrical controls. Further work includes the replacement of the transformer, penstock interconnect, and general site improvements.   Please see the Activities tab for details regarding the mandatory site visit.      All content viewed and/or downloaded is consider confidential information and shall be used by the Recipient solely for the purpose of evaluating and potentially submitting a bid for the Project, and not in any way detrimental to TMWA.  Recipient shall not copy or otherwise reproduce any confidential information and may not distribute any information to any third-party that is not necessary for purposes of evaluating and submitting a bid for the Project.       The Engineer's estimate is: $12,000,000.00   This Project is deemed a Horizontal Construction Project.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS