Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Waste and Septic System Compliance

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract requires the management of cannabis waste through a designated 10'x10' till area, ensuring all disposal activities comply with state regulations for handling agricultural and controlled substance byproducts. This includes proper containment, treatment, and documentation of waste to prevent environmental contamination and meet operational standards under the California Cannabis Control Department's oversight. The service provider must maintain strict adherence to protocols governing the physical handling and transformation of waste within the specified till zone. Additionally, the contract mandates full compliance with local and state septic system requirements for wastewater generated on-site. This involves routine inspection, maintenance, and reporting to ensure that effluent discharge does not compromise groundwater quality or public health. All activities must align with regulatory frameworks applicable to cannabis cultivation facilities, with particular attention to the site located in Hayfork, California, where environmental conditions and local infrastructure place additional constraints on waste and water management practices.

General Info

Manage cannabis waste in 10'x10' till area with state compliance, septic adherence, and Hayfork-specific environmental protocols.

Agency

California Cannabis Control, Department of

NAICS

562991 - Septic Tank and Related ServicesView NAICS

Place of Performance

Hayfork, CA, 96041

Set-Aside

NONE

Documents

This scope was carved out of LCA26-0000208.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Green Peak LLC LCA26-0000208

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Cannabis Control, Department of
ContactsNo contacts available
OfficeN/A
Organization / Agency
California Cannabis Control, Department of
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Manage cannabis waste via a 10'x10' till area and ensure septic system compliance for wastewater.

Similar Contracts

Same NAICS industry code

NAICS: 562991
New
Trade building Sewer Line Repair
Solicitation # trade-building-sewer-line-repair
Education and Training Resources LLC is soliciting bids for a subcontracting opportunity to repair and replace the sewer line serving the Trade Building at the Iroquois Job Corps Center in Medina, New York. The scope of work involves the removal and replacement of approximately 155 linear feet of sewer pipe at a depth of 3 feet, including the removal of asphalt and concrete, bathroom tie-ins, full restoration of affected surfaces, and mandatory pressure and leak testing. Bids must be submitted by 12:00 pm EST on September 14, 2026, to Denise Socha. The project is a fee-for-service engagement where the award will be based on the best overall value rather than the lowest bid. Eligible bidders must be registered with SAM.gov and provide a UEI number, business licenses, and a W-9. Required submission documents include a detailed itemized quote covering labor, materials, equipment, disposal, restoration, and testing, along with a proposed service schedule and New York state licensing. This is a bonded project with specific requirements: projects between $35,000 and $150,000 require a 100% payment bond and additional payment protection, while projects exceeding $150,000 require both 100% performance and payment bonds. Contractors must also provide proof of Builders Risk, Automobile, Liability, and Workers Compensation insurance, and certify compliance with the Davis-Bacon Act. The contract is subject to several federal regulations, including FAR 52.204-10 regarding executive compensation reporting under FFATA, FAR 52.209-6 for debarment certification, and the Service Contract Act. Strict site security and conduct regulations apply, prohibiting the transport of alcohol, drugs, tobacco, or firearms and forbidding fraternization with students or staff. Final project acceptance is contingent upon a signed punch list, documentation of testing results, and the provision of all applicable warranties.
Iroquois Job Corps Center

POSTED

about 11 hours ago

DEADLINE

in 14 days
View Details