This Solicitation opportunity from Texas was posted on July 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Houston is soliciting bids for solicitation number CB-2026-0056 to provide construction services for the rehabilitation and reconstruction of wastewater force mains at the Songwood and Gessner No. 1 lift stations. The project involves installing and replacing force main infrastructure within public rights-of-way and sanitary sewer easements to enhance system capacity, reliability, and operational efficiency. The estimated construction budget is 5,000,000.00 dollars, with a response deadline of August 20, 2026. The scope of work includes geotechnical and environmental site investigations, subsurface exploration, and the development of trenchless installation recommendations, with a performance timeline requiring substantial completion within 340 days of the commencement date.
The award may be based on the overall low net bid or the overall best bid, allowing for a trade-off process between cost and qualitative factors. Bidders must comply with pipeline and Harris County Flood Control District requirements, as well as environmental standards including ASTM E1527-21 and ASTM E1903-19. Key contractual requirements include a security deposit equal to 10 percent of the bid amount, performance and payment bonds, and certifications regarding debarment, suspension, and anti-lobbying. Additionally, contractors must adhere to drug-free workplace mandates, equal employment opportunity standards, and HUD Section 3 compliance if federally assisted. The M/WBE goal for this solicitation is 0 percent.
General Info
Houston seeks contractors to rehabilitate wastewater force mains at Songwood and Gessner No. 1 lift stations for $5 million.
HighAI Summary for 00430 Bidder's Bond for City of Houston Project: This document, titled '00430 Bidder's Bond,' dated May 2, 2019, is a binding agreement between the Bidder and Surety to the City of Houston. It guarantees the Bidder's commitment to perform the work as per the bid proposal and contract documents. The bond amount is 10% of the total bid price. If the Bidder fails to execute the contract and required bonds within the contract time, the bond remains in full force. The document includes conditions, obligations, and notice procedures, and requires signatures from the Bidder and Surety with attached Power of Attorney.
PDF
PDF, High priority: read this firstmwsbe-participation-plan
HighAI Summary for 00470 - Bidder's MWSBE Participation Plan: This document, edition dated 01-18-2022, is the Bidder's MWSBE Participation Plan form required by the City of Houston. It must be submitted with the bid to demonstrate the bidder's plan to meet Minority/Women-owned Small Business Enterprise (M/WBE) contract goals. The form includes instructions on meeting MBE and WBE goals separately, the use of Small Business Enterprise (SBE) credits, and prime level participation. It also outlines the requirement to submit a Record of Good Faith Efforts and a Request for Deviation if goals cannot be met. The document contains tables for listing certified firms, NAICS codes, work descriptions, and participation percentages. By submitting, the bidder agrees to formal subcontracting agreements with listed MWBE subcontractors upon contract award.
PDF
PDF, High priority: read this firstgood-faith-efforts-form
HighAI Summary for 00471 - Pre-Bid Good Faith Efforts Form: This document, titled 'Pre-Bid Good Faith Efforts' (Document 00471), dated August 2015, is a form required by the City of Houston for bidders or proposers who may not meet the Minority, Women, Small Business Enterprise (MWSBE) participation goals in a contract. It must be submitted along with supporting documentation to demonstrate the bidder's good faith efforts to meet the MWSBE goals as outlined in the City's Good Faith Efforts Policy (Document 00808). The form includes tables for listing NAICS codes, plan item numbers, MWSBE types, certified firm contact information, methods and dates of contact, responses, and results of contact. Failure to submit this form when the participation plan does not meet the contract goal may result in the bid being found non-responsive. The document is intended to be completed by the bidder or prime contractor and reviewed by the Office of Business Opportunity after the selection of an apparent low bidder.
PDF
PDF, High priority: read this firstgoal-deviation-request
HighAI Summary for Bidder's MWSBE Goal Deviation Request: This document is a Bidder's MWSBE (Minority, Women, and Small Business Enterprise) Goal Deviation Request form. It is used by bidders or proposers to request deviation from the department-approved MWSBE goals for a specific project and bid or contract number. The form includes fields for the bidder's proposed MWSBE goals compared to the department's goals, justification for the deviation, and any additional good faith efforts not listed in the Good Faith Effort Report. It also contains sections for bidder contact information and official approval status by the OBO representative. The document is essential for compliance and evaluation of MWSBE participation in the contracting process.
DOCX
DOCX, High priority: read this firstownership-information-form
HighAI Summary for City of Houston Ownership Information Form: This document is the City of Houston Ownership Information Form, revised on 12/23/2019. It is used to comply with the City of Houston Contractor Ownership Disclosure Ordinance, the Fair Campaign Ordinance, and the State of Texas Statement of Residency Requirements. The form collects detailed ownership information, including names and addresses of owners with 10% or more interest, officers, and directors. It also includes sections for bidder residency status, organizational entity type, listing of business addresses in Houston, and optional tax appeal information. The form must be completed and submitted with the official bid or proposal form, with instructions emphasizing legibility and completeness.
DOCX
DOCX, High priority: read this firstoffer-submittal
HighAI Summary for Exhibit I - Offer and Submittal, References: This document is Exhibit I, the Official Signature Page and References section for a City of Houston Invitation to Bid. It includes a warranty against commissions or fees for securing the contract, a certification of no collusion, and an offer to furnish goods/services per the solicitation terms. The document requires an authorized signature from the bidder's legal entity. It also contains a references list for previous customers with fields for contact details, contract dates, project descriptions, and emails. This exhibit is part of the formal bid submission package.
DOCX
DOCX, High priority: read this firstsite-visit-background-check
HighAI Summary for Exhibit J - Site Visit and Background Check Consent Form for CB-2026-0056: This document is Exhibit J, a Site Visit and Background Check Consent Form for the Wastewater Force Main Rehabilitation and Reconstruction project at Songwood and Gessner No. 1 Lift Stations, Project No. CB-2026-0056. It outlines the requirements for attendees to submit a background consent form and identification for security clearance prior to site visits. The form includes personal information fields, disclosure and consent for criminal background checks, and a consent statement authorizing the City of Houston to perform and disclose background verification results. Attendees must also wear OSHA-compliant personal protective equipment during the site visit.
DOCX
DOCX, High priority: read this firstfederal-provisions-exhibit
HighAI Summary for Federal Provisions Exhibit - Federal Compliance Requirements: This Federal Provisions Exhibit outlines the laws, codes, and safety guidelines applicable to a federally funded contract with the City. It emphasizes compliance with federal, state, and local regulations including environmental laws, civil rights laws, and registration requirements such as SAM and OFAC. The document specifies that the contract is subject to federal funding availability and includes provisions on suspension and debarment in accordance with federal regulations. It serves as a mandatory compliance guide for bidders and contractors involved in the project, ensuring adherence to all relevant federal statutes and executive orders.
PDF
PDF, High priority: read this firstgeotechnical-report
HighAI Summary for Geotechnical Investigation Report for Gessner #1 Lift Station Force Main Replacement R-000035-0028: This final geotechnical investigation report dated June 24, 2024, covers the Wastewater Force Main Rehabilitation and Reconstruction Design Consent Decree for the Gessner #1 Lift Station in Houston, Texas (WBS No. R-000035-0028-3). The study involved drilling five soil borings, installing one piezometer, laboratory testing, and engineering analyses. Key findings include no documented faults crossing the project alignment, detailed pavement and subsurface soil descriptions, and groundwater observations. The report provides recommendations for open-cut excavation, trenchless installation, piping system thrust restraint, and structural foundations, with adherence to OSHA standards. The project entails replacing approximately 2,500 linear feet of 8-inch sanitary sewer force main along Gessner Road using open cut and trenchless methods.
PDF
PDF, High priority: read this firstgeotechnical-report
HighAI Summary for Geotechnical Investigation Report for Songwood Lift Station WW FM Replacement R-000035-0028: This final geotechnical investigation report dated June 7, 2024, was prepared by Geotest Engineering, Inc. for the Songwood Lift Station Wastewater Force Main Rehabilitation and Reconstruction Design Consent Decree project in Houston, Texas (WBS No. R-000035-0028-3). The study included drilling six soil borings, installing one piezometer, laboratory testing of soil samples, and engineering analyses. Key findings include no documented faults crossing the project alignment, detailed subsurface soil descriptions, groundwater levels, and recommendations for open-cut excavation, trenchless installation, and structural considerations. The report provides critical geotechnical parameters and construction guidance for the force main replacement project.
PDF
PDF, High priority: read this firstenvironmental-assessment-report
HighAI Summary for Phase I Environmental Site Assessment Report - Gessner Lift Station: This is the final Phase I Environmental Site Assessment (ESA) report for the Wastewater Force Main Rehabilitation and Reconstruction Design Consent Decree at Gessner Lift Station in Houston, Texas, dated July 18, 2023. The report, prepared by Geotest Engineering, Inc. for Amani Engineering, Inc., documents the records review, site reconnaissance, findings, and conclusions. It follows ASTM E1527-21 standards and Houston Public Works' Infrastructure Design Manual requirements. The assessment covers approximately 2,500 linear feet of force main along Gessner Road, including environmental record reviews, historical map analysis, site observations, and interviews. Key findings indicate no recognized environmental conditions within the project area, with detailed appendices including maps, photographs, and environmental data. The report supersedes all prior drafts and communications related to this project.
PDF
PDF, High priority: read this firstenvironmental-site-assessment
HighAI Summary for Phase I Environmental Site Assessment Report - Songwood Lift Station: This is the final Phase I Environmental Site Assessment (ESA) report for the Wastewater Force Main Rehabilitation and Reconstruction Design Consent Decree at Songwood Lift Station in Houston, Texas, dated July 18, 2023. Prepared by Geotest Engineering, Inc. for Amani Engineering, Inc., the report includes records review, site reconnaissance, findings, and conclusions. It identifies Recognized Environmental Conditions (RECs) such as leaking petroleum storage tanks and historic auto stations near the project alignment. The assessment follows ASTM E1527-21 standards and Houston Public Works' Infrastructure Design Manual requirements. It covers site description, historical use, environmental records, interviews, and floodplain data, providing a comprehensive environmental risk evaluation for the approximately 2,500 LF force main alignment project.
PDF
PDF, High priority: read this firstenvironmental-assessment-report
HighAI Summary for Phase II Environmental Site Assessment Report - Songwood Lift Station: This Phase II Environmental Site Assessment (ESA) Report, dated May 17, 2024, was prepared by Geotest Engineering, Inc. for Amani Engineering, Inc. The assessment supports the Wastewater Force Main Rehabilitation and Reconstruction Design Consent Decree at Songwood Lift Station, Houston, Texas. The report follows ASTM E1903-19 standard practice and includes drilling and sampling of ten environmental borings to 20 feet depth, field screening for volatile organic compounds, and laboratory analysis of soil samples for petroleum hydrocarbons and volatile organic compounds. No groundwater was encountered, and no chemicals of concern or potential petroleum contaminated areas were detected. The report summarizes the methodology, findings, and conclusions relevant to the proposed construction project.
PDF
PDF, High priority: read this firstcb
HighAI Summary for Solicitation CB-2026-0056 Wastewater Force Main Rehabilitation: This document is a competitive bid solicitation (CB-2026-0056) issued by the City of Houston on July 31, 2026, for construction services involving wastewater force main rehabilitation and reconstruction at the Songwood and Gessner lift stations. It includes key dates such as a pre-bid conference on August 11, 2026, site visits, and a solicitation due date of August 20, 2026. The project budget is estimated at $5,000,000. The solicitation outlines compliance requirements including Davis-Bacon wage laws, Texas Water Development Board funding contingencies, and M/WBE goals. It also details the procurement process, submission instructions, and relevant legal and regulatory frameworks.
PDF
PDF, Low priorityother
LowAI Summary for City of Houston Pay or Play Program Acknowledgement Form: This document is the City of Houston Pay or Play Program Acknowledgement Form related to Ordinance 2007-534. It requires bidders to acknowledge awareness and compliance with the Pay or Play program upon contract award, including ensuring subcontractor compliance. The form must be filled out and submitted with the bid or proposal packet. It includes fields for solicitation number, signature, date, vendor ID, company name, and contact information. Additional program details and contacts are provided for questions.
DOCX
DOCX, Low priorityother
LowAI Summary for Exhibit II - Hire Houston First Declaration: This document is Exhibit II, Attachment D, titled 'Declaration of Hire Houston First Designation.' It provides directions for bidders or proposers to declare their status as a Hire Houston First designated company, either as a City Business (CB) or Local Business (LB). The document includes spaces for the bidder/proposer to print their name, sign, and date the declaration. It also provides a link for companies to apply for designation if they do not already have one.
DOCX
DOCX, Low priorityother
LowAI Summary for Exhibit IV - Anti-Collusion Statement: This document is Exhibit IV, an Anti-Collusion Statement. It certifies that the bidder is the only interested party in the bid and has not engaged in any collusion or actions restraining free competitive bidding related to the contract award. The document includes a space for the bidder's signature and date.
LowAI Summary for Exhibit V - Conflict of Interest Questionnaire: This document is a Conflict of Interest Questionnaire for vendors doing business with a local governmental entity, reflecting changes made by H.B. 23, 84th Legislature. It is filed in accordance with Chapter 176 of the Local Government Code, requiring vendors to disclose business relationships, employment, gifts, or family relationships with local government officers. The questionnaire must be filed within seven business days after the vendor becomes aware of facts requiring disclosure. The document includes relevant legal citations and definitions from the Local Government Code sections 176.001, 176.003, and 176.006, outlining the requirements and penalties for non-compliance.
DOCX
DOCX, Low prioritycertification
LowAI Summary for Exhibit VI - Certification Regarding Debarment and Suspension: This document is Exhibit VI, a Certification Regarding Debarment, Suspension, and Other Responsibility Matters for primary covered transactions. It implements Executive Orders 12549 and 12689 and 2 C.F.R. Part 3000 regulations. The certification requires the contractor to confirm that neither it nor its principals or affiliates are excluded or disqualified from federal transactions. It outlines instructions for certification, consequences of false certification, and obligations to notify changes. The certification covers non-debarment, no criminal convictions related to public transactions, no indictments, and no prior terminations for cause within three years. If unable to certify, an explanation must be provided. The document includes signature lines for the contractor's company name, name, title, and date.
DOCX
DOCX, Low prioritycertification
LowAI Summary for Exhibit VII - Anti-Lobbying Certification: This document is Exhibit VII, titled Anti-Lobbying Certification. It certifies that no federal appropriated funds have been used to influence government officials in connection with federal contracts, grants, loans, or agreements. It requires disclosure if non-federal funds are used for lobbying and mandates inclusion of this certification in all subawards. The certification is a material representation under 31 USC § 1352 and subject to penalties for false statements. It includes spaces for contractor and authorized official information and signature.
DOC
DOC, Low prioritypast-performance
LowAI Summary for History of OSHA Actions and On-The-Job Injuries: Document 00604 requires the low bidder to submit a history of all OSHA actions and advisories received on all jobs worked, as well as a list of all on-the-job injuries, accidents, and fatalities involving current or former employees during the two years preceding the bid date. If the contractor has been in business for less than two years, the start date must be provided. This information must be certified by an officer of the company in a notarized statement and submitted within the solicitation's specified timeframe.
PDF
PDF
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Project Summary : The City of Houston (“City”) is soliciting bids from qualified bidders to provide construction services for wastewater force main rehabilitation and reconstruction at the Songwood and Gessner lift station locations. Work includes the installation and replacement of force main infrastructure within sanitary sewer easements and public rights-of-way to improve system reliability, capacity, and operational efficiency. Contractor shall comply with all applicable pipeline and Harris County Flood Control District (HCFCD) requirements. Estimated Construction Budget : $5,000,000.00 NIGP Code : 958-11, 968-95, 913-59, 913-9 M/WBE Goal : 0 % For information related to bid opening, please visit the following link: Strategic Procurement Division's Bid Opening