Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Georgia was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wastewater Treatment Equipment Supply and Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract entails the supply, delivery, and installation of mechanical process equipment for a 0.1 MGD wastewater treatment facility, including aeration systems, clarifiers, pumps, valves, and control panels. The work is classified as a subcontract under NAICS code 333911 and is being procured by the River Valley Regional Commission in Georgia. All equipment must be delivered and installed to meet the operational requirements of the facility, ensuring full compliance with technical and performance standards for wastewater treatment processes. The solicitation was posted on July 28, 2026, with a response deadline of September 3, 2026, at 7:00 PM. The contract does not specify a set-aside type or include details on the point of contact or exact location of performance, but the work is expected to be conducted within Georgia under the oversight of the River Valley Regional Commission. Interested parties must submit proposals by the stated deadline to be considered for award, and the procurement is accessible through the Georgia state procurement portal.

General Info

Supply and install wastewater treatment equipment for 0.1 MGD facility in Georgia by September 3, 2026.

Documents

This scope was carved out of PE-33551-NONST-2027-000000058.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

City of Arabi Advertisement for Bids Sewer Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → River Valley Regional Commission
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply, delivery, and installation of mechanical process equipment including aeration systems, clarifiers, pumps, valves, and control panels for a 0.1 MGD facility.

More opportunities from Georgia → River Valley Regional Commission

Same awarding agency

NAICS: 541330
New
SLED
City of Unadilla CDBG 2027 RFP engineering services
Solicitation # PE-33551-NONST-2027-000000066
The City of Unadilla is seeking proposals for professional engineering services to develop and implement a Community Development Block Grant (CDBG) application for sewer, water, or street and drainage improvements. Managed by the River Valley Regional Commission, the project is divided into two phases, beginning with a development phase that requires a preliminary engineering report adhering to the 2027 CDBG applicants manual. The selected engineer must be capable of producing preliminary plans and cost estimates within 30 days of selection and is responsible for maintaining all Build America, Buy America (BABA) documentation, including manufacturers' certifications, which must be certified at the project's conclusion. The contract will be structured as direct costs plus a fixed fee, not to exceed a lump sum, with the award granted to the most responsible offeror providing the most advantageous proposal. Evaluation criteria include the firm's history, a detailed project approach, and a record of up to 10 CDBG and 10 non-CDBG projects completed between 2021 and 2026. Applicants must submit three proposals by 10:00 a.m. on December 14, 2026, to the River Valley Regional Commission in Columbus, Georgia. Required submission materials include a completed CDBG RFP evaluation form, resumes of key personnel, a sample professional services contract, and a fee structure expressed as a percentage of construction.
Engineering Services

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
City of Plains CDBG 2027 RFP engineering services
Solicitation # PE-33551-NONST-2027-000000065
The City of Plains, administered through the River Valley Regional Commission, is soliciting proposals for engineering services to support a Community Development Block Grant (CDBG) project focused on sewer, water, or street and drainage improvements. The scope of work is divided into two phases: a development phase requiring a preliminary engineering report that adheres to the 2027 CDBG applicants manual, and an implementation phase that includes final design, permitting, construction supervision, and NPDES services. A critical requirement for selection is the ability to produce preliminary plans and cost estimates within 30 days of selection. The contract will be structured as direct costs plus a fixed fee, not to exceed a lump sum. Proposals must be submitted in triplicate to the River Valley Regional Commission Columbus office by 10:00 a.m. on December 14, 2026. Each submission must include a completed CDBG RFP evaluation form at the front, a detailed project approach, resumes of key personnel, a sample professional services contract, and a written release for investigations. Evaluation factors include the firm's project history from 2021-2026, proximity to the local government, fee percentages relative to construction, and the provision of state licenses for top qualified staff. Additionally, the selected engineer will be responsible for obtaining and maintaining all BABA documentation and manufacturers' certifications throughout the construction process.
Engineering Services

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS