Wastewater Treatment Facility (WWTF) Improvements - Huron, KS
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Huron, Kansas, is soliciting bids for the Wastewater Treatment Facility Improvements project, identified as solicitation 25-1213. The scope of work involves desludging the two cell wastewater treatment lagoon facility, installing new control structures, piping, and discharge structures, and adding new woven wire perimeter fencing. Additionally, the project requires lagoon side slope re-shaping and the installation of rip rap slope protection rock. Bids must be submitted to the City of Huron City Shop at 207 Main Street in Huron, KS, by 2:00 pm local time on October 29, 2026. This project is fully funded by the Kansas Water Office and requires compliance with the Kansas Act Against Discrimination Contract Provisions. All inquiries regarding the bidding documents should be directed in writing to the Project Engineer, Samuel Johnson.
General Info
Place of Performance
Huron, KS, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Interested Companies (13)
See All 13 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
The City of Huron, KS (Owner) is requesting Bids for the construction of the following Project:
Wastewater Treatment Facility (WWTF) Improvements 25-1213
Bids for the construction of the Project will be received at City of Huron City Shop located at 207 Main Street in Huron, KS 66041 until 10/29/2026 at 2:00 pm local time. At that time the Bids received will be publicly opened and read.
The Project includes the following Work:
Desludging the two cell Wastewater Treatment Lagoon Facility. Installation of new control structures, new piping and new discharge structures. Installation of new woven wire WWTF perimeter fencing. Lagoon side slope re-shaping and rip rap slope protection rock installation.
A pre-bid conference for the Project will not be held for this project. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
The project is fully funded by the Kansas Water Office (KWO) and requires the contractor to comply with the Kansas Act Against Discrimination Contract Provisions Form included in the bidding documents.
The Owner reserves the right to reject any and all bids and to waive any irregularities therein.
Mayor Lonnie Myers
City of Huron, KS
Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows:
Samuel Johnson, P.E.
Project Engineer
samuel.johnson@bgcons.com
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
