Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Wastewater Treatment Plant Engineering & Design

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Cincinnati involves providing comprehensive engineering and design services for headworks treatment facility upgrades for the Metropolitan Sewer District of Greater Cincinnati. The scope of work includes performing alternatives analysis and lifecycle cost modeling, as well as designing critical infrastructure such as pump stations, screening facilities, energy storage, disinfection systems, and flow-splitting systems. The selected provider must hold a Professional Engineer license and ensure all work complies with MSDGC design standards. The project requires the delivery of a full suite of technical documentation, spanning from initial concept and basis of design through 30 percent and final design documents. This opportunity falls under NAICS code 541330 and was posted on September 16, 2026, with a response deadline of October 27, 2026.

General Info

Engineering and design services for Cincinnati headworks treatment facility upgrades and infrastructure.

Place of Performance

OH, USA

Set-Aside

NONE

Documents

This scope was carved out of 275X901192.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Little Miami Wastewater Treatment Plant High-Rate Treatment (LMWWTP HRT) Facility Progressive Design-Build Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → City Of Cincinnati
ContactsNo contacts available
OfficeN/A
Organization / AgencyOhio → City Of Cincinnati
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs comprehensive engineering and design services for prime contractors on Metropolitan Sewer District of Greater Cincinnati (MSDGC) HRT facility upgrades. Conducts alternatives analysis, lifecycle cost modeling, and designs for screening facilities, pump stations, flow-splitting systems, disinfection systems, and energy storage. Requires PE license and compliance with MSDGC design standards. Delivers concept, basis, 30%, and final design documents.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
International
PGS - Pulteney Gate Scheme: Buildability, Logistics & Surveys Commission
Solicitation # DN828868
Bath & North East Somerset Council is seeking a contractor-led team for the Pulteney Gate Scheme to investigate, appraise, and develop deliverable options for replacing the Pulteney Radial Gate on the river Avon in Bath. The scope of work involves reviewing existing project data, conducting intrusive and investigative surveys, and assessing site access, logistics, and stakeholder constraints. The appointed contractor will evaluate several options, including the installation of a hydro-station, extending or creating a stepped weir, infilling the channel for public realm use, or implementing minimum asset maintenance. Key deliverables include a series of evidence-based appraisal reports and a final composite recommendation to support the Outline Business Case at P3M Stage 2 and inform future route-to-market strategies for main works. The contract, identified by solicitation number DN828868, has an estimated total value of 480,000 GBP including VAT. The performance period is expected to run from January 4, 2027, to October 1, 2027, with a possible extension to December 31, 2027. Award decisions will be based on a weighted scoring system of 60 percent quality and 40 percent price. Bidders must demonstrate technical competency by holding at least five out of nine specified professional charters or registrations and must comply with CDM 2015 standards. The procurement is noted as being particularly suitable for small and medium-sized enterprises.
Bath & North East Somerset Council

POSTED

about 5 hours ago

DEADLINE

in 28 days
View Details

More opportunities from Ohio → City Of Cincinnati

Same awarding agency

NAICS: 541310
SLED
BuildReady
Solicitation # RFP275X901201
The City of Cincinnati, through the Office of Strategic Growth, is soliciting proposals under RFP275X901201 for the BuildReady initiative. The project requires a licensed Ohio architect to design six complete, construction-level, permit-ready plan sets for middle housing, specifically consisting of two duplexes, two triplexes, and two fourplexes. These designs must be pre-approved by the Department of Buildings and Inspections to expedite development within Connected Communities corridors. The scope of work includes visiting construction sites, writing professional reports, collaborating with city staff and developers, and reviewing bid and site plans. All designs must adhere to current Ohio building standards, zoning laws, Universal Design principles, and HUD Minimum Property Standards and Housing Quality Standards. Proposals will be evaluated based on cost and budget, innovativeness and creativity, the contractor's understanding of the seven project objectives, and any qualifying entries into the BuildReady Design Competition. Required submissions include a detailed cost breakdown, a comprehensive delivery schedule, and specific corporate and accuracy affidavits. The project is funded via federal grant programs subject to HUD Title IV-A Program approval. Awarded contractors must be taxpayers in good standing with the City of Cincinnati and comply with Municipal Code Chapter 325 regarding Equal Employment Opportunity. All submissions must be uploaded via the designated Bonfire hub portal by the specified deadline, as hard copy or email submissions are not accepted.
Architectural Services

POSTED

16 days ago

DEADLINE

in 21 days
View Details
NAICS: 237110
SLED
Little Miami Wastewater Treatment Plant High-Rate Treatment (LMWWTP HRT) Facility Progressive Design-Build Project
Solicitation # 275X901192
The City of Cincinnati, for the Metropolitan Sewer District of Greater Cincinnati, is seeking a Design-Builder for the Little Miami Wastewater Treatment Plant High-Rate Treatment (LMWWTP HRT) Facility project. This Progressive Design-Build project aims to increase peak wet-weather treatment capacity by 115 mgd, reaching a total target of 215 mgd. The scope includes the construction of a new HRT facility using cloth media filtration as the baseline solution, upgrading the Four Mile and Little Miami Pump Stations, installing a new flow-splitting headbox, and upgrading disinfection facilities. The project also requires the demolition of existing incineration, dewatering, and maintenance facilities to accommodate the new infrastructure. The procurement is a two-phase process starting with a Request for Qualifications (RFQ) to shortlist firms, followed by a Request for Proposals (RFP). Phase 1 focuses on design and preconstruction to establish a Guaranteed Maximum Price (GMP), while Phase 2 covers construction, startup, and formal acceptance testing. The City estimates the project value at approximately 300 million dollars, and respondents must demonstrate a bonding capacity of at least 400 million dollars. The contract award is planned for June 2027, with final project completion expected no later than 2035. Evaluation of candidates will be based on engineering and design experience, project understanding, and past performance.
Water and Sewer Line and Related Structures Construction

POSTED

about 1 month ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS