Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Water and Sewer Pipe Material Supplier

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-55-05.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB-26-55-05 BCW Cassville White Road Ph2 Widening and Sewer Relocation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Bartow County Government
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies piping materials for prime contractors on Bartow County Government utility relocation projects. Delivers 2,060 LF of DIP (various sizes), 450 LF of 3” HDPE DR 9, and 645 LF of steel casing (12” and 20”). Materials must meet PC 350 and DR 9 specifications. Delivers specified piping materials to the project site.

Similar Contracts

Same NAICS industry code

NAICS: 336612
New
Federal
USCG Response Boat Small Third Generation (RB-S III)
Solicitation # 70Z02326R93250001
The United States Coast Guard is soliciting proposals for the Response Boat Small Third Generation (RB-S III) program to recapitalize its aging fleet of 29-foot RB-S II platforms. This total small business set-aside acquisition involves the design, production, testing, and delivery of up to 440 boats and associated purpose-built trailers, along with logistics support, technical documentation, and crew familiarization. The contract is structured as an Indefinite-Delivery, Indefinite-Quantity (IDIQ) vehicle with an anticipated ten-year ordering period, consisting of a two-year base period and an eight-year option period. Technical requirements specify that vessels must achieve speeds of at least 45 knots, accelerate from 0 to 30 knots in under 15 seconds, and maintain an operational life of 15 years. The procurement utilizes a two-phase competitive acquisition and down-select process based on a best-value tradeoff. In Phase I, the government will evaluate written proposals based on mission effectiveness, production and management, and price to award up to four IDIQ contracts. Each Phase I awardee will produce one demonstrator boat and trailer. In Phase II, these demonstrators will undergo a 90-day in-water demonstration to evaluate performance. Following this comparative evaluation, a single contractor will be selected to receive all subsequent production delivery orders. Phase I proposals are due by 1400 Eastern Time on November 13, 2026, and must be submitted electronically via the Department of Defense Secure Access File Exchange.
CG-SEA-CA3

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

More opportunities from Georgia → Bartow County Government

Same awarding agency

NAICS: 541330
SLED
RFQ 26-35-007 Elm Street from Main Street to SR3 (GDOT PI#0021602) (CB-207)
Solicitation # 26-35-007
Bartow County is soliciting Statements of Qualifications for professional engineering and design services to improve drainage and pedestrian access along Elm Street, spanning from Main Street to SR 3. This project, identified as GDOT PI# 0021602, aims to support the Downtown Development Authority Master Plan by designing new sidewalk infrastructure and enhancing connectivity into Downtown Adairsville. The selected consultant will be responsible for advancing the project from concept development through preliminary design, which includes delivering a Concept Report featuring traffic engineering analyses, roundabout feasibility evaluations, and preliminary construction cost estimates. Additionally, the consultant will assist with construction inspections to ensure compliance with project specifications. The selection process is conducted in two distinct phases. Phase I focuses on shortlisting three to five firms based on experience and qualifications (30%) and resources and workload capacity (20%). Finalists will then proceed to Phase II, where they are evaluated on their technical approach (40%) and past performance (10%). To be eligible, the Prime Consultant must be prequalified by the Georgia Department of Transportation in the required area classes. Submissions must adhere to strict formatting guidelines, including specific page limits and the use of a minimum 11-point font, and must be submitted by the October 23, 2026, deadline. Compliance with the Georgia Security and Immigration Compliance Act and adherence to 48 CFR Part 31 cost principles are mandatory requirements for all participating firms.
Engineering Services

POSTED

22 days ago

DEADLINE

in 15 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS