Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Water Infrastructure Assessment Engineering

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Floor Boston, MA, 02114, USA

Set-Aside

NONE

Documents

This scope was carved out of BD-27-1045-BWR00-BWR01-133977.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

DEP-BWR-2027-Clean Water-WTO Announcement Only

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMassachusetts → BWR00 - Bureau of Water Resources
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs specialized engineering assessments of water infrastructure for prime contractors on MassDEP Bureau of Water Resources projects. Conducts infrastructure assessments, evaluates the condition of water systems, and provides engineering analysis for the State Revolving Fund (SRF) Program. Requires Professional Engineering (PE) licensure and expertise in water/wastewater infrastructure. Delivers infrastructure assessment reports and engineering evaluations.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Federal
SR Power Supplies Rack Detailed Design for ALS-U
Solicitation # AA-2027-01
The University of California, acting on behalf of the Lawrence Berkeley National Laboratory (LBNL), has issued Request for Proposal No. AA-2027-01 for the detailed design of ALS-U Storage Ring Power Supplies rack assemblies. This engineering services solicitation, classified under NAICS 541330, requires a subcontractor to complete the detailed design of 76 power supply racks across 16 distinct layouts, categorized into Standard, Hard Bend, and ATS/STA sectors. The scope includes developing 3D models using Autodesk Inventor Professional 2025, production drawings, electrical diagrams, and cable-harness documentation. The project follows a phased approach with six mandatory design review milestones, including Preliminary Design Reviews (PDR) and Final Design Reviews (FDR), with a target completion date for the full Technical Data Package of January 31, 2027. The period of performance for the resulting subcontract is expected to extend through January 31, 2029. Proposals must be submitted via email or secure electronic transmission to the University Procurement Representative no later than midnight PST on October 2, 2026. Submissions must include a Technical Volume addressing methodology, schedule, personnel, past performance, and quality assurance, as well as a Business Volume containing the price proposal and mandatory enclosures. The price proposal must feature a firm fixed price for the design package and a separate rate for on-call hourly support. LBNL will award the contract based on the best overall value, evaluating both technical expertise and non-technical factors such as the acceptance of subcontract terms. Mandatory submission requirements include a completed ALS-U Quality Evaluation Survey and a Standard Form Representation and Certification form. The work is primarily to be performed at the subcontractor's facility with remote coordination and occasional on-site visits to Berkeley, California.
Berkeley National Labor - DOE Contractor

POSTED

about 9 hours ago

DEADLINE

in 18 days
View Details
NAICS: 541330
New
SLED
Keller Community Center Roof Replacement Engineering & Design
Solicitation # RFP-KCC-Roof-Design.pdf
The Confederated Tribes of the Colville Reservation is seeking a Washington State Certified and Licensed Engineering Firm to provide stamped engineered drawings and specifications for the replacement of approximately 10,000 square feet of roofing at the Keller Community Center in Nespelem, Washington. The scope of work includes providing construction-ready documents, RFI responses, submittal reviews, professional guidance on asbestos, and assistance with the Construction RFP Scope of Work. The contractor is responsible for providing cost estimates for the entire project and individual sections, including the gymnasium, metal roof, and walkway roof, while ensuring HVAC curbs are sealed and engineering a ladder for roof access. Engineering services are scheduled for completion between October 2026 and March 2027, with continued support through the construction phase. Proposals must be submitted by 3:00 p.m. PST on October 29, 2026, and must not exceed 30 pages. Evaluation is based on a 100-point scale considering technical responsiveness, qualifications, experience, cost, and TERO preferences, with a specific price preference for responsible Indian Offerors within 10 percent of the lowest bid. Awarded contractors must consent to the jurisdiction of the Colville Tribal Court and maintain comprehensive insurance, including Commercial General Liability of 1 million dollars per occurrence. Additionally, contracts exceeding 100,000 dollars require a performance bond, otherwise, a 25 percent retainage applies. All payments are contingent upon the availability of funds within the tribal treasury and follow a fiscal year from October 1 to September 30.
Confederated Tribes of the Colville Reservation

POSTED

about 14 hours ago

DEADLINE

in 28 days
View Details

More opportunities from Massachusetts → BWR00 - Bureau of Water Resources

Same awarding agency

NAICS: 541380
New
SLED
DEP-BWR-NOI-FY27-WQMG Grant ANNOUNCEMENT ONLY
Solicitation # BWR-WQM-01
The Massachusetts Department of Environmental Protection, through the Bureau of Water Resources Watershed Planning Program, is soliciting grant proposals to support new or ongoing water quality monitoring and data collection. The primary objective is to increase the volume of external data used for water quality assessments under the federal Clean Water Act. Eligible projects include water quality monitoring activities, such as sampling design and data collection, as well as capacity building to support future data submissions. All data must be generated according to MassDEP acceptance criteria and based on an approved Quality Assurance Project Plan. Applications are due by October 22, 2026, and must follow a strict 15-page limit using the provided proposal template. Proposals are scored out of 100 points based on organizational qualifications, the ability to contract within 30 days of award, and the capacity for quality-assured data collection. Priority is given to projects that benefit disadvantaged communities, utilize matching funds, employ collaborative coalition approaches, and target specific priority analytes. Municipalities and academic institutions are ineligible for direct funding, though academic institutions may serve as subcontractors. All awarded work and expenditures must be completed by June 30, 2027.
Testing Laboratories and Services

POSTED

2 days ago

DEADLINE

in 28 days
View Details
NAICS: 541620
SLED
DEP-BWR-NOI-FY27-M36 Grant ANNOUNCEMENT ONLY
Solicitation # BD-27-1045-BWR00-BWR01-133675
The Massachusetts Department of Environmental Protection (MassDEP) is issuing a Request for Interest (RFI) under solicitation number BD-27-1045-BWR00-BWR01-133675 to identify Water Management Act (WMA) registrants and permit holders interested in receiving a free water audit. These audits, which must follow the American Water Works Association (AWWA) M36 methodology, will be conducted by a private consulting firm that MassDEP will procure through a separate competitive process. The program specifically targets Public Water Supplies (PWSs) and municipalities that are not meeting the Unaccounted-for Water (UAW) Performance Standard of 10 percent or less. Depending on previous audit history and data validity scores, eligible entities may receive either a Top-Down Audit or a Bottom-up Component Analysis. Eligible applicants must be PWSs or municipalities with current WMA permits or registrations, and participation is limited to those in compliance with the MBTA Communities Act Law. Preference will be given to projects benefiting Disadvantaged Communities and those with WMA Permits if funds are limited. Selection is based on UAW rates, WMA allocation status, recent improvement efforts, and permit status. Applicants must commit significant personnel time as an in-kind match and affirm that detailed system information for 2025 or 2026 will be available by January 15, 2027, with a final data submission deadline of February 2, 2027. Responses must be submitted via email using the provided application form by October 21, 2026.
Environmental Consulting Services

POSTED

10 days ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS