Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Water Main Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of B2728055.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

PW Bid 2505- RELAY of WATER MAINS in ADAMS AVE from E. WINGOHOCKING ST. to 250' NORTH of UNITY ST

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPennsylvania → Water Department
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs water distribution piping and appurtenances for prime contractors on City of Philadelphia Water Department projects. Installs ductile iron (DI) pipe (3" to 20" diameter), gate valves (4", 6", 8", 12"), mechanical couplings, and DI fittings per Sections 02660 and 02661. Adheres to Philadelphia Water Department Standard Details and Specifications. Delivers a fully installed and tested water distribution system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
Water Line Replacement on S Center Street and Crane Avenue
Solicitation # 24-022
The City of Turlock, California, is soliciting bids for Project No. 24-022, which involves the water line replacement on S Center Street and Crane Avenue. The scope of work includes the installation of approximately 1,677 lineal feet of new PVC water main pipe and new water service laterals, the removal of existing water main pipe, and the restoration of trenches. The Engineer's Estimate for the project is $1,100,000. Bidders must hold a General Engineering Contractor (A) or Pipeline Contractor (C-34) license and provide a bid bond equal to 10% of the total bid. The contract will be awarded to the lowest responsive and responsible bidder based on licensing, insurance compliance, and relevant experience. The project timeline requires work to commence within ten working days of the Notice to Proceed, with substantial completion due within 60 working days and final completion within 65 working days. Substantial delay damages are set at $2,800 per substantial working day and $700 per final working day. The contractor must provide performance and payment bonds each equal to 100% of the contract price and adhere to California prevailing wage rates. Payment will be made via monthly progress invoices, subject to a 5% retention released approximately 35 days after the Notice of Completion. Proposals are due by 11:30 am on November 4, 2026, via the OpenGov Procurement Portal.
Municipal Services-Engineering

POSTED

about 1 hour ago

DEADLINE

in 6 days
View Details
NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 19 days
View Details

More opportunities from Pennsylvania → Water Department

Same awarding agency

New
SLED
PW Bid 2730- TIDE GATES REPLACEMENT in DELAWARE AVE and PENN ST, REGULATING CHAMBER D-46
Solicitation # B2728058
Solicitation B2728058, issued by the City of Philadelphia Water Department, involves the replacement of tide gates at Regulating Chamber D-46, located at Delaware Avenue and Penn Street. The scope of work includes the demolition of manhole rings, concrete repairs, and the installation of various cellular filled stainless steel pontoon tide gates of multiple sizes, as well as concrete-encased PVC instrumentation conduits. The project also encompasses upgrades and rehabilitation for several other chambers, including D-68, D-69, D-70, F-11, S-22, S-24, S-38, and S-42. Key deliverables include the installation of a 72 inch by 48 inch stainless steel pontoon tide gate and frame, with all work adhering to the 2018 Philadelphia Building Code and standards from ACI, AISC, and other civil engineering institutes. The procurement process requires electronic submission via the PHLContracts portal by November 10, 2026, at 10:30 A.M. EST. Prospective bidders must have filed a Questionnaire and Financial Statement for Qualified Sellers by October 22, 2026, and must pay a 400 dollar bid processing fee. Required documentation includes a bid bond and power of attorney, which must be both uploaded and mailed to the Procurement Department. The contract is subject to prevailing wage rates effective October 21, 2026. Pricing includes specific allowances for mechanical street sweeping at 68,000 dollars and a fixed price of 10,000 dollars for the project schedule, alongside various lump sum and linear foot items for chamber rehabilitation and conduit installation.

POSTED

about 21 hours ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS