Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Water Main Installation & Appurtenances

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Fullerton, CA, 92832, USA

Set-Aside

NONE

Documents

This scope was carved out of 53061.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Ash-Woods Area Infrastructure Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fullerton
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs new water main piping and associated hardware for prime contractors on City of Fullerton infrastructure projects. Furnishes and installs PVC water pipes (6" to 12" diameters), gate and butterfly valves, 1" water services, fire hydrant assemblies, and combination air release valve assemblies. Work must conform to the 2024 Greenbook and City of Fullerton Standard Drawings. Delivers a fully installed and pressure-tested water distribution system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
TOWN OF BENNINGTON BENNINGTON, VERMONT WATER RESOURCES DIVISION MONUMENT AVENUE EXTENSION DWSRF RF3-559
Solicitation # DWSRF RF3-559
Solicitation DWSRF RF3-559, issued by the Town of Bennington, Vermont, seeks bids for the general construction of a water main line extension. The project scope encompasses work along Meadowbrook Drive, Southshire Drive, North Terrace Drive, South Terrace Drive, and Hickory Hill Road. Key activities include trenching, removal of asphalt and subbase, installation of water mains, directional drilling, and the placement of thrust blocks, hydrants, curb stops, and service lines. Additionally, the contractor will be responsible for interior residential plumbing connections, well abandonment, and the restoration of roadway base and pavement. Funded in part through the Vermont Drinking and/or Clean Water State Revolving Fund, the project is subject to several federal mandates. These include the Build America, Buy America Act (BABAA) and American Iron and Steel (AIS) provisions, requiring the use of U.S.-produced materials. Labor must comply with Federal Wage Rates under the Davis-Bacon Act. Bidders must provide bid security and, upon award, furnish performance and payment bonds each equal to 100 percent of the contract price. Bids are due by November 19, 2026, at 2:00 pm local time, and must be submitted to the Town of Bennington Department of Public Works.
Department of Economic Development

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline, two soil cement lined dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified disadvantaged, minority, and woman-owned business enterprises across a wide range of NAICS codes related to heavy and specialty construction. Interested parties must submit their responses by October 21, 2026. Primary coordination for this opportunity is handled by Christina Pauls at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 9 hours ago

DEADLINE

in 14 days
View Details

More opportunities from California → City of Fullerton

Same awarding agency

NAICS: 237110
New
SLED
Ash-Woods Area Infrastructure Improvements
Solicitation # 53061
Solicitation 53061 is an invitation for bids issued by the City of Fullerton, California, for the Ash-Woods Area Infrastructure Improvements project. With an engineer's estimate of 2,680,000 dollars, the scope of work focuses on significant underground utility upgrades and surface improvements. Key activities include the abandonment and installation of water main piping and appurtenances, the replacement of sewer main piping and manholes, and the reconnection of sewer house connections. Surface work involves the removal and reconstruction of curbs, gutters, sidewalks, and spandrels, as well as asphalt repair and comprehensive traffic and water pollution control. The project is governed by the 2018 Caltrans Standard Specifications, City of Fullerton Standard Drawings, and the 2024 Greenbook. The contract will be awarded based on the Base Bid, with a response deadline of October 26, 2026, via the OpenGov Procurement Portal. Successful bidders must provide performance and payment bonds totaling 100 percent of the bid amount and adhere to California Labor Code prevailing wage requirements. Performance is subject to strict timelines, including a ten-working-day window for punch list completion and specific five-day deadlines for water main backfilling and final paving. Contractors are required to coordinate inspections with the City and County of Orange, including the presence of a Soils Engineer during earthwork. Administrative requirements include monthly invoicing on company letterhead with a typical 30-day payment cycle and a 250 dollar per day fine for failing to remove construction markings within five days of project conclusion.
Water and Sewer Line and Related Structures Construction

POSTED

about 22 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS