Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Water Main Installation and Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Santa Cruz in California involves the removal of existing water lines and the installation of 1,350 linear feet of new water main for public agency utility projects. The scope of work includes excavating existing lines, laying new pipe, performing bedding and backfilling, and conducting necessary pressure testing to ensure the system is fully operational. The selected contractor must possess a valid utility contractor license and demonstrate full compliance with local municipal water standards. Essential requirements for the project include the provision of all necessary trenching equipment and pipe-laying tools to deliver a completed and tested water main installation.

General Info

Subcontract for installing 1,350 linear feet of water main in Santa Cruz, California.

Agency

California → City of Santa Cruz

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA, 95062

Set-Aside

NONE

Documents

This scope was carved out of Floral Drive Water Main Replacement.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Cruz
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Santa Cruz
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs the removal of existing water lines and installation of 1,350 linear feet of new water main for prime contractors on California-based public agency utility projects. Excavates existing lines, lays new water pipe, performs bedding, backfilling, and pressure testing. Requires trenching equipment and pipe-laying tools. Utility contractor license and compliance with local municipal water standards required. Delivers 1,350 linear feet of installed and tested water main.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel and Build America, Buy America requirements. The scope of work is comprehensive, encompassing pipeline and infrastructure tasks such as welding, cathodic protection, jack and bore, and the installation of pipes and valves. It also includes civil site work like paving, striping, flatwork, fencing, and potholing, as well as technical services including videography, settlement monitoring, survey, and electrical and instrumentation and control. Additional requirements include SWPPP compliance, traffic control planning, and asbestos pipe demolition and removal. This solicitation is open to a wide range of small business set-asides, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone, and Veteran-Owned Small Businesses. Filanc is actively seeking quotes for various specialized scopes and strongly encourages participation from SBE, MBE, and WBE firms, offering assistance with equipment, supplies, and insurance to qualified small businesses. Bids are due by September 23, 2026, and interested parties can obtain plans and specifications by contacting Julia Masaitis. The project emphasizes equal opportunity and non-discrimination in all business dealings.
Filanc

POSTED

about 6 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional structural requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. The project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. James W. Fowler Co. provides specific support for M/W/DBE subcontractors, including assistance with equipment, materials, bonding, lines of credit, and insurance. Bids are due by September 29, 2026, with all negotiations required to be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 6 hours ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS