Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Water Main Installation & Utility Work

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of 26-0338.

The full solicitation package (13 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

PW 2026 CDBG Campbell Street Improvement Project, City Project No. 107033

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → City Of Fort Worth
ContactsNo contacts available
OfficeN/A
Organization / AgencyTexas → City Of Fort Worth
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs and replaces municipal water distribution infrastructure for prime contractors on City of Fort Worth projects. Installs DR-14 PVC and poly-wrapped Ductile Iron mains, gate valves, corporation stops, and fire hydrants. Replaces 3/4" service lines with 1" Type K copper. Performs cathodic protection studies and pressure testing. Delivers a commissioned water distribution system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with full HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified DBE, MBE, and WBE firms across a wide range of NAICS codes related to heavy and civil engineering construction, as well as specialty trade contractors. Interested parties must submit their responses by October 21, 2026. Primary contact for this opportunity is Christina Pauls in the estimating department.
GSE Construction Co., Inc.

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires the furnishing of all necessary materials, tools, and equipment. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and compaction testing. This solicitation is specifically targeted toward DBE, MBE, WBE, and SBE firms, with the prime contractor encouraging the formation of consortiums for larger portions of the work. Subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors may be required to provide payment and performance bonds totaling 100 percent of their bid, with bond premiums reimbursed up to 1.5 percent. All quotations must be submitted to Estimating Manager Matt Metoyer by the deadline of October 19, 2026.
W.A. Rasic Construction Company

POSTED

about 4 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Texas → City Of Fort Worth

Same awarding agency

NAICS: 237310
New
SLED
PW 2026 CDBG Campbell Street Improvement Project, City Project No. 107033
Solicitation # 26-0338
The 2026 CDBG Campbell Street Improvement Project (City Project No. 107033) is a construction solicitation issued by the City of Fort Worth, Texas, for comprehensive street improvements. The scope of work includes the installation of 2,500 linear feet of 7-inch curb and gutter, 3,800 square feet of 6-inch concrete driveway, 12,000 square feet of 4-inch concrete sidewalk, and 4,700 square yards of 3-inch Superpave SP-D asphalt pavement. Additional requirements involve 4,700 square yards of 11-inch pavement pulverization, 76 tons of Cemlime, and the construction of 18 barrier-free ADA ramps. The project also encompasses utility work, site clearing, tree removal, and adherence to USACE and railroad permits. The contract will be awarded to the lowest responsible and responsive bidder, with a required completion timeline of 180 days from the start of contract time. Liquidated damages for delays are set at 650 dollars per day. Bidders must be prequalified and submit a comprehensive package via the Bonfire portal by October 29, 2026, including a bid bond, conflict of interest statement, and workers compensation compliance. Awarded contractors must provide performance, payment, and maintenance bonds, and comply with Texas Government Code prevailing wage rates and small business utilization goals. The City maintains strict quality standards for earthwork, structures, and paving, with the contractor responsible for all quality control testing.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS