Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on April 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Main Relocation – Underground Utility Construction

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

This subcontract opportunity, managed by the California Public Works agency, involves a water main relocation project focused on underground utility construction. The scope of work requires the removal of 500 linear feet of existing 8-inch water main and the subsequent installation of 524 linear feet of new 8-inch C900 PVC water main, including all necessary valves, couplings, and appurtenances. The project is categorized under NAICS code 237110. Interested parties must submit their responses by the deadline of May 27, 2025, following the posting date of April 24, 2025.

General Info

Documents

This scope was carved out of CIP 60178.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

El Camino Real Water Main Improvements Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removal of 500 LF of existing 8-inch water main and installation of 524 LF of new 8-inch C900 PVC water main with valves, couplings, and appurtenances.

More opportunities from California → Public Works

Same awarding agency

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Highway, Street, and Bridge Construction

POSTED

about 9 hours ago

DEADLINE

in 23 days
View Details
NAICS: 541330
New
SLED
Citywide Active Transportation Plan RFP
Solicitation # 2026-11 (ATP)
The City of Tustin is seeking a qualified engineering and planning firm to develop a Citywide Active Transportation Plan (CATP). The project focuses on technical analysis, conceptual designs, and the creation of an implementation strategy, with a specific emphasis on public outreach targeting underserved populations, schools, and vulnerable roadway users. Key deliverables include 30 percent engineering concept plans for the top five ranked infrastructure projects, a comprehensive financial plan, and ADA-accessible electronic copies of all deliverables. The project is funded by the Caltrans Sustainable Transportation Planning Grant Program, with a maximum reimbursable amount of $425,000. Selection is based on a qualifications-based ranking process rather than cost, evaluating staffing, technical approach, public outreach experience, resource allocation, and client references. The successful consultant must comply with state funding requirements, maintain a city business license, and provide professional liability insurance, including tail insurance for five years post-completion. All accounting must conform to GAAP and 2 CFR Part 200, with reimbursement based on actual allowable costs. Proposals must be submitted via OpenGov by January 13, 2027, and must include a non-discrimination certification and a non-collusion affidavit.
Engineering Services

POSTED

about 11 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
West Linda Multi-Use Basin Phase II Project
Solicitation # 3260070
The West Linda Multi-Use Basin Phase II Project (Contract No. 3260070) is a general construction solicitation issued by the Yuba County Public Works agency in California. With an estimated cost of $1,121,293.00, the project involves infrastructure improvements at the West Linda Detention Basin, including the construction of parking lot improvements, a multi-use path, a ramp to the basin, workout and bench areas, storm drains, and landscape enhancements. The work must be performed in accordance with 2025 Caltrans Standard Plans and Yuba County Improvement Standards. The project timeline is divided into three milestones: general work must be completed within 60 working days, plant establishment within 90 working days, and total project completion within 150 working days. Bids are due by 2:00 p.m. on November 19, 2026, and will be awarded to the lowest responsive and responsible bidder. Submissions must be sealed and include a bid bond or cashier's check for 10 percent of the total bid price. The successful contractor is required to provide separate performance and payment bonds, maintain insurance for the contract duration plus five years, and adhere to prevailing wage laws. Key compliance requirements include a Quality Assurance Program for material testing, a Worker Environmental Awareness Program for tribal cultural resources, and strict adherence to environmental commitments regarding dust control and biological protections. There is no DBE goal for this project, and no pre-bid meeting is scheduled.
Highway, Street, and Bridge Construction

POSTED

about 13 hours ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS