Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

El Camino Real Water Main Improvements Project

Closed
CIP 60178State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include the installation of new gravity sewers, manholes, stormwater facilities, and site restoration. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and compliance with M/WBE requirements, including the submission of Good Faith Efforts forms. Bidders must adhere to strict technical standards, such as AWWA Specification C-600 for pipelines and NEMA standards for motors. Contract administration is managed by Willis Engineers on behalf of the City of Belmont, utilizing EJCDC standard forms for agreements and payment applications. Required security includes performance and payment bonds, and insurance providers must typically maintain an A.M. Best rating of A-VII or better.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The City of Tustin is soliciting sealed bids for the El Camino Real Water Main Relocation Project (CIP No. 60178), which involves significant infrastructure work along El Camino Real in Tustin, California. The project scope includes the removal and disposal of approximately 500 feet of existing 8-inch water main, the removal of a fire hydrant, and the abandonment of existing service laterals. New water mains, located three feet north of the original centerline, will be installed along with new fire hydrant assemblies, service laterals, and meters. The work also encompasses asphalt restoration and striping to restore the roadway after construction. Bidders are required to provide all labor, materials, tools, equipment, and incidentals necessary to complete the project as per the plans, specifications, and contract documents. The project is estimated to cost between $500,000 and $1,500,000 and is managed by the City of Tustin’s Public Works Department. The solicitation was posted on April 24, 2025, with a response deadline of May 27, 2025. Interested bidders can contact Eric Johnson via email or phone for further information. The project aims to improve water infrastructure along a key section of El Camino Real, ensuring proper installation, safety, and roadway restoration in accordance with city standards. More details and the bid portal are accessible through the provided online link.

General Info

Documents

1
PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → Public Works
Office AddressN/A

Full Description

Show more
NOTICE IS HEREBY GIVEN that the CITY OF TUSTIN, as AGENCY invites sealed bids for the El Camino Real Water Main Relocation Project (CIP No. 60178) and will receive sealed bids for the construction, materials, supplies, equipment and/or services set forth herein, subject to all conditions outlined in the Bid Package.Scope of Work:This work shall consist in part of furnishing all labor, materials, tools, equipment and incidentals as required by the plans, specifications and contract documents for the above stated project. The work to be done hereunder consists of removal and disposal of approximately 500 feet of existing 8 inch water main located on south side of street, removal and disposal of one fire hydrant, abandonment of existing service laterals, installation of new water main located 3 feet north of centerline and appurtenances, installation of new fire hydrant assembly, installation of new service laterals and meters, asphalt restoration, and striping.  All work as detailed on the plans and specified herein or as customarily necessary to complete the intent of the proposed work.The project site is located in the City of Tustin, County of Orange, California, on El Camino Real from 650 feet east of Red Hill Avenue to 1,150 feet east of Red Hill Avenue.

More opportunities from California → Public Works

Same awarding agency

NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim to improve roadway structure and pedestrian safety. The scope of work includes removing and reconstructing asphalt concrete pavement using rubberized asphalt concrete, installing ADA access ramps, sidewalks, curb and gutter, and adjusting utility pull-boxes. The project also encompasses the installation of striping, signage, and pavement markings. Work is located on Katella Avenue from Auburn Way to Douglass Road and State College Boulevard from Katella Avenue to Gene Autry Way. The estimated construction cost has been updated to 5,041,243.00 dollars, with a performance period of 70 working days from the Notice to Proceed. The contract is governed by the 2024 Standard Specifications for Public Works Construction and specific project special provisions. Award will be granted to the lowest responsive and responsible bidder holding a General Engineering (A) license. Bidders must be registered with the Department of Industrial Relations and agree to be bound by the Community Workforce Agreement. Key submission requirements include a 10 percent bid bond, a non-collusion declaration, and the use of the OpenGov portal for proposals. Performance is subject to strict scheduling, with work affecting CALTRANS Right-Of-Way restricted to overnight hours between 10:00 p.m. and 5:00 p.m. Monday through Friday. Final payment is contingent upon the approval of As-Built Plans submitted 21 days prior to the final invoice.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 561730
New
SLED
Independence Jail Landscaping
Solicitation # ZP 24-020
The Independence Jail Landscaping project, managed by the Inyo County Public Works Department under solicitation ZP 24-020, involves comprehensive landscaping services including excavation, grading, irrigation installation, and planting. The project requires a contractor with at least one year of landscaping experience and a valid CA State License Board number. Key technical requirements include adherence to the Model Water Efficient Landscape Ordinance (MWELO), the provision of a Soil Management Report, and the implementation of an irrigation system with a distribution uniformity low quarter of 0.65 or higher. The contractor is responsible for providing all labor, materials, and equipment, as well as delivering training on planting techniques and ongoing maintenance. All work must comply with the 2010 Americans with Disabilities Act (ADA), Inyo County Public Works Standard Specifications from May 2020, and prevailing wage rates. Bids must be submitted electronically via the OpenGov portal by December 11, 2026. Required submission materials include a bid proposal, vendor certifications, and a proposal guarantee of ten percent of the total bid amount. Upon contract award, the contractor must provide a Faithful Performance Bond and a Labor and Materials Payment Bond, both for 100 percent of the contract amount. The estimated construction cost for the project is 97,140.00. Final acceptance is contingent upon a Certificate of Completion certified by a licensed landscape contractor or architect, supported by as-built drawings, irrigation audit reports, and soil analysis documentation.
Landscaping Services

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
Etnies Skatepark Improvement Project (25P03)
Solicitation # 25P03
The City of Lake Forest is soliciting proposals for the Etnies Skatepark Improvement Project (25P03) to modernize its 62,000 square foot facility. The selected consultant will refine two preliminary concept designs into a final design and prepare a complete, bid-ready Plans, Specifications, and Estimates (PS&E) package. Key project enhancements include the addition of an 8,000 square foot all-wheel pump track, improvements to street lanes, the street plaza, and various bowls, the removal and replacement of the cradle, and the integration of public art. The consultant must coordinate with a separate ongoing project for skatepark building renovations and develop a construction phasing plan that minimizes operational disruptions. Proposals are due by December 4, 2026, and must be submitted via the City's eProcurement portal. The prime consultant can be any qualified firm providing a team with expertise in public skatepark design, municipal civil engineering, and public art. Evaluation is based on a pass/fail review of licenses and conflicts of interest, a qualitative assessment of technical knowledge, and a cost proposal evaluated on a time and materials, not-to-exceed basis. The anticipated project start date is February 9, 2027, with an initial contract term running through January 19, 2030, and options for two additional one-year extensions. Consultants who prepared the preliminary concept designs are ineligible to participate in this phase.
Engineering Services

POSTED

2 days ago

DEADLINE

in 26 days
View Details
NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The City of Tustin is soliciting bids for the Tustin Legacy Linear Park Phase 3 project (CIP No. 20083), located between Armstrong and Warner. This construction project involves the development of a multi-modal park featuring a 12-foot main multi-modal path, a 6-foot secondary walking trail, a playground with PIP rubber surfacing, fitness pods, and an Esplanade along Compass Avenue using concrete pavers. Additional scope includes landscaping, irrigation, pedestrian and street lighting, and the implementation of a planted bioretention swale for stormwater management in compliance with Orange County NPDES requirements. The engineer's estimate for the project is 11,100,000 dollars, with a construction duration of 190 working days and a subsequent 90-working-day plant establishment and maintenance period. Bids are due electronically via OpenGov by December 10, 2026, at 2:00 PM PT, with a mandatory hard copy of the bid bond delivered to the City Clerk. The contract will be awarded to the apparent low bidder who meets all responsiveness requirements, including the submission of a Class A contractor's license, project references, and a list of subcontractors for work exceeding 0.5 percent of the total bid. Awarded contractors must provide payment, faithful performance, and guaranty bonds within 10 working days of notification. Payment will be issued through monthly progress payments at 95 percent of the work value, with the final 5 percent retained until 60 days after the recordation of the Notice of Completion. All work must adhere to 2008 ADA Standards for Accessibility and Cal-OSHA safety requirements.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS