Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Water Meter Installation

Active
BD-26-1585-TWR01-TWR01-132369State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Town of Rutland Department of Public Works is soliciting bids for the installation of water meters and AMI endpoints in accordance with M.G.L. c. 30, 39M. The selected contractor will provide all necessary labor, materials, equipment, and supervision to remove existing meters and install approximately 440 owner-supplied water meters, registers, and AMI endpoints at various residential and commercial properties throughout the town. This solicitation, identified as BD-26-1585-TWR01-TWR01-132369, was posted on August 19, 2026, with a response deadline of September 3, 2026. The project will be performed in Rutland, Massachusetts, and the primary point of contact for this procurement is Heather Butler.

General Info

Rutland DPW seeks bids to install 440 water meters and AMI endpoints.

Agency

Massachusetts → TWR01 - Department of Public WorksView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Main Street Rutland, MA, 01543, USA

Set-Aside

NONE

Documents

(1)

commbuys-source-page-BD-26-1585-TWR01-TWR01-132369.html

HTML

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMassachusetts → TWR01 - Department of Public Works
Contacts1 person available
OfficeMain Street Rutland, MA, 01543, USA
Organization / Agency
Massachusetts → TWR01 - Department of Public Works
View Agency Profile
Office AddressMain Street Rutland, MA, 01543, USA
Contacts
Heather ButlerPurchaser

Full Description

Show more
installation of water meters and AMI endpoints in accordance with M.G.L. c. 30, 39M. The work generally consists of furnishing all labor, materials, equipment, supervision, and incidentals necessary to remove existing water meters and install approximately 440 owner-supplied water meters, registers, and AMI endpoints at residential and commercial properties throughout the Town

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
LOCHAB Borehole Drilling Services
Solicitation # 19KE5026Q0082
The American Embassy Nairobi, under the Department of State, is soliciting proposals for borehole drilling services at the LOCHAB construction site in the Runda Area of Nairobi. This firm fixed price contract, identified as solicitation 19KE5026Q0082, involves drilling a 360-meter deep borehole, installing steel casings and screens, performing physical and chemical development, and conducting aquifer testing. The scope also includes the procurement and installation of a Grundfos SP17-27 pump with a 15KW-20HP motor and a logic control panel. The estimated contract value ranges from 25,000 to 100,000 USD. Award will be granted to the lowest priced, acceptable, and responsible quoter who meets all pass/fail gates, including SAM registration and technical qualifications. The selected contractor must begin performance within five calendar days of the award and complete all work within 30 construction days. Key requirements include providing an English-speaking on-site supervisor, maintaining a permanent business address in Kenya, and holding certifications from the National Contraction Authority, National Environmental Management Authority, and Water Resources management. Financial obligations include a bank guaranty of 20 percent of the contract price during performance and 10 percent during the guaranty period, as well as Defense Base Act insurance for employees. Invoicing must be submitted electronically via the my ILMS portal, with payments made in local currency via Electronic Funds Transfer within 30 days of a proper invoice. Proposals must be submitted electronically to nairobigsofp@state.gov by the deadline of August 19, 2026.
American Embassy Nairobi

POSTED

about 16 hours ago

DEADLINE

in about 3 hours
View Details
NAICS: 237110
New
Federal
Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
Solicitation # W912PF26RA011
This construction project at the Miotto Military Installation in Longare, Vicenza, Italy, is a Design-Bid-Build effort to remediate critical failures in the stormwater and sanitary sewer systems to achieve environmental compliance and mitigate flood risks. The scope requires comprehensive repairs, upsizing, and decoupling of cross-connected sewer lines to ensure independent discharge pathways, along with extensive site restoration driven by recent storm damage including soil erosion and landslide vulnerabilities. Key work includes installing a new underground TOC pipe to directly connect to the Bisatto River using established rights-of-way, constructing a stormwater lamination tank beneath a municipal sports field in accordance with Italian Genio Civile regulations, and replacing the field’s surface with synthetic turf over the tank. Additional features involve integrating natural stormwater management elements such as sedimentation tanks, retention ponds, and weir walls to slow and control runoff before discharge. The project includes optional scope items for asbestos pipe removal, landslide area stabilization, and sedimentation pond installation, each as separately priced line items. All work must adhere to U.S. Department of Defense Unified Facilities Criteria including UFC 1-200-01 for building standards, UFC 1-200-02 for sustainable design, and UFC 3-560-01 and UFC 3-600-01 for electrical safety and fire protection, while also complying with CSI MasterFormat and UFGS specification frameworks. Construction must follow a strict five-day work week with weekends and holidays excluded, and traffic on internal roads must remain accessible at all times with alternate one-way flows and sensor-equipped traffic lights. The contract has an estimated performance period of approximately three years, with phase one requiring all external works to commence and complete between September 2026 and September 2027 as mandated by local Italian authorities. Submission of detailed documentation is mandatory, including a visual review report, clash detection report, record model with as-built drawings, and a professionally sealed specification cover sheet. All technical data must be fully legible and consistent with manufacturer documentation, and system sensors and thermostats must be accurately reflected on as-built records. Quality assurance requires the contractor to maintain a Design Quality Control plan meeting professional engineering standards, while the government retains the right to audit submittals without relieving the contractor of responsibility for contract compliance. Final acceptance is contingent upon certification and testing as required by Italian law, with revisions to submitted data needing completion within 30 calendar days. Compliance with stringent security protocols includes restricted information disclosure,
0414 Aq Hq Contract Augmented

POSTED

about 16 hours ago

DEADLINE

in 8 days
View Details