Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Water Pollution & Erosion Control

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity involves providing installation and maintenance services for water pollution and erosion control measures on Caltrans construction projects. The scope of work includes the deployment of temporary check dams, fiber rolls, silt fences, construction entrances, concrete washout facilities, and drainage inlet protection. Additionally, the contractor is responsible for implementing temporary creek diversions using pumping systems and exclusionary screens in strict accordance with SWPPP and WPCP standards, as well as restoring disturbed areas. The project is managed by the State of California Department of Transportation under NAICS code 238910. Interested parties must submit their responses by the deadline of December 9, 2026. Performance of the contract will take place in California, specifically within the 95445 zip code area.

General Info

Installation and maintenance of water pollution and erosion controls for Caltrans in California.

Documents

This scope was carved out of 01-0C72U4.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Reconstruct Roadway And Drainage System, & Construct ADA Facilities

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs installation and maintenance of water pollution and erosion control measures for prime contractors on Caltrans construction projects. Installs temporary check dams, fiber rolls, silt fences, construction entrances, concrete washout facilities, and drainage inlet protection. Implements temporary creek diversion using pumping systems and exclusionary screens per SWPPP and WPCP standards. Delivers installed BMPs and restored disturbed areas.

Similar Contracts

Same NAICS industry code

More opportunities from California → STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In San Diego County In Oceanside From Route 5/76 Separation To 0.3 Mile East Of Melrose Drive
Solicitation # 11-430914
Solicitation 11-430914 is a construction project for the State of California Department of Transportation involving highway work in Oceanside, San Diego County, from the Route 5/76 separation to 0.3 mile east of Melrose Drive. The scope of work primarily includes cold planing of AC pavement and RHMA-G overlay. The project timeline allows for 260 working days for general work and 250 working days for plant establishment, totaling 510 working days when including plant establishment. Bids must be submitted on a unit price basis via the Bid Express website by 2:00 p.m. on December 16, 2026, and must include bidder's security equal to at least 10 percent of the bid. The contract mandates strict adherence to 2025 Standard Specifications and Plans, including Buy America/Build America requirements and the use of LCPtracker Pro for electronic certified payroll records. Key technical requirements include specific packaging and stainless steel labeling for fiber optic cables, as well as rigorous quality control testing for bond strength and coefficient of friction. Contractors must designate an on-site safety representative with Cal/OSHA 30-hour or OSHA 510 certification. Payment is managed through the Department's prompt payment monitoring system, with specific requirements to pay subcontractors within 7 days and material suppliers within 30 days of receiving progress payments. Special provisions also cover the management of hazardous waste residue from yellow thermoplastic traffic stripes and compliance with ADA inspection reporting.
Highway, Street, and Bridge Construction

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In San Bernardino County Near Baker At Telephone Wash Bridge And From 4.1 Miles North Of Cima Road Overcrossing To 2.9 Miles North Of Nipton Road Overcrossing
Solicitation # 08-1L5304
Solicitation 08-1L5304 is a unit price basis contract issued by the State of California Department of Transportation for highway construction in San Bernardino County near Baker. The project focuses on the Telephone Wash Bridge and the stretch of highway from 4.1 miles north of Cima Road Overcrossing to 2.9 miles north of Nipton Road Overcrossing. The estimated project cost is 10,800,000 dollars. The scope of work includes thermoplastic traffic striping, partially grouted rock slope protection, roadway excavation, and hot mix asphalt paving. Specialized bridge maintenance is required for structures 54-0303L/R and 54-0316L/R, involving the installation of epoxy coated, stainless steel, and carbon fiber reinforced polymer bars, as well as concrete barrier work. Additional requirements include vegetation control, guardrail installation, erosion control, and the removal of desert tortoise fencing. To be eligible for award, contractors must hold a Class A license or a combination of Class C licenses (C-12, C-32) and must attend a mandatory virtual prebid meeting. Bids must include security equal to at least 10 percent of the bid amount. The project mandates strict adherence to Buy America requirements for iron, steel, and manufactured products, and requires the payment of prevailing wages. Environmental and safety compliance is critical, including specific packaging and labeling for asbestos-containing materials and the designation of an on-site safety representative. Job site activities must commence within 55 days of contract approval, following the submission of a 72-hour notice and the approval of required material submittals. Performance is governed by the 2025 Standard Specifications and Standard Plans, with grade quality control conducted via GNSS rover or robotic total station equipment.
Highway, Street, and Bridge Construction

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS