Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on June 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Reclamation Facility Projects Prequalification

Closed
OWRFPreQualState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 9 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 16 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The City of Orem is seeking to prequalify contractors for a series of major infrastructure projects at the Water Reclamation Facility (OWRF) expected to be solicited over the next five years, with an estimated total construction value between $65 million and $80 million. This prequalification effort, identified by solicitation number OWRFPreQual and issued under NAICS code 237990, requires contractors to demonstrate extensive experience in constructing and integrating complex wastewater treatment systems, including critical components such as headworks screening, grit removal, primary and secondary treatment, UV disinfection expansion, dewatering facilities, biosolids conditioning, and associated control systems. Submitters must provide detailed documentation of past project experience, particularly in active wastewater facilities in Northern Utah, along with resumes and summaries for key personnel including a Project Manager, Project Engineer, and Superintendent, each meeting minimum experience thresholds and specific technical requirements. Contractors must also submit certified financial statements, proof of bonding capacity with a minimum of $50 million available, and demonstrate sustained financial stability over five consecutive years, along with evidence of insurance coverage including general liability at $6 million per occurrence, automobile liability at $6 million per accident, and workers’ compensation with employer’s liability of at least $1 million. Contractors must be duly licensed in Utah, maintain a permanent safety program, and comply with Utah Code Annotated 63G-11-103 regarding immigration status. Insurance carriers must hold a Best Insurance Reports rating of “A” or better and financial size category “VII” or higher. Evaluation is based on a weighted scoring system totaling 102 percent, emphasizing experience working in active wastewater facilities, managing project integration including PLC/SCADA systems, value engineering, financial condition, construction methods, direct bid or CMGC delivery experience, ability to execute multiple concurrent projects, project closeout competency, handling owner-furnished equipment, and demonstrated local presence and familiarity with similar projects. Additional evaluation criteria include safety performance metrics over the past four years, such as the Experience Modification Rate and OSHA reportable accident rates. Proposals must be submitted in hard copy—three copies—and one electronic PDF on a flash drive to the City of Orem Public Works by 2:00 p.m. on July 9, 2026. Contractors must also certify that they are not debarred or suspended from federal programs, have not been refused surety or insurance in the past decade, and confirm the accuracy and completeness of all submitted

General Info

City of Orem prequalifies contractors for multi-phase OWRF upgrades due July 9, 2026.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

2

City of Orem WRF Contractor Prequalification Requirements June 2026

PDF, High priority: read this firstprequalification-requirements
High

Contractor Questionnaire for City of Orem Water Reclamation Facility Prequalification

PDF, High priority: read this firstquestionnaire
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
ContactsNo contact information available

Full Description

Show more
The purpose of this packet is to prequalify Contractors for several upcoming projects at OWRF, expected to be solicited in the next 5 years. The submittal requirements for the prequalification statement and the evaluation criteria are included.
The City of Orem Water Reclamation Facility (OWRF) was constructed in 1953 with major upgrades in 1983 and 2010. The City completed a Capital Facilities Master Plan for the Water Reclamation Facility (WRF) in 2022. This plan recommended strategic upgrades to the facility over the 20-year planning horizon to keep the facility safe, effective, efficient, operational, and able to meet all current and anticipated treatment standards. OWRF liquid stream includes preliminary treatment, primary treatment, secondary treatment (bioreactors, oxidation ditches and clarifiers), tertiary treatment and UV disinfection. The solids process includes thickening, thermophilic and mesophilic digestion and dewatering. OWRF also includes various support facilities comprising but not limited to electrical buildings, pump stations, odor control systems, and control systems. The masterplan identified various projects associated with the facility liquid, solids and support facilities including upgrades to existing facilities and/or addition of new facilities and structures. The City is currently working on designs for several of these projects, including the following: • New Headworks Screening and Grit Removal Facility; • New Primary Effluent Pump Station and upgrades to RAS Pump Station; • BNR system upgrades • UV Disinfection Facility Expansion • New Dewatering Facility with Administrative, Lab, and Office Spaces • New Biosolids Conditioning System housed within its Mesophilic Digester Building • Other projects listed in the OWRF masterplan – Phase 1 Projects.

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

1 day ago

DEADLINE

in 9 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS