Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Water Service Installation (Trenchless & Open Cut)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the installation of new copper water service lines for prime contractors working on lead service replacement projects for the City of Aurora. The scope of work includes the installation of 1, 1.5, and 2 inch copper services utilizing both open cut methods and trenchless directional drilling or boring. The contractor is responsible for connecting to existing service taps and curb stops, plugging abandoned services, and ensuring the delivery of fully operational water service lines from the main to the meter. All work must be performed in strict adherence to IDOT standards and the City of Aurora General Specifications. This opportunity is categorized under NAICS code 237110 and is managed by the Engineering agency in Illinois. Interested parties must submit their responses by the deadline of October 30, 2026.

General Info

Install copper water service lines for City of Aurora by October 30, 2026.

Documents

This scope was carved out of 26-106.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2027 & 2028 On-Call Lead Water Service Line Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Engineering
ContactsNo contacts available
OfficeN/A
Organization / AgencyIllinois → Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs new copper water service lines for prime contractors on City of Aurora lead service replacement projects. Performs installation of 1", 1.5", and 2" copper services using trenchless directional drilling/boring and open cut methods. Connects to existing service taps and curb stops/boxes and plugs abandoned services. Adheres to City of Aurora General Specifications and IDOT standards. Delivers fully operational copper water service lines from main to meter.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Illinois → Engineering

Same awarding agency

NAICS: 423610
New
SLED
Lighting Materials 2027
Solicitation # 26-090
The City of Aurora, Illinois, is soliciting bids under solicitation number 26-090 for the purchase and delivery of street lighting materials, including luminaires, drivers, poles, and bollards. This is a materials-only contract that excludes installation, with deliveries to be made to the City's Public Works Facility at 2100 E. New York Street. The contract will be awarded to the lowest responsive and responsible bidder based on factors such as price, bidder qualifications, product quality, and delivery timelines. While the City will consider equivalent alternative brands provided they are pre-approved via submitted specifications, the GE Cobra Head fixtures must be the exact products requested to ensure city-wide aesthetic and maintenance consistency. The initial contract term runs for one year from January 1 to December 31, with the City reserving the option to renew for two additional one-year periods in 2028 and 2029 upon mutual agreement. Bidders must submit their proposals exclusively through the OpenGov electronic procurement system by the November 4, 2026, deadline. Awardees are required to comply with various legal certifications, including the Illinois Criminal Code, the Drug Free Workplace Act, and prevailing wage requirements. Although performance and payment bonds are not required, the successful bidder may need to provide insurance for public liability, property damage, and workers compensation.
Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers

POSTED

about 5 hours ago

DEADLINE

in 15 days
View Details
New
SLED
Electrical Materials 2027
Solicitation # 26-112
The City of Aurora, Illinois, is soliciting bids under solicitation number 26-112 for a materials-only contract to provide electrical supplies, including lamps, controls, fuses, and splicing materials, for various projects throughout the city. The contract does not include installation services. The City will utilize a unit-price model, adopting the lowest responsive and responsible bidder's prices for individual items to allow the Electrical Division to procure materials as needed based on 2027 estimated quantities. The initial term begins January 1, 2027, for one year, with the option for two subsequent one-year renewals through 2029 upon mutual agreement. Award decisions will be based on the lowest responsive and responsible bidder, considering factors such as bidder qualifications, past performance, product quality, and delivery capabilities. Bidders must be prime vendors and submit all proposals electronically via the OpenGov portal by November 4, 2026. Requirements for submission include a signed Terms and Conditions Acknowledgment, contact information, a compliant Certificate of Insurance, and various certifications regarding ethics, drug-free workplaces, and Illinois prevailing wage laws. All provided goods must comply with OSHA and State of Illinois safety codes, and the final purchase price must include all transportation and handling charges for delivery to the City's destination.

POSTED

about 5 hours ago

DEADLINE

in 15 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS