Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Water Storage Reservoirs and Community Forest Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Fort Bragg

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Highway 20 and Summers Lane, Fort Bragg, CA, 95437

Set-Aside

NONE

Documents

(6)

Notice of Preparation for Water Storage Reservoirs and Community Forest Project

PDFnotice-of-preparation

Notice of Completion to accompany Notice of Preparation

PDFnoc

Notice of Preparation for Water Storage Reservoirs and Community Forest Project EIR

PDFpresolicitation

2025070350_DWR_Comment - DSOD Jurisdictional Review Letter

PDFcomment-letter

2025070350_CDFW_Comment on Fort Bragg Water Storage Reservoirs EIR

PDFcomment

2025070350 NAHC Comment on Water Storage Reservoirs Project

PDFcomment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fort Bragg
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Fort Bragg
Office AddressN/A
Contacts
Diane O'ConnorAssistant City Engineer

Full Description

Show more
The proposed project includes construction of three raw water reservoirs and development of a publicly-accessible community forest. Each reservoir would have a storage capacity of 45 acre-feet (approximately 14.6 million gallons), for a combined storage capacity of 135 acre-feet (approximately 44 million gallons). The reservoirs would be located approximately 0.3 mile southeast of Summers Lane Reservoir, north of an existing dirt road and south of the PG&E utility easement. The project would include a lot line adjustment such that the three reservoirs are within one parcel. A raw water pipeline, approximately 5,000 feet in length, would travel along the reservoirs to the northwest and would turn east at Summers Lane Reservoir to connect to the City’s existing water infrastructure. The reservoirs would be filled during the winter with water pumped up from the Noyo River or from Waterfall Gulch. Water would be drawn from the reservoirs during summer when flows in the channels are low, reducing the impact on aquatic species. The water would flow primarily by gravity to the City’s Water Treatment Plant. A two-bedroom, two-bathroom caretaker unit and storage building would be constructed adjacent to the Summers Lane Reservoir, on APN 019-070-11. A second caretaker unit may also be constructed. Figure 3 shows the proposed conceptual site plan. The proposed community forest, which would encompass the remainder of the project site, may include public trails throughout the project site. A trailhead, parking lot, and vault toilet would be constructed at an existing disturbed site approximately 750 feet north of Highway 20 and Gravel Pit Road. The parking lot would be approximately 1,800 square feet.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 10 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 10 hours ago

DEADLINE

in about 22 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS