Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on February 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WATER SYSTEM IMPROVMENTS - DIVISION II

Closed
PE-66713-NONST-2026-000000004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

Sale City, Georgia, is soliciting sealed bids for the construction of Water System Improvements – Division II, with submissions due by 11:00 AM local time on March 19, 2026, at Sale City Hall. The project includes multiple key components such as the modification of main and backup wells, replacement of existing water meters with approximately 214 new AMR water meters of various sizes, installation of backflow preventers, and provision of meter reading devices along with required software and training. Additionally, the work involves installing a new 150KW standby diesel generator complete with control panel, enclosure, transfer switch, concrete pad, electrical appurtenances, and startup services. The contract also covers the replacement of approximately 731 linear feet of 8-inch PVC water main and 183 linear feet of 6-inch PVC water main, along with necessary fittings, valves, fire hydrants, and service connections, all as detailed in the contract documents. Bids will be accepted as a single prime contract on a lump sum or unit price basis, with potential alternate bid items as indicated. The issuing office for bid documents is Still Waters Engineering in Leesburg, GA. This construction project is subject to the Build America, Buy America Act requirements and is expected to be funded wholly or partially by the Georgia Environmental Finance Authority’s Drinking Water State Revolving Fund loan, making it subject to Georgia's supplemental conditions for federally assisted construction contracts. Questions or communications can be directed to the primary contact, Geraldine Bond, via email or phone provided.

General Info

Sale City seeks bids for water system upgrades, meters, generator, PVC mains; due March 19, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Sale City
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Sale City
Office AddressN/A

Full Description

Show more
Sealed Bids for the construction of the Water System Improvements ¿ Division II will be received, by Sale City, at the Sale City - City Hall ¿ 122 East Broad Street, Sale City, GA 31784, until 11:00 AM local time on March 19, 2026, at which time the Bids received will be publicly opened and read. The Project consists of main well modifications, back-up well modifications, replacement of existing water meters with new AMR water meters (more specifically provide and install +/- 180 - 5/8¿ x 3/4¿ AMR water meters, +/- 25 ¿ 1¿ AMR water meters, +/- 9 ¿ 2¿ AMR water meters, +/- 214 backflow preventers, furnishing meter reading device/associated necessary software & facilitating training), providing and installing 1 new 150KW/187.5KVA, 480/277V, 3 phase, 4 wire standby diesel generator, along with generator control panel, generator enclosure, non-automatic transfer switch, concrete generator pad, complete electrical appurtenances, generator start up services, and all additional appurtenances needed for complete installation, along with the replacement of +/- 731 LF of water main with new 8¿ PVC water main and +/- 183 LF of water main with new 6¿ PVC water main, including fittings, valves, fire hydrants, services and all other items indicated in these Contract Documents. Bids will be received for a single prime Contract. Bids shall be on a lump sum and/or unit price basis, with any alternate bid items if indicated in the Bid Form. The Issuing Office for the Bidding Documents is: Still Waters Engineering, 130 Veterinary Way - Unit 2, Leesburg, GA 31763, +1 (555) 000-0000. This agreement is for services related to the project that is subject to the Build America, Buy America Act (BABA) requirements. This project is expected to be funded all or in part by the GEFA's Drinking Water State Revolving Fund loan and will be subject to GEFA¿s Supplemental General Conditions for Federally Assisted State Revolving Loan Fund Construction Contracts.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS