Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on April 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Treatment Plant - 2026 Improvements

Closed
PE-66940-NONST-2026-000000005State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 11 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids for the Water Treatment Plant Maintenance Package A Degasifier Package (Project No. 25-4261A). The scope of work involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. Key deliverables include power washing the vessels, replacing media support grids and differential pressure gauges, performing vessel disinfection, and resealing access doors. To ensure continuous plant operation, the contractor must work on only one unit at a time. The project requires a contractor with a project manager possessing at least five years of experience and a track record of at least five similar degasifier servicing projects, as well as the provision of a factory-trained service technician for performance testing. Bids must be submitted electronically via the OpenGov portal by November 4, 2026, at 3:00 PM. The contract will be awarded to the lowest responsive and responsible bidder. Financial requirements include a bid guarantee of 5 percent of the bid amount and the provision of performance and payment bonds. Comprehensive insurance coverage is mandated, including general liability, pollution liability, and vehicle liability, with the City of Hollywood named as an additional insured. The project timeline specifies substantial completion within 180 days and final completion within 210 days, with liquidated damages set at 500 dollars per day. Additionally, the contractor must comply with federal prevailing wage requirements for Broward County and provide a twelve-month warranty against poor workmanship and faulty materials.
Public Utilities

POSTED

about 13 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The City of Lavonia, Georgia, is soliciting bids for comprehensive modifications to its water treatment plant to enhance capacity to 3.0 million gallons per day. The scope includes upgrades to the raw water pump station, installation of a new flash mixer and mixing basin, modifications to settling basins, filters, chemical feed systems, clearwells, and all related appurtenances. Work must be completed within 270 days after the Notice to Proceed, with the contract time beginning 30 days after the effective date of the agreement. All materials and equipment must be delivered to the project site ready for use, complying with strict packaging and preservation standards that require original manufacturer labeling, shock-absorbing supports for precast concrete, corrosion protection for metal framing, and proper storage to prevent damage, staining, or rust. Materials must be clearly marked for traceability, though no barcoding or electronic tracking systems are mandated. The contract emphasizes strict regulatory compliance, requiring adherence to the Georgia Security and Immigration Compliance Act and federal E-Verify mandates for all employees and subcontractors, alongside Davis-Bacon wage requirements and Georgia’s Prompt Payment Act. Environmental provisions include compliance with erosion control laws, NPDES permits, and EPD oversight, with no interruption to existing water treatment services allowed. All work must conform to industry standards such as ANSI/AWWA C653, ASTM, NEC, ACI, and SSPC, with certified test reports required for acceptance. The award will follow a Lowest-Price Technically Acceptable basis, with evaluation favoring bidders who meet technical requirements at the lowest cost, with no formal weighting of non-price factors. Key deliverables include as-built drawings, operation manuals, spare parts, and system certification. Contractors must submit a performance bond, payment bond, DBE compliance forms, and an affidavit, along with bid security. The City retains discretionary authority to approve substitutions, issue change orders, and suspend work, with no named COR, COTR, or PCO identified—only GEFA's DBE Compliance Coordinator serves as the primary point of contact for compliance matters.

General Info

City of Lavonia upgrades water treatment plant to 3.0 MGD with regulatory compliance, testing, and warranty.

Documents

3

City of Lavonia GA Water Treatment Plant 2026 Improvements - For Bid

PDF, High priority: read this firstrfb
High

City of Lavonia Water Treatment Plant 2026 Improvements Project Manual

PDF, High priority: read this firstrfb
High

SecAM 478_06G - Invitation to Bid for Water Treatment Plant Improvements

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jun 16, 2026 to May 26, 2026.

Deadline changed

Response deadline changed from May 26, 2026 to Jun 2, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Lavonia
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Lavonia
Office AddressN/A
Contacts
Bill Mitchell

Full Description

Show more
The work includes modifications to the water treatment plant to increase treatment capacity to 3.0 mgd. This includes modifications to the raw water pump station, new flash mixer and mixing basin, modifications to the settling basins, filters, chemical feed system, clearwells, and all related appurtenances.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS