Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on October 2, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Treatment Plant and Related Offsite Facilities Pressure Cleaning, Sealing, and Paint Touch-Up Services

Closed
IFB-352-25-JJState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221310
New
Federal
Water Treatment Chemicals, Testing, Monitoring, and Reporting- Sources Sought Notice / Request for Information
Solicitation # 15B70027PR000089
The Federal Bureau of Prisons (FBOP) is conducting market research to establish a Blanket Purchase Agreement (BPA) for comprehensive water treatment chemicals, testing, monitoring, and reporting services for its correctional institutions nationwide. The scope includes the supply of treatment chemicals and the provision of technical support for steam and hot water boilers, chiller water loops, cooling towers, and domestic water systems. Key requirements include monthly testing and reporting for boiler and chiller systems, as well as quarterly domestic water testing for Legionella, E. coli, lead, arsenic, nitrates, and PFAS. The contractor must be capable of implementing treatment recommendations and delivering chemicals within 15 calendar days of test results. A critical component of the requirement is the maintenance of a secure, web-based online reporting portal that provides institution-level, regional, and central office access for tracking water quality dashboards, chemical usage, and compliance trends. All services and materials must adhere to a rigorous set of standards, including EPA, CDC, OSHA, NFPA, ASHRAE Standard 188, and various federal, state, and local codes. Deliveries to institutions must be made between 8:00 a.m. and 2:00 p.m., Monday through Friday. The government is seeking capable vendors who can manage large-scale, multi-site programs and maintain a valid SAM.gov status, with payments processed via Purchase Order or government credit card.
National Acquisitions - Co

POSTED

6 days ago

DEADLINE

in 15 days
NAICS: 221310
New
Federal
4610--FY27 Portable Reverse Osmosis (RO) Water Purification System
Solicitation # 36C24827Q0114
The Department of Veterans Affairs, Network Contracting Office 8, intends to award a sole-source, firm-fixed-price contract to Evoqua Water Technologies LLC for the procurement and installation of brand-name only EON portable reverse osmosis water purification systems. This requirement is specifically for eight EON Portable RO and ROVER ALX transport system kits to be installed on Government-owned EON rover carts at the Orlando VA Veterans Hospital. The scope of work includes the delivery, installation, and start-up of the kits, the provision of two spare carbon block filter cartridges per kit, and the delivery of onsite clinical and technical training and orientation. The contractor is responsible for providing all necessary labor, tools, materials, supervision, and transportation to complete the turnover to the Government. The contract falls under NAICS Code 221310, which has a small business size standard of 41 million dollars. Delivery is requested within 90 days after receipt of order. As this is a brand-name-only requirement based on the determination that only one responsible source can provide the specialized equipment, this notice serves as an intent to award rather than a solicitation for quotes. Interested parties wishing to challenge the sole-source determination must submit a capabilities statement providing clear and convincing evidence that competition is in the best interest of the Government to Susan Rodriguez-Perez by November 20, 2026.
248-NETWORK Contract Office 8 (36C248)

POSTED

6 days ago

DEADLINE

in 1 day

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this first49 pages · ifb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Water Security Information Sharing SubscriptionsOpen now, due in 14 days
  • Water Retail ServicesOpen now
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Utilities
Contacts1 person available
OfficeN/A

Full Description

Show more
This proposal outlines the scope of work for qualified firms to provide pressure cleaning, sealing, and paint touch-up services for the Department of Public Utilities (DPU) Water Treatment Plant (WTP) and Hollywood West Pumping Station (HWPS). The goal is to hire a qualified and competent firm for an initial two-year term, with the option to renew for three additional one-year terms, for a total contract period of five years.

More opportunities from Florida → Public Utilities

Same awarding agency

NAICS: 237110
New
SLED
Lift Station W-27 Upgrades and Force Main Replacement (Project No. 23-8073)
Solicitation # IFB-435-26-JM
The City of Hollywood, Florida, is soliciting bids for Project No. 23-8073, which involves comprehensive upgrades to Lift Station W-27 and the replacement of its force main. The scope of work includes replacing three existing pumps and motors with four dry pit submersible pumps, installing variable frequency drives, constructing a new ground-floor electrical room with HVAC, and installing a skid-mounted emergency generator. Additionally, the project requires the installation of a 20-inch epoxy-lined ductile iron force main connecting to the Taft Street main and various stormwater improvements, including exfiltration trenches and high-performance polypropylene piping near Rotary Park. Bids must be submitted electronically via the OpenGov portal by December 9, 2026, at 3:00 PM. The contract will be awarded to the lowest responsive and responsible bidder. Key requirements include a bid guaranty of 5 percent, performance and payment bonds equal to 100 percent of the total bid, and adherence to US Department of Labor prevailing wage rates for Broward County. The project establishes a substantial completion timeline of 720 days and a closeout period of 780 days, with liquidated damages set at 1,000 dollars per day. Recent addenda have modified technical specifications for asphalt milling and resurfacing and adjusted quantities for manholes, plug valves, and stormwater piping.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 21 days
View Details
NAICS: 237110
New
SLED
Septic to Sewer and Water Main Replacement Blvd Heights (Projects No. 22-7114 and 25-5153)
Solicitation # IFB-434-26-JM
The City of Hollywood, Florida, is soliciting bids under IFB-434-26-JM for the Boulevard Heights Partial Septic to Sewer Expansion and Water Main Replacement (Project Nos. 22-7114 and 25-5153). The scope of work involves the construction of approximately 4,900 linear feet of 8-inch diameter SDR-26 PVC and 400 linear feet of DIP gravity sewers, including 18 manholes and 87 service laterals. Additionally, the project requires replacing an aged water distribution system with approximately 6,000 linear feet of 8-inch diameter C900 PVC, including maintenance valves, five fire hydrants, and 101 water services with meters relocated to front property lines. All work must be performed within city property, easements, and rights-of-way, adhering to technical specifications and ADA requirements. The contract is awarded to the lowest responsive and responsible bidder, with a local preference policy for Hollywood vendors. The performance period is 300 calendar days from the Notice to Proceed, with a substantial completion milestone at 270 days and final project closeout at 300 days. Liquidated damages are set at 1,000 dollars per day for failure to meet these milestones. The contractor is required to provide performance and payment bonds equal to the total contract price and must comply with US Department of Labor prevailing wage rates for Broward County. Bids must be submitted electronically via the OpenGov portal by December 9, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 21 days
View Details
NAICS: 237110
SLED
Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A
Solicitation # IFB-441-26-JM
The City of Hollywood, Florida, through its Public Utilities department, is soliciting bids under IFB-441-26-JM (Project No. 25-4262A) for the rehabilitation of chemical storage and containment areas at the Water Treatment Facility MS/RO chemical storage area. The scope of work includes demolition, surface preparation, and the installation of a new chemical-resistant coating system for the bulk storage and sump areas, as well as the full replacement of the pump-out system, including all associated piping, valves, electrical wiring, and controls. Bids are due by December 3, 2026, and will be evaluated primarily on price, responsiveness, and responsibility, with a specific local preference policy for Hollywood-based vendors. Qualified bidders must hold an active Florida General Contractor license and meet stringent experience requirements, including a CQC Plan Manager with at least 10 years of similar project experience. The contract mandates adherence to US Department of Labor prevailing wage rates for Broward County and requires performance and payment bonds, as well as comprehensive insurance coverage, including pollution and professional liability. Project administration involves monthly notarized payment applications subject to a 5% retainage, with liquidated damages of $500 per day for delays. All work must comply with CSI MasterFormat standards and undergo rigorous quality control testing, with specific hold points for inspection by the City and coating manufacturers.
Water and Sewer Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 15 days
View Details
NAICS: 237110
SLED
Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262
Solicitation # IFB-440-26-JM
The City of Hollywood, Florida, is soliciting bids for Water Treatment Plant Maintenance Package B, Project No. 25-4262, under solicitation IFB-440-26-JM. The project involves the demolition and installation of critical process systems and equipment at the City of Hollywood Water Treatment Facility. Major work elements include the removal and replacement of lime slaker systems 2 and 3, the filter surface wash system, and the sodium hexametaphosphate feed system, as well as the reconfiguration of the standby sludge pump and replacement of associated piping and flushing water lines. The scope encompasses all necessary structural repairs, electrical work, controls, and instrumentation, concluding with start-up, testing, and commissioning to ensure fully operational systems. The contract requires a completion timeline of 365 days from the Notice to Proceed, with liquidated damages set at 500 dollars per day for delays. Award will be granted to the lowest responsive and responsible bidder. Contractors must adhere to U.S. Department of Labor prevailing wage rates for Broward County and provide a 12-month guarantee against poor workmanship. Key administrative requirements include monthly progress payments, a 5 percent retainage, and the provision of performance and payment bonds. Specialized qualifications are required for Integrated Control System Contractors, including a minimum of 10 years in business and a UL listed panel fabrication facility. Bids must be submitted electronically via the OpenGov portal by December 3, 2026, at 3:00 pm.
Water and Sewer Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 15 days
View Details
NAICS: 237110
SLED
Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261
Solicitation # IFB-438-26-JM
The City of Hollywood, Florida, is soliciting bids for the Water Treatment Plant Maintenance Package A (Project No. 25-4261 / IFB-438-26-JM), a construction project focused on the repair and replacement of critical facilities at the Water Treatment Plant located at 3441 Hollywood Boulevard. The scope of work comprises six primary elements: lime silo repairs, replacement of silo dust collectors, replacement of the sludge drum thickener and associated building repairs, replacement of valves for storage tanks 3 and 4, and the replacement of clearwell sample lines. The project budget is estimated to be under 4.5 million dollars, and the contract will be awarded to the lowest responsive and responsible bidder based on price, qualifications, financial capability, and past performance. The contract establishes a total duration of 645 calendar days, with substantial completion required by day 615. Failure to meet these timelines may result in liquidated damages of 2,500 dollars per day. The selected contractor must provide performance and payment bonds equal to the contract price and adhere to federal prevailing wage rates for Broward County. Technical requirements include compliance with OSHA standards for clearwell access, AWWA approved disinfections, and ADA accessibility. Bids must be submitted electronically via the OpenGov portal by December 3, 2026, at 3:00 PM. Payment will be processed through the City's standard application for payment form, subject to a 5 percent retainage.
Water and Sewer Line and Related Structures Construction

POSTED

13 days ago

DEADLINE

in 15 days
View Details
NAICS: 237110
SLED
SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)
Solicitation # IFB-442-26-JM
The City of Hollywood, Florida, Department of Public Utilities is soliciting bids for Project No. 25-11070A, the SW-2 Bypass Pumping and Rehabilitation project. Located at South 8th Avenue and North Southlake Drive, this critical flood mitigation effort involves the structural rehabilitation and modernization of Stormwater Pump Station No. 2 to combat harsh coastal conditions. The project is budgeted under 3,000,000 dollars and is divided into three distinct phases: the establishment of a 20,000 GPM automated bypass pumping system with a seven-day operational demonstration period, the structural rehabilitation of the pump well including the casting of a new reinforced concrete top slab and CMU wall repairs, and final site restoration of pavement, sidewalks, and sod. The contract has a total duration of 240 calendar days from the Notice to Proceed, with substantial completion required within 210 days. Liquidated damages for delays are set at 500 dollars per day, and a 5 percent retainage will be held until final acceptance. Bidders must hold an active Florida General Contractor license and provide a bid guarantee of 5 percent of the bid amount. All work must comply with City of Hollywood, FDOT, and Florida Building Code standards, and laborers must be paid according to US Department of Labor prevailing wage rates for Broward County. Bids are due by November 25, 2026, via the OpenGov portal.
Water and Sewer Line and Related Structures Construction

POSTED

14 days ago

DEADLINE

in 7 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS