Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)

Active
IFB-442-26-JMState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Hollywood, Florida, has issued solicitation IFB-442-26-JM for the structural rehabilitation and modernization of Stormwater Pump Station No. 2 (SW-2), located at South 8th Avenue and North Southlake Drive. The project is designed to restore long-term operational reliability to a key flood mitigation asset exposed to harsh coastal conditions. The scope of work is divided into three distinct phases: the establishment and one-week operational validation of a 20,000 GPM automated bypass pumping system; the structural rehabilitation involving the demolition of existing top slabs, pouring a new reinforced concrete top slab, and repairing CMU walls and concrete spalls; and final site restoration of asphalt pavement, concrete sidewalks, and sodded areas. The contract will be awarded to the lowest responsive and responsible bidder. Qualified contractors must provide a bid security of 5% of the bid amount and adhere to strict technical specifications, including ASTM standards for galvanized coatings and FDOT/USDOT regulations for waste transport. Performance is measured by the successful delivery of an operational bypass system, high-precision masonry and concrete restoration, and full site closeout. Administrative requirements include the submission of a notarized Application for Payment by the 20th of each month, with payments processed via Automated Clearing House (ACH). Final acceptance is contingent upon the submission of written test results, performance affidavits, O&M manuals, and record drawings.

General Info

City of Hollywood seeks bids for structural rehabilitation of Stormwater Pump Station 2.

NAICS

N/A

Place of Performance

FL, USA

Set-Aside

NONE

Documents

6

Attachment C - Supplementary General Conditions

DOC, High priority: read this first8 pages · specifications
High

City of Hollywood, Florida - General Conditions, Public Utilities

DOC, High priority: read this first54 pages · specifications
High

City of Hollywood Project No. 25-11070 Pump Station SW-2 Technical Specifications

PDF, High priority: read this first197 pages · specifications
High

City of Hollywood Pump Station SW-2 By-Pass Pump & Rehabilitation Construction Plans

PDF, High priority: read this firstspecifications
High

City of Hollywood - SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)

PDF, High priority: read this first59 pages · ifb
High

City of Hollywood - SW-2 Bypass Pumping & Rehabilitation Sample Contract

DOC, High priority: read this first12 pages · contract-document
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Public Utilities
Contacts2 people available
OfficeHollywood, FL, 33020, USA
Organization / AgencyFlorida → Public Utilities
Office AddressHollywood, FL, 33020, USA
Contacts
Hugo DavalosSenior Project Manager
Julissa MarcanoSenior Purchasing Agent

Interested Companies (12)

Ric-man Internationalpompano beach, FL
Basile USAMiami, FL
RF Environmental ServicesOakland Park, FL

See All 12 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Pump Station SW-2 is a key flood mitigation asset managing stormwater drainage into South Lake at S. 8th Avenue and N. Southlake Drive . Exposure to harsh coastal conditions necessitates structural repairs to the building and an overhaul of the pump well infrastructure to restore long-term operational reliability . Key Project Challenges Uninterrupted Drainage: Maintaining full flood protection requires operating a fully monitored 20,000 GPM bypass pumping system for one week before starting structural demolition . Tight Site Footprint: Work occurs adjacent to residential properties and a seawall, requiring strict spatial coordination and compliance with municipal noise ordinances . Structural Execution: Rehabilitating aged CMU walls, executing concrete spall repairs, and casting a new reinforced top slab require high-precision structural work . Success Criteria The City seeks a contractor with proven civil/structural utility experience who delivers seamless bypass pumping , quality masonry and concrete restoration , and complete site, sidewalk, and pavement restoration upon closeout.

More opportunities from Florida → Public Utilities

Same awarding agency

New
SLED
Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261
Solicitation # IFB-438-26-JM
The City of Hollywood, Florida, is soliciting bids under solicitation IFB-438-26-JM for Water Treatment Plant Maintenance Package A, Project No. 25-4261. The scope of work involves critical repairs and replacements at the Water Treatment Plant located at 3441 Hollywood Boulevard. Key work elements include lime silo repairs, replacement of silo dust collectors, replacement of the sludge drum thickener and associated building repairs, replacement of valves for Storage Tank Nos. 3 and 4, and the replacement of clearwell sample lines. The contract includes specific requirements for mobilization, demobilization, and a city contingency allowance of up to 250,000 dollars, with certain bid alternates available. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, financial capability, and past performance. Bidders must submit their proposals electronically via the OpenGov portal by November 25, 2026, at 3:00 pm. Awardees are required to provide performance and payment bonds equal to the contract price and must adhere to prevailing wage requirements, OSHA safety standards for clearwell access, and ADA compliance. Technical specifications mandate strict packaging and labeling for spare parts, specific thermal printing for electrical labels, and the use of certified personnel for adhesive anchor installations. Payment is processed through the City's standard application form and requires detailed documentation of progress and stored materials.

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS