Water Utility Repair and Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract focuses on the repair and replacement of aging water utility lines as part of street improvement projects for the City of Tulare in California. The scope of work involves comprehensive infrastructure upgrades, including trenching, excavation, and the installation of PVC or ductile iron water mains. The contractor is responsible for pipe fitting and rigorous pressure testing using specialized excavation equipment and trench shoring to ensure a fully operational water distribution system. Classified under NAICS code 237110, the project is performed within the city of Tulare, zip code 93274. The work is executed as a subcontractor supporting prime contractors to meet the municipal requirements of the City of Tulare. The project was posted on June 9, 2026, and aims to modernize the local utility network to improve long-term reliability and performance.

General Info

Subcontract for repairing and replacing water utility lines for the City of Tulare.

Agency

California → City of Tulare

Place of Performance

Tulare, CA, 93274

Set-Aside

NONE

Documents

This scope was carved out of Tulare-Dayton Improvements - Tulare CA.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Tulare
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Tulare
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs repair and replacement of aging water utility lines for prime contractors on City of Tulare street improvement projects. Executes trenching, excavation, installation of ductile iron or PVC water mains, pipe fitting, and pressure testing using trench shoring and excavation equipment. Delivers a fully operational and tested water distribution system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is governed by EJCDC standard general and supplementary conditions. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bidders must provide bid security equal to 5 percent of their maximum bid price and are required to furnish performance and payment bonds upon award. Performance is subject to liquidated damages of 1,000 dollars per day for failure to meet substantial completion deadlines. Payment is processed monthly via applications for payment, with funds becoming due 30 days after presentation to the owner. Quality assurance is maintained through rigorous inspection standards, including compliance with AWS, SMACNA, NEMA, and ASTM specifications.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS