Water Well Database Production Support
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Ohio Department of Natural Resources (ODNR) is seeking a supplier to provide production support for the Water Well database, its public-facing Angular web application, and associated GIS services. The scope of work is divided into three categories: Proactive Support, which includes monthly patching, backups, and security scanning; Reactive Support, covering break/fix and system restoration; and Enhancements for custom improvements and architectural alterations. The system is hosted on Amazon AWS Cloud using Elastic Beanstalk and RDS for SQL Server, with a technology stack featuring .NET Core C# and Angular 12. The contract is structured as a four-year support period from July 1, 2027, through SFY31, with the first two years guaranteed and the latter two at ODNR's discretion. Pricing consists of both fixed-cost and time-and-materials components, with an all-inclusive annual total required for the cost proposal. Award selection is based on a weighted scoring system evaluating technical and cost proposals, with a maximum of 385 points for the technical proposal and 256 points for the cost proposal. Suppliers must demonstrate similar work experience from the past two years and provide 2–3 project examples using a similar technology stack. There is no set-aside status for this solicitation.
General Info
Place of Performance
Set-Aside
Documents
8Read all 8 documents
Due in 30 daysEvery page of every file, in your free workspace.
Read the documentsAI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 8 solicitation documentsRead every page
- AI contract breakdown13 sections, Uniform Contract Format
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Submission deadline
Response Deadline
Organization & Contact Information
Full Description
*****THIS IS ROUND 2, NOTHING HAS CHANGED IN THE SCOPE OF WORK. Round 2 was created to add the missing documents and the Question and Answer document. This round has extended the RFP******ODNR will award to the supplier with the highest scoring proposal as defined in the RFP evaluation criteria.
Database management system software maintenance
Items 1 | Required Item | Water Well Database Production Support | Estimated usage: 1.00000 | Unit: AMT | Requested delivery: 7/1/2027
Inquiries Inquiry 100131 | Who currently supports the system (internal staff or external contractor)? If external contactor: Are they able to bid on this RFP? | Answer: It is currently with an external contractor. Yes, they are able to bid on this RFP. | Answered: 10/27/2026 Inquiry 100134 | Proposals Submission section (pg1): a) Do you want all prcing submitted in the provided document "1-response Quotations Form" (including enhancement staffing rates) or should we create our own pricing document and just include the Unit Price for Proactive and Reactive Support amount in the Unit Price field and list the name of our pricing document in the Supplier Attachments field? b) Are the Proactive and Reactive costs to be bundled into one fee? c) Is the Unit Price column in the "1-response Quotations Form" Excel document a monthly, quarterly or annual amount? | Answer: Your price should be an all inclusive annual total. You should provide a break down of that annual charge as a separate document, which would be part of your cost proposal. | Answered: 10/27/2026 Inquiry 100137 | Enhancements Section (Pg 5-6): RFP states Offeror's Technical Prposal must include table defining staff prposed to work on Enhancements. Do you want this pricing included in the Technical Prposal and not the cost proposal? | Answer: Your staffing costs should be in the cost proposal. Please do not put any costs in your technical proposal. | Answered: 10/27/2026 Inquiry 100140 | In Proposals Submission section (pg 1) - Atttachment Two is referenced in Technical Proposal section and Attachment 3 is referenced in Cost Prposal section. Could you provide Attachment 2 & 3. I do not see them in the ZIP files when you "download all contents of thie RFx". Thank you | Answer: Attachment Two and Three are your technical proposal and cost proposal. These would be your documents, there is no required format for those documents. | Answered: 10/27/2026 Inquiry 100187 | The solicitation has the following docs shown. Were there supposed to be attachements of these to be signed? Affirmation and Disclosure Form Independent Contractor Acknowledgement Form State Terms and Conditions | Answer: Affirmation and Disclosure Form | Answered: Independent Contractor Acknowledgement Form Inquiry Affirmation and Disclosure Form Inquiry Independent Contractor Acknowledgement Form Inquiry State Terms and Conditions Inquiry 100191 | 1. Mandatory Requirements state that "The Supplier must have experience performing similar work within the past two years" and must provide 2–3 examples of projects with similar technology stacks. May an Offeror meet these requirements through the documented experience of its proposed key personnel (for example, the Offeror's principal who will serve as Architect/Developer and Project Manager) and of a named subcontractor, rather than through contracts held by the Offeror as a company? 2. May the Offeror propose a subcontractor or teaming partner for part of the Proactive and Reactive Support, and if so, is there any limit on the share of work a subcontractor may perform? 3. Will production support be performed remotely, apart from the Delivery Location for deliverables? Are any on-site visits to Columbus expected? 4. Will the Start-up period include a knowledge-transfer overlap with the current external contractor (including access to source code, deployment pipelines, runbooks, and open defect lists), and how long is that overlap expected to be? 5. What is ODNR's estimated annual budget, or expected number of hours, for Enhancements (time-and-materials) in SFY28 and SFY29, so that Offerors can propose a comparable Total Not-to-Exceed Cost? 6. What are the expected response and resolution times for break/fix issues by priority, and are after-hours or weekend responses required, so Offerors can price on-call coverage consistently before the SLAs are documented at award? 7. For the GIS criterion, is ODNR's GIS platform based on Esri ArcGIS Enterprise or ArcGIS Online, and which GIS services does the application consume? 8. Which application security code scanning tools, if any, are already approved by ODNR-OIT? Charles HavranekFounder & President, Acknowledged Development Inc.UEI NAQCJ9URTKD6 · CAGE •••••@•••••.•••Sign up to see this detail · +1 (•••) •••-••••Sign up to see this detail | Answer: ODNR has received your inquiry and have forwarded to the project team for responses. Responses will be posted as soon as possible. | Answered: 10/28/2026 Inquiry 100194 | To help price the fixed-cost Proactive and Reactive Support, can ODNR share its expected minimums for: Response and resolution times by priority level (Critical/High/Medium/Low) Support coverage hours (business hours vs. 24x7x365, including holidays) System availability target Recovery point and recovery time objectives (RPO/RTO) for restoration Whether service credits or penalties will apply when SLAs are missed Are other roles allowed beyond PM, BA/Tester, and Architect/Developer, such as GIS developer, DBA, or cloud/DevOps engineer? Who supports the system today? Will the incumbent have to provide transition support and overlap? What documentation exists today: architecture diagrams, runbooks, System Security Plan, PTA/PIA, deployment procedures, and a known-defect backlog? Where is the source code kept (e.g., CodeCommit, GitHub, Azure DevOps)? Is there an existing CI/CD pipeline? Are there separate dev, test, and UAT environments? What is the current ticket volume? The architecture uses Elastic Beanstalk and RDS for SQL Server, which are managed services. Which EC2/VM instances does the "OS patching of VMs" requirement cover? Which .NET version and SQL Server version/edition are in production? Angular 12 is end-of-life. Is a framework upgrade expected under Proactive Support or as an Enhancement? Who owns and pays for third-party licenses (e.g., IronPdf, AG Grid Enterprise, ESRI)? Is the Supplier expected to renew them? Who pays for AWS hosting? What is the current backup approach and how long are backups kept? Does ODNR-OIT have preferred or already-approved code-scanning tools? Who pays for the tool licenses? What turnaround is expected for fixing Critical and High findings from code scans and vulnerability scans? What does SIEM integration require of the Supplier (e.g., log forwarding, alert response)? Are there staffing restrictions, such as background checks, U.S.-only or onshore staff, or data residency rules? | Answer: ODNR has received your inquiry and have forwarded to the project team for responses. Responses will be posted as soon as possible. | Answered: 10/28/2026 Inquiry 100856 | How many enhancement hours per year should Offerors assume, and should enhancement costs be included in the "all-inclusive annual total" on the Quotations Form? Can ODNR share how many enhancement hours were used in recent years?Should the one-time start-up cost be shown as a separate line, or included in the SFY28 annual total?Is fixed-fee reactive support intended to cover all break/fix effort regardless of volume? For major incidents caused by events outside the Supplier's control (e.g., natural disasters, regional AWS outages, third-party failures), would restoration effort beyond normal levels be handled through a change order or enhancement hours?Which GIS services are in scope for the Supplier, and which are supported by ODNR's GIS platform team?How does ODNR define each priority level, and what distinguishes an "outage" from a "degradation" for restoration purposes?Will the Supplier have direct AWS console access, or will access be mediated through ODNR-OIT? What IAM permissions model is expected?Can ODNR share the most recent vulnerability or code-scan results, or the size of the current vulnerability backlog?Are there known pain points or improvement priorities ODNR hopes to address under this contract?Does ODNR already operate, or prefer, a ticketing or DevOps platform (e.g., Azure DevOps, Jira) that the Supplier should use?What activities, if any, must be performed on site?Can start-up and knowledge transfer begin before 7/1/2027, or must they fall entirely within SFY28?Does ODNR have a required format, template or tool for monthly status reports and the CIDAR log? | Answer: ODNR has received your inquiry and have forwarded to the project team for responses. Responses will be posted as soon as possible. | Answered: 11/3/2026 Inquiry 101286 | Q057. The RFP requires fixed-price Reactive Support for failing production functionality. Would ODNR accept an expressly defined included-workload threshold and a written overage/change mechanism? If not, bidders will need to price the stated fixed-scope obligation without an assumed hourly cap.Q105. Would ODNR consider adding a defined aggregate liability cap for this services contract, subject to specified exclusions? Please identify any categories for which ODNR would not consider a cap. This requests a contract change, not an interpretation that a cap already exists.Q107. Article V.F expressly extends lower comparable fees retroactively. Please define the comparability factors ODNR will use. Would ODNR consider stated exclusions for materially different scope/volume/service levels or limit retroactive application? Any such exclusion or limit would require express agreement.Q108. Article VII states the termination/payment and completion-cost consequences. Would ODNR consider adding a defined cure period for remediable breaches and protection for accepted unpaid services or approved noncancelable commitments? Please identify any portions of Article VII that are non-negotiable. | Answer: ODNR has received your inquiry and have forwarded to the project team for responses. Responses will be posted as soon as possible. | Answered: 11/5/2026 Inquiry 101612 | 1. Mandatory Requirements state that "The Supplier must have experience performing similar work within the past two years" and must provide 2–3 examples of projects with similar technology stacks. May an Offeror meet these requirements through the documented experience of its proposed key personnel (for example, the Offeror's principal who will serve as Architect/Developer and Project Manager) and of a named subcontractor, rather than through contracts held by the Offeror as a company? 2. May the Offeror propose a subcontractor or teaming partner for part of the Proactive and Reactive Support, and if so, is there any limit on the share of work a subcontractor may perform? 3. Will production support be performed remotely, apart from the Delivery Location for deliverables? Are any on-site visits to Columbus expected? 4. Will the Start-up period include a knowledge-transfer overlap with the current external contractor (including access to source code, deployment pipelines, runbooks, and open defect lists), and how long is that overlap expected to be? 5. What is ODNR's estimated annual budget, or expected number of hours, for Enhancements (time-and-materials) in SFY28 and SFY29, so that Offerors can propose a comparable Total Not-to-Exceed Cost? 6. What are the expected response and resolution times for break/fix issues by priority, and are after-hours or weekend responses required, so Offerors can price on-call coverage consistently before the SLAs are documented at award? 7. For the GIS criterion, is ODNR's GIS platform based on Esri ArcGIS Enterprise or ArcGIS Online, and which GIS services does the application consume? 8. Which application security code scanning tools, if any, are already approved by ODNR-OIT? Charles HavranekFounder & President, Acknowledged Development Inc.UEI NAQCJ9URTKD6 · CAGE •••••@•••••.•••Sign up to see this detail · +1 (•••) •••-••••Sign up to see this detail | Answer: Please find attached a Word document with all inquiries and answers to all inquiries. I am also attaching the documents that did not come over in the initial posting. | Answered: 11/9/2026 Inquiry 101615 | To help price the fixed-cost Proactive and Reactive Support, can ODNR share its expected minimums for: Response and resolution times by priority level (Critical/High/Medium/Low) Support coverage hours (business hours vs. 24x7x365, including holidays) System availability target Recovery point and recovery time objectives (RPO/RTO) for restoration Whether service credits or penalties will apply when SLAs are missed Are other roles allowed beyond PM, BA/Tester, and Architect/Developer, such as GIS developer, DBA, or cloud/DevOps engineer? Who supports the system today? Will the incumbent have to provide transition support and overlap? What documentation exists today: architecture diagrams, runbooks, System Security Plan, PTA/PIA, deployment procedures, and a known-defect backlog? Where is the source code kept (e.g., CodeCommit, GitHub, Azure DevOps)? Is there an existing CI/CD pipeline? Are there separate dev, test, and UAT environments? What is the current ticket volume? The architecture uses Elastic Beanstalk and RDS for SQL Server, which are managed services. Which EC2/VM instances does the "OS patching of VMs" requirement cover? Which .NET version and SQL Server version/edition are in production? Angular 12 is end-of-life. Is a framework upgrade expected under Proactive Support or as an Enhancement? Who owns and pays for third-party licenses (e.g., IronPdf, AG Grid Enterprise, ESRI)? Is the Supplier expected to renew them? Who pays for AWS hosting? What is the current backup approach and how long are backups kept? Does ODNR-OIT have preferred or already-approved code-scanning tools? Who pays for the tool licenses? What turnaround is expected for fixing Critical and High findings from code scans and vulnerability scans? What does SIEM integration require of the Supplier (e.g., log forwarding, alert response)? Are there staffing restrictions, such as background checks, U.S.-only or onshore staff, or data residency rules? | Answer: Please reference public post from 11/9/2026 at 1:31 PM for all answers. | Answered: 11/9/2026 Inquiry 101618 | How many enhancement hours per year should Offerors assume, and should enhancement costs be included in the "all-inclusive annual total" on the Quotations Form? Can ODNR share how many enhancement hours were used in recent years?Should the one-time start-up cost be shown as a separate line, or included in the SFY28 annual total?Is fixed-fee reactive support intended to cover all break/fix effort regardless of volume? For major incidents caused by events outside the Supplier's control (e.g., natural disasters, regional AWS outages, third-party failures), would restoration effort beyond normal levels be handled through a change order or enhancement hours?Which GIS services are in scope for the Supplier, and which are supported by ODNR's GIS platform team?How does ODNR define each priority level, and what distinguishes an "outage" from a "degradation" for restoration purposes?Will the Supplier have direct AWS console access, or will access be mediated through ODNR-OIT? What IAM permissions model is expected?Can ODNR share the most recent vulnerability or code-scan results, or the size of the current vulnerability backlog?Are there known pain points or improvement priorities ODNR hopes to address under this contract?Does ODNR already operate, or prefer, a ticketing or DevOps platform (e.g., Azure DevOps, Jira) that the Supplier should use?What activities, if any, must be performed on site?Can start-up and knowledge transfer begin before 7/1/2027, or must they fall entirely within SFY28?Does ODNR have a required format, template or tool for monthly status reports and the CIDAR log? | Answer: Please reference public post from 11/9/2026 at 1:31 PM for all answers. | Answered: 11/9/2026 Inquiry 101621 | The RFP references Attachments Two and Three, including Supplements A & S. Where are these attachments located? | Answer: Please reference public post from 11/9/2026 at 1:31 PM for all answers. | Answered: 11/9/2026 Inquiry 101624 | Q001. Must the prime contractor independently satisfy both mandatory experience requirements, or may a named subcontractor's corporate projects satisfy the similar-work requirement and the two-to-three comparable-project requirement?Q002. May projects performed by proposed personnel while employed by another company count toward the mandatory project examples, or will they be considered only as individual qualifications? How should that experience be attributed?Q003. Must each example include SQL Server, Angular, .NET/C#, GIS and AWS, or may the examples collectively demonstrate those technologies? Which technologies must be represented for an example to qualify?Q004. Is the two-year lookback measured from the proposal deadline? Does an engagement qualify when work occurred within that period but began earlier, and must every submitted project example meet the same recency test?Q005. Are ongoing production-support engagements and commercial-sector projects acceptable, or must examples be completed projects or government contracts? What evidence establishes satisfactory performance for an ongoing engagement?Q006. May separately scoped and documented assignments for the same customer count as distinct project examples, including assignments delivered through an intermediary or prime contractor?Q008. For the five experience criteria in Table 7, how will ODNR distinguish and score prime-company experience, subcontractor-company experience and proposed personnel experience? May evidence across the proposed team be combined? | Answer: Please reference public post from 11/9/2026 at 1:31 PM for all answers. | Answered: 11/9/2026 Inquiry 101627 | Q010. May all services be performed remotely from locations within the United States, or must any personnel be based in Ohio or regularly work at an ODNR office? Please distinguish residency requirements from physical work-location requirements.Q011. Which activities require onsite attendance, at what locations, how often, for how long and with what notice? Is there any emergency onsite-response requirement? Travel is contractor-funded, so these expectations are needed for pricing.Q012. Does ODNR require a minimum team size, minimum full-time-equivalent allocation, dedicated personnel, specified working hours or a designated backup for each function, or may suppliers propose a shared, part-time specialist team meeting the service levels?Q013. Table 3 is introduced as an example. May a qualified individual cover multiple functions, and are there any minimum role-separation or specialist-staffing requirements beyond the illustrated roles?Q015. Article X.A permits certain ancillary subcontracting without approval, while X.A.1 requires prior written approval for work-related subcontracts. Please clarify the dividing line, including treatment of 1099 specialists, and the approval stage. Beyond the list required by X.A.2, what approval documentation is needed?Q016. Security Section 6 assigns contractor screening duties, and Article VIII.E provides for ODNR screening of onsite or remotely connected staff. Please provide this project's screening checklist, cost allocation, accepted evidence and expected lead times. For roles without FTI/CJI access, what onboarding activities are permitted while checks are pending?Q017. Articles IX.B and XVI.G prescribe the personnel list and OPERS acknowledgments, including the employee-count exemption and execution-stage timing. Please clarify administration for 1099 personnel and subcontractor employees. Are there additional project-specific citizenship, residency or credential requirements beyond the stated U.S.-only performance and applicable-law obligations?Q018. Article VIII.A assigns the supplier its own equipment, software and connectivity costs unless specifically provided otherwise. Which State-managed access facilities, accounts, licenses or endpoints, if any, will be furnished for this engagement? What endpoint and home-office controls must supplier-provided equipment satisfy? | Answer: Please reference public post from 11/9/2026 at 1:31 PM for all answers. | Answered: 11/9/2026
Similar Contracts
Same NAICS industry code
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
