This Government Contract opportunity from Department Of Agriculture was posted on September 27, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for 17CXT Toilet B Area - ADA Bar Specifications: Technical drawing specifications for the installation of 14 new forged ADA bars and asphalt pavement work, including compaction and shoulder requirements. Drawn by J. Doe, Jr. Engineer in San Francisco, CA.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 22CXTFlushToiletDetail: Technical detail document regarding flush toilet specifications, provided for educational purposes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 23CXT Flush Toilet Floor Plan: Technical drawing and engineered record for floor piping work and floor drain blockouts, including PVC pipe specifications and installation details. The document serves as a reference for construction and requires adherence to local, state, and federal recommendations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 31 Boardwalk Platform Site Plan: A technical site plan and specification document for a river access platform and boardwalk project. It includes dimensions for the boardwalk (6' wide) and platforms (8' x 24'), material specifications (plastic wood on pier), and general location notes for accessibility and site staking.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 32AccessibleBoardwalkPlan: Technical plan or specification document for an accessible boardwalk project. The provided content is minimal, but the filename indicates it is a design/planning document.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 33 Beach Viewing Platform Plan: Technical plan for the Beach Viewing Platform. The document specifies that all details must be legible.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 5 Loop Road Spur Staking Plan: Technical document containing staking plan details for the 5 Loop Road Spur, including centerline markers for camping spurs, sign installation requirements, and safety guarding specifications referencing OSHA Section 1910.1200.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 6 Loop Road Cross Sections: Technical specifications and cross-section details for the Camping Spur and Social Area on undisturbed ground, including nonconductive coating measurements and various percentage-based cost/technical parameters.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 7 Loop Road Cross Sections B-1/7: Technical cross-section specifications for the 7 Loop Road project, specifically detail B-1/7. The document outlines requirements for ground preparation, including clear and grub operations 10 feet from the pavement edge, subfloor and substrate shedding, and crown stop percentages.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 8 Loop Road Cross Sections: Technical specifications document detailing cross-section requirements for 8 Loop Road, including base and asphalt measurements, material requirements for PTFE, and ground compaction standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 9LoopRoadCrossSections - Detail: Technical cross-section details for road construction, specifically regarding the Pul-Through Host Spur and Social Area. The document specifies base and surface material depths (3-8 inches), asphalt thickness, slope grades, and elevation requirements, referencing external specifications for materials and drainage.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Accessible Landing Platform Plan: Technical drawing specifications for an Accessible Landing Platform, dated 12/31/2023. The document includes plan details, elevation measurements (5'0' height, 20'x20' dimensions), and a legend for accessible ladders, elevators, and seating.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for AG-64R4-S-10-0008 Watercress Recreation Area RSI Amendment 2: Amendment No. 2 to solicitation AG-64R4-S-10-0008 for the Watercress Recreation Area Recreation Site Improvement Project, issued by the USDA Forest Service on 08/09/2010. This amendment provides additional Q&A regarding asphalt requirements, compaction standards, and CXT toilet facility specifications, and includes a CXT price list and product details for multi-user flush style restrooms.
RTF
RTF, High priority: read this first1 page · amendment
HighAI Summary for Amendment 1 - AG-64R4-S-10-0008 Watercress Recreation Area Recreation Site Improvement Project: Amendment 01 to solicitation AG-64R4-S-10-0008 for the Watercress Recreation Area Recreation Site Improvement Project, issued by the USDA Forest Service on August 4, 2010. This amendment extends the offer submission deadline to August 19, 2010, at 4:30 P.M. local time and incorporates a pre-proposal site visit record and handrail drawings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bid Schedule Description: A document titled 'Bid Description' intended to provide detailed specifications or requirements for a bid schedule. The provided content is primarily headers and contact information for Guide Press.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Camping Spur A & B Pavement Detail: Technical drawing/specification document detailing pavement and shoulder layouts for Camping Spur A and Camping Spur B, including measurements and aggregate details.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Camping Spur A Plan Detail: Technical plan and specifications for the Rehab Area of Camping Spur A, including dimensions (55' x 70'), layout requirements, and signage notes for the New Campground Road Phase.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Camping Spur C Pavement Detail: Technical drawing and specification document detailing the pavement and plan layout for Camping Spur C, including shoulder measurements and site orientation for the New Campground Top Road.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Concrete Footing Detail - 3 Panel Kiosk: Technical specifications and engineering details for concrete footings (C25 Specification Rev. 10) for a 3-panel kiosk. Includes material compositions for concrete, specific dimensions, structural notes, and hardware requirements for screws and welding.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Easting Access Road Site Plan: Technical site plan and cross-section specifications for the Easting Access Road project in Tollywood Parish, dated July 15, 2023. The document details road dimensions, utility modifications, demolition of existing structures, and provides specific plan views (A-M) and cross-sections for the proposed grade-separated road and culvert.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Erosion Wall Plans and Details - Waterscreen Recreation Area: Technical plans and specifications for the construction of Keystone concrete retaining walls at the Waterscreen Recreation Area. The document includes elevation details for Walls A through E, bearing capacity requirements (1500 PSF), material specifications for Compac II and Keystone Standard block units, geotextile requirements, and foundation soil guidelines.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Existing Site Condition (Site Survey) Plan A-103: A site survey plan dated July 15, 2023, detailing existing site conditions and proposed new development. The document includes a legend for identifying materials, construction methods (electric, heat, gasoline, solar), and waste materials, serving as a technical specification for site preparation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Host Site Pull-Through Pavement Plan (C-1.10): Technical pavement and site plan detail dated July 15, 2023. The document specifies material layers for crushed aggregate, shoulder dimensions, and layout details for the Social Core Area, hiking trails, and camping units 1-10.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Informal 3 Panel Kiosk Plan Details: Technical drawing specifications and plan views for a 3-panel kiosk, including roof framing and connection details across multiple sections (A-A through I-I).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for New Campground Top Road Plan Detail: Technical specification document detailing dimensions and requirements for the New Campground Top Road, including specific measurements for shoulders, rail directions, and spray applications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Shore Comprehensive Site Plan: Technical site and street plan for the North Shore residential development. The document includes a comprehensive street plan, map legends for land use and agency jurisdictions (BLM, USFS, NPS, etc.), and land use regulations aimed at preserving natural resources and promoting sustainable economic growth.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Outdoor Shower Plan Details - Installation Specifications: Technical installation specifications for an outdoor shower, dated July 2019. The document includes requirements for stainless steel surface carriers, adhesive standards, and multiple section views (A through H) for hardware connections.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Painting and Striping Plan: Technical painting and striping plan detailing requirements for reflective paint, staking responsibilities, and the painting of seventeen rounds. Includes notes on surface quality and alignment with Forest Service instructions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Site Utility Plan South - Water Main Specifications: Technical site utility plan for the South area, dated January 2023. The document specifies 100-inch PVC water mains and includes a table of information for water main headers and sectionals, along with survey data completed by N. Ortiz.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Site Utility System Details - Hydraint Section: Technical specifications and section views for a hydraint installation, including HDPE concrete thrust block requirements, burial depths, and concrete foundation height limits. The document specifies compliance with ASTM D-128 standards and requires work to be performed by trained electrical/plumbing personnel.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Site Utility System Details - Trenches: Technical drawing specifications and detail sheets for site utility systems, specifically focusing on electrical, water, and sewer line trenching details, including depth requirements, marker tape placement, and section views.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Site Utility System Details - Valve and Electric Pedestal: Technical drawing details and specifications for site utility systems, specifically covering cube valve box details, RV power pedestal panels, drywall removable panels, and concrete pavement receptacle connection instructions, including containment element height and load capacity data.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Social Core Area Installation (TPU) - Plan View Details: Technical specifications and plan view details for the Social Core Area Installation (TPU), including pipe dimensions (1 1/4 inch diameter, 10 feet length), water flow rate (20 gpm), and pressure (60 psi). The document references design for a new utility pole system with stormwater management improvements dated March 2023.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Toilet Parking Area Plan (C-116 to C-119): Technical drawing specifications and plan views for a toilet parking area project. The document includes cross-sections (A-A), plan views (C-116), and details regarding road construction, including the obliteration of an existing loop road, subbase reuse, and the installation of wheel stops and hydraulic washers.
DOCX
DOCX, High priority: read this first30 pages · wage-determination
HighAI Summary for Wage Determination No. MO100001: General Decision Number MO100001, dated July 9, 2010, specifies the prevailing wage rates and fringe benefits for heavy and highway construction projects statewide in Missouri. It details specific labor rates for carpenters, electricians, and power equipment operators across various counties.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Watercress Rec. Area RSI Project - South Access Plan: Technical drawing and specifications for the South Access Plan of the Watercress Rec. Area RSI Project within the Mark Twain National Forest (Region Nine, USDA Forest Service). The document details rail construction, including 1.5-inch diameter steel pipe posts and rails, sonotube placement, and painting requirements for steel components. Dated February 9, 1994, and designed by Facilities Engineer A. Garrison.
DOC
DOC, High priority: read this first170 pages · specifications
HighAI Summary for Watercress Recreation Area Recreation Site Improvement Project Specifications: Dated February 12, 2010, this document provides detailed technical specifications for the rehabilitation and reconstruction of the Watercress Recreation Area in the Mark Twain National Forest, Missouri. The scope includes demolition of existing facilities, concrete work, masonry, plumbing, electrical installations, and site improvements. It outlines specific divisions of work (01-33) and identifies several Optional Bid Items (OBI) such as boardwalks, viewing platforms, and river bank reconstruction.
DOC
DOC, High priority: read this first35 pages · rfp
HighAI Summary for Watercress Recreation Site Improvement Project - AG-64R4-S-10-0008: Construction RFP (Solicitation No. AG-64R4-S-10-0008) issued by the USDA Forest Service for the Watercress Recreation Site Improvement Project at Mark Twain National Forest. Issued July 12, 2010, with offers due by August 12, 2010. The project has an estimated price range of $500,000 to $1,000,000 and includes a detailed schedule of items covering mobilization, demolition, concrete work, plumbing, electrical, and earth work. Performance is required within 120 calendar days of award.
DOC
DOC, High priority: read this first14 pages · rfp
HighAI Summary for Watercress Recreation Site Improvement Project - Solicitation AG-64R4-S-10-0008: A construction solicitation (RFP/IFB) issued by the USDA Forest Service for the Watercress Recreation Site Improvement Project at Mark Twain National Forest. Issued July 12, 2010, with a proposal deadline of August 12, 2010. The project has an estimated price range between $500,000 and $1,000,000 and includes a detailed schedule of items covering mobilization, demolition, concrete, plumbing, electrical, and earth work.
PDF
PDF, Low priorityother
LowAI Summary for 15CampingSpurEPlanDetail: The document contains a single disclaimer stating that all specifications are subject to change without notice. No substantive procurement details are provided.
DOC
DOC, Low priority2 pages · past-performance
LowAI Summary for Experience and Past Performance Questionnaire: A questionnaire used to evaluate a contractor's experience, past performance, and organizational capacity. It collects data on business type, years of experience, completed projects, current commitments, personnel, and equipment to verify the contractor's capability to perform a project for the Forest Service.
PDF
PDF, Low priorityspecifications
LowAI Summary for Site Utility Plan North: A site map and utility plan dated 12/20/2023 for a park area, detailing access restrictions, parking limits, scenic drive loops, and safety warnings regarding weather and water releases.
PDF
PDF, Low priorityother
LowAI Summary for Watercress Cover Sheet - USDA Forest Service: The document appears to be a map legend or cover sheet for a site area involving the USDA Forest Service, featuring details on waterfall areas, forest management, water treatment plants, and highway access (I-90) in Van Buren, OR.
DOCX
DOCX, Low priority1 page · q-and-a
LowAI Summary for Watercress RSI Pre-proposal Site Visit Notes 07/21/2010: Meeting notes from a pre-proposal site visit on July 21, 2010, for the Watercress RSI project. The document records attendees, delivery estimates for toilet buildings, electrical design responsibilities, and specific Q&A regarding railing footings, asphalt sealant locations, and host site electrical items.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
3 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
Response deadline changed from Jul 19, 2010 to Aug 12, 2010. The notice description changed.
Notice updated
The notice description changed.
Deadline changed
Response deadline changed from Aug 12, 2010 to Aug 19, 2010.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Agriculture → Eastern Region USDA Forest Service
A Request for Proposals (RFP) will be issued for the reconstruction and rehabilitation of the Watercress Recreation Area of the Eleven Point Ranger District of the Mark Twain National Forest located in Carter County, Van Buren, Missouri. Work will include, but is not limited to, the following components: mobilization of workforce, equipment and materials; demolition, removal and disposal of existing structures; grinding and reuse of existing road and spur asphalt; concrete work for installation of new toilet base, walkway, ramp, staircase, handrails, water hydrant bases, fire ring bases, concrete wheel stops, and outdoor shower base; construction of information kiosk; installation of campground signage; painting and striping of campground roads; installation of government-furnished campground site furniture; reconstruction of eroded river bank; plumbing work associated with installation of flush toilet, water hydrants and outdoor shower; electrical work for recreation site improvements; earthwork including clearing and grubbing, excavation and backfill, aggregate placement, raking, mulching and seeding; asphalt pavement of campground roads, camping spurs and dumpster pad; and incidental work necessary to complete the project in accordance with the drawings and specifications of the solicitation. This solicitation will be open to both large and small businesses pursuant to the Small Business Competitiveness Demonstration Program. HUBZone small business concerns will be given a 10% price evaluation preference. The estimated price range of this project is between $500,000 and $1,000,000. The applicable NAICS is 237990, Size Standard: $33.5 million. Offerors must be registered in the Central Contractor Registry (www.ccr.gov) in accordance with FAR 52.204-7 prior to award. Failure to register will result in the proposal being removed from consideration for award. Solicitation No. AG-64R4-S-10-0008 will be available for downloading from this website on or about July 12, 2010. No hard copies of the solicitation will be mailed. Interested vendors should register to receive notifications through this site.