Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Wavecrest Coastal Trail Phase 2

Forecast
EPIMS-SMO-61525-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Wavecrest Coastal Trail Phase 2 project, executed under Lake and Streambed Alteration Agreement EPIMS-SMO-61525-R3, is an environmental and infrastructure initiative in Half Moon Bay, California. The project, led by the Coastside Land Trust and approved by the California Department of Fish and Wildlife on September 26, 2025, focuses on constructing permanent beach access stairs at the Wavecrest blufftops. This construction aims to connect the public to a recently completed segment of the California Coastal Trail while replacing informal, unsafe trails that have caused significant blufftop erosion and vegetation disruption. The scope of work includes redirecting blufftop drainage into the channel below and restoring riparian vegetation to mitigate environmental impacts and enhance local habitats. The project is governed by Fish and Game Code section 1602 and California Code of Regulations section 15096, with the California Department of Fish and Wildlife serving as the responsible agency for regulatory oversight and enforcement of mitigation measures. While the project was determined to have no significant environmental impact within the agency's jurisdiction, specific mitigation requirements for habitat protection and erosion control were mandated as conditions of approval.

General Info

Coastside Land Trust will build beach access stairs and restore vegetation in Half Moon Bay.

Place of Performance

Half Moon Bay, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS-SMO-61525-R3, pursuant to Fish and Game Code section 1602, to the project Applicant, Coastside Land Trust. The project involves constructing beach access stairs connecting to a recently completed segment of the California Coastal Trail for public use at the Wavecrest blufftops in Half Moon Bay, CA, replacing casual beach access trails that have contributed to blufftop erosion, vegetation disruption, and unsafe access for visitors as well as redirecting blufftop drainage into the channel below and restoring riparian vegetation.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 23 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS