Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on November 28, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Well 32 Rehabilitation

Closed
13-6433State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work covers approximately 50 acres and 35 or more buildings, requiring mowing to a height of 3 to 4 inches, string trimming, edging, and general cleanup. The contract is for an initial one-year term with four optional one-year renewals. The award will be granted to a responsible offeror whose quote is technically acceptable and represents the lowest price. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. To be considered technically acceptable, offerors must be registered in the State of Kentucky and verified through the SAM portal. Required submission documents include a technical and price proposal, a staffing plan, a safety program, proof of insurance, a description of available equipment, and three references for similar contracts. The contract mandates strict adherence to the Davis-Bacon Act and Contractor Wage Rate Requirements, specifically Wage Determination Number KY20210041. Consequently, contractors must submit weekly certified payroll and a signed Statement of Compliance with every invoice to receive payment. All work is subject to inspection by the Center, and any identified deficiencies must be corrected within 48 hours at no additional cost. Quotes are due by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 3 hours ago

DEADLINE

in about 23 hours

AI Contract Overview

Show more

The contract involves a comprehensive rehabilitation project for Well 32 located at Morrison Park, encompassing construction activities across three key sites: Morrison Park itself, adjacent city street rights-of-way along Westwood Avenue, Memory Lane, and Bristol Street, and the John Garthe Reservoir site. At Morrison Park, the scope includes demolishing the existing underground well vault, valves, piping, and facilities, followed by raising the well pump structure to grade level. A new above-ground well building will be constructed with CMU walls on a concrete pad, featuring a flat roof with a parapet, and will house mechanical, electrical, instrumentation, and control systems. The project also involves yard piping, site improvements, irrigation, landscaping, and enhancements to recreational facilities such as resurfacing basketball and tennis courts, replacing fencing, and upgrading lighting and electrical systems. In the rights-of-way, approximately 3,700 linear feet of 12-inch well discharge piping will be installed from Morrison Park to the John Garthe Reservoir, including the removal and replacement of existing piping within a bridge cell, support structures, thrust restraints, pipeline attachments to the bridge, pavement repairs, and traffic control measures. At the John Garthe Reservoir site, construction will include a chemical building equipped with sodium hypochlorite generation equipment for disinfection, along with associated piping, pressure control, and chemical injection vaults. Electrical upgrades at the John Garthe Pump Station are also part of the scope. The project is solicited under the title "Well 32 Rehabilitation," with a response deadline of January 26, 2023, and is managed by Santa Ana Public Works in California.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Ana Public Works
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
This work is for the rehabilitation of the existing Well 32 located at MorrisonPark and includes construction at the following three locations: Morrison Park; within the Citystreet rights-of-way along Westwood Avenue, Memory Lane, and Bristol Street; and at the JohnGarthe Reservoir site.At Morrison Park, the work includes: the demolition of the existing underground well vault,valves, piping and facilities; raising the well pump structure to grade, including associated wellcasing, column and appurtenances; new above ground well building with a pump and electricalroom, including well pump/motor, well discharge and well to waste valves and piping; yardpiping; site improvements, irrigation and landscaping improvements; and the Morrison Parkimprovements consisting of the repair and resurfacing of the basketball/ tennis courts,replacement of the tennis court fence enclosure, and replacement of the court lighting andcorresponding electrical facilities. The well building will be constructed of CMU walls on aconcrete pad with a flat roof (with a parapet) and will include the corresponding mechanical,electrical, instrumentation and control facilities.Within City street rights-of-way, the 12-inch well discharge piping, with parallel fiber opticfacilities, will be constructed from the well site at Morrison Park to the John Garthe Reservoirsite. The alignment is approximately 3,700 LF and includes removal/replacement of an existingpipe within an existing bridge cell for approximately 100 LF. Supports, thrust restraints andattachments to the bridge as well as the necessary pipeline appurtenances, pavement replacementand necessary traffic control are a part of this scope of work.At the John Garthe Reservoir site, the work includes construction of a chemicalbuilding/restroom facility and associated on-site piping, including pressure control and chemicalinjection vaults. The proposed chemical building will house the City’s standard disinfectionsystem (sodium hypochlorite generation equipment). The building will be constructed of CMUwalls on a concrete pad with a gabled roof including the corresponding plumbing, mechanical,electrical, instrumentation and control facilities. In addition, electrical upgrades to the JohnGarthe Pump Station are a part of this scope of work at this site.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS