Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on January 8, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Well Drilling Service

Closed
2020-44State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 213111
New
SLED
ODNR, Division of Oil & Gas – OWP – Federal Project –Scioto 3F - 2 Wells
Solicitation # SRC0000042633
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for the Scioto 3F Project to plug and plate two orphan wells, Oertels Corner #1 and Romanello #1, located in Jefferson Township, Scioto County. The scope of work encompasses mobilization, well site development, drilling or cleaning out and plugging of the wells, decommissioning and disposal of all casing and production equipment, and full restoration of disturbed areas. Key technical deliverables include the installation of cement plugs from 210 feet to within 30 inches of ground level and the maintenance of strict well control throughout the process. Work must be performed in accordance with Ohio Revised Code 1509 and Ohio Administrative Code Chapters 1501:9-11 and 1501:9-12. As a federally funded project, contractors must comply with Davis-Bacon prevailing wage requirements and Buy America sourcing mandates for iron, steel, and manufactured construction materials. Eligible bidders must be active on CSP900922 (DAS Index No. MAC110), attend the mandatory pre-bid meeting on November 4, 2026, and be in good standing with the agency. The contract will be awarded to the lowest responsive and responsible bidder based on submissions via OhioBuys. Performance must begin within three months of the contract end date and be completed by May 1, 2027, or five months after the effective date, whichever is sooner. Invoicing is managed through the Orphan Well Project Management Contractor Portal and requires supporting documentation, including payroll reports for federal compliance.
Dnr900200 Oil And Gas Dnrfra

POSTED

5 days ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The City of Flagstaff is seeking proposals from licensed Arizona firms to provide comprehensive drilling services for a new water well at Fort Tuthill 2. The project involves drilling, casing, development, and aquifer testing of a single water production well, with oversight provided by the City’s hydrogeologist and engineering support from Tata & Howard. The well is to be constructed following a detailed conceptual design that specifies drilling via dual rotary methods, installing intermediate casing above the groundwater table, and extending 16-inch diameter casing to approximately 1,800 feet, with completion using louvered casing and filter pack to about 2,500 feet. The work includes supplying all materials, including casing and cement grout, with engineering data to be submitted for approval. Aquifer testing is planned for around seven days, with pumping rates estimated between 300 and 1,000 gallons per minute, which will be determined during construction. The well will ultimately be fitted with permanent submersible pumps and downhole equipment under a separate contract. The solicitation, titled "Well Drilling Service" with solicitation number 2020-44, was posted on January 8, 2020, with a response deadline of February 5, 2020. The project falls under NAICS code 213111 and is managed by the City of Flagstaff, Arizona. Interested firms can contact Emily Markel via email or phone for further information. The contract emphasizes adherence to technical specifications, oversight during all phases of drilling and testing, and the supply of all necessary materials to ensure the successful completion of the well in accordance with the approved design and project requirements.

General Info

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

2

Solicitation 2020-44: Well Drilling Service

PDF, High priority: read this firstrfp
High

Contract No. 2020-44 - Well Drilling Services

PDF, Low prioritycontract-document
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → City of Flagstaff
Contacts1 person available
OfficeN/A
Organization / AgencyArizona → City of Flagstaff
Office AddressN/A

Full Description

Show more
The City of Flagstaff (Owner) is seeking Proposals from Arizona licensed firms to provide Drilling Services: The City of Flagstaff’s is requiring a new water well to be drilled at Fort Tuthill 2.The work to be accomplished under the following technical specifications consists of drilling, casing, development and aquifer testing of one water production well for the City of Flagstaff (City) referenced as Fort Tuthill Well 2. The City has contracted ATC Group Services LLC (ATC) as the prime consultant Hydrogeologist to develop the conceptual well design, technical specifications and oversee drilling and subsequent testing of the well. ATC has subcontracted Tata & Howard (T&H) as the Engineer to provide technical support for the project.Fort Tuthill Well 2 shall be installed in accordance with the conceptual well design presented in this technical specification document. All materials including casing and cement grout shall be supplied and purchased by the Contractor. Engineering data covering all equipment and fabricated materials, which will become a permanent part of the work under this contract, shall be submitted to the City. The drilling, casing, development and aquifer testing of the well shall be conducted under the observation of the Hydrogeologist, Engineer and/or a representative from the City.The conceptual well design for Fort Tuthill Well 2 includes drilling of the well by the dual rotary drilling method with intermediate casing strings (above the groundwater table) and 16-inch diameter casing advanced to approximately 1,800 feet followed by completion of the well with louvered casing and filter pack to approximately 2,500 feet. Aquifer testing of the well is estimated at seven days with pumping rates that can range from 300 to 1,000 gallons per minute (gpm) which will be estimated during well construction. The well will eventually be equipped with permanent submersible pumping and downhole equipment under a separate contract.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS