Well Head and Electrical Controls Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for the Stockton East Water District involves the installation of well head assemblies and electrical control systems at the Dr. Joe Waidhofer Water Treatment Plant in Stockton, California. The selected contractor will be responsible for installing well caps, running power and control cabling, and implementing Variable Frequency Drives or starters to ensure a fully powered and controlled well system. All electrical work must be performed in accordance with the National Electrical Code and connected to the existing plant power grid. To be eligible for this project, the contractor must hold a valid C-10 Electrical Contractor license.
General Info
Agency
Place of Performance
Stockton, CA, 95215Set-Aside
Documents
This scope was carved out of 2022090402.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
Extraction Well No. 2
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Read the full solicitation package
This scope is part of a larger contract. Its documents live on the prime.
- 1 document on the prime contractFrom Extraction Well No. 2
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
